← Back
Single or multiple dwelling with stores or offices
118-02 101 AVENUE
QUEENS · BIN 4200516
💬 Discuss this project
1910Year Built
3Stories
S9Building Class
R6BZoning
4,059 sfGross Floor Area
4Units
1 Open Violation ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 11802 101 AVENUE LLC · 1,980 sf lot · 2.05 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneralOther
Roof5p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THE MTM DESIGN GROUP, LLC504/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COMCELL CONSTRUCTION CORP.General Contractor304/09/2026
RC3 ELECTRIC, LLCGeneral Contractor304/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THE MTM DESIGN GROUP, LLC1319504/21/2025
Building Lifecycle
All (56)Filed (5)Permit Issued (5)Signed Off (3)Violation (24)Objection (16)Special Inspection (3)
03/17/2026
Signed off — Alteration
Installation of safety railing along existing roof hatch. No change in use, egress, or occupancy.
Q00339958-I1
03/17/2026
Signed off — Alteration
Installation of safety railing along existing roof hatch. No change in use, egress, or occupancy.
Q00339958-S1
10/22/2025
Permit issued — Antenna
Q00339958-I1-AN
10/22/2025
Permit issued — General Construction
Q00339958-S1-GC
04/21/2025
Filed — Alteration
Installation of safety railing along existing roof hatch. No change in use, egress, or occupancy.
Q00339958-S1
04/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Toms
03/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
Robert Toms
03/06/2025
Special inspection requirement — Final
Robert Toms
08/02/2023
Filed — Alteration
Installation of safety railing along existing roof hatch. No change in use, egress, or occupancy.
Q00339958-P2
02/17/2022
Permit issued — Antenna
Q00339958-I1-AN
12/02/2021
Filed — Alteration
Installation of safety railing along existing roof hatch. No change in use, egress, or occupancy.
Q00339958-P1
04/17/2021
Violation issued (ECB, closed)
Construction
12/09/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/13/2020
Violation issued (ECB, closed)
Construction
10/19/2020
Permit issued — Antenna
Q00339958-I1-AN
09/09/2020
Violation issued (ECB, closed)
Construction
06/19/2020
Objection raised — 2014-AN BC 1704-Building Code-
06/19/2020
Objection resolved — Addressed
06/19/2020
Objection raised — 2014-AN AC 28-104.7.1-Administ
06/19/2020
Objection resolved — Addressed
06/19/2020
Objection raised — 1998-AN AC 28-103.14.1-Adminis
06/19/2020
Objection resolved — Addressed
06/19/2020
Objection raised — 1998-AN BC 501.3-Building Code
06/19/2020
Objection resolved — Addressed
06/18/2020
Filed — Alteration
Installation of safety railing along existing roof hatch. No change in use, egress, or occupancy.
Q00339958-I1
05/11/2020
Signed off — Alteration
Installation of Verizon telecommunications antennas, GPS antennas, small cell equipment cabinets, and an equipment cabinet on the roof. All work in conformance with TPPN #5/98. No change in use, egress, or occupancy.
Q00000421-I1
01/22/2020
Violation issued (ECB, closed)
Construction
01/09/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/19/2019
Violation issued (ECB, closed)
Construction
09/04/2019
Violation issued (ECB, closed)
Construction
09/04/2019
Violation issued (ECB, closed)
Construction
08/15/2018
Permit issued — Antenna
Q00000421-I1-AN
06/06/2018
Violation issued (HPD, open)
C
03/26/2018
Violation issued (ECB, closed)
Construction
02/14/2018
Objection raised — 1998-AN BC 501.3-Building Code
02/14/2018
Objection resolved — Addressed
02/14/2018
Objection raised — 2014-AN BC 3108.3 & BC 3108.4-
02/14/2018
Objection resolved — Addressed
02/14/2018
Objection raised — 2014-AN BC 1704-Building Code-
02/14/2018
Objection resolved — Addressed
02/14/2018
Objection raised — 1998-AN AC 28-103.14.1-Adminis
02/14/2018
Objection resolved — Addressed
02/12/2018
Filed — Alteration
Installation of Verizon telecommunications antennas, GPS antennas, small cell equipment cabinets, and an equipment cabinet on the roof. All work in conformance with TPPN #5/98. No change in use, egress, or occupancy.
Q00000421-I1
11/16/2016
Violation issued (HPD, closed)
B
06/17/2015
Violation issued (HPD, closed)
C
06/17/2015
Violation issued (HPD, closed)
B
06/17/2015
Violation issued (HPD, closed)
A
06/17/2015
Violation issued (HPD, closed)
B
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offRC3 ELECTRIC, LLC10/22/2025
DOB NOWGeneral ConstructionSigned-offRC3 ELECTRIC, LLC10/22/2025
DOB NOWAntennaSigned-offRC3 ELECTRIC, LLC02/17/2022
DOB NOWAntennaSigned-offCOMCELL CONSTRUCTION CORP10/19/2020
DOB NOWAntennaSigned-offCOMCELL CONSTRUCTION CORP08/15/2018
BISOTISSUEDNRPD CONSULTANCY LLC07/01/2021
BISOTISSUEDNRPD CONSULTANCY LLC04/14/2021
BISOTISSUEDCOMCELL CONSTRUCTION CORP.10/11/2018
1 project · most recent 03/04/2020
General Wiring
FiledStatusContractorScope
03/04/2020Permit IssuedMETROPOLITAN ELEC OF NY IGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
04/21/2025Fire-Resistant Penetrations and JointsRobert Tomsspecial
03/06/2025Tenant Protection Plan ComplianceRobert Tomsspecial
03/06/2025FinalRobert Tomsprogress
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Antenna3
08/26/2026Q00339958-P2Request digital key ↗
08/26/2026Q00339958-P1Request digital key ↗
08/26/2026Q00339958-I1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/26/2026Q00339958-S1Request digital key ↗
08/15/2026Q00000421-I1Request digital key ↗
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION3
06/30/2021421780629Open ↗
11/10/2018421603982Open ↗
06/28/2018421603982Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
02/20/2018421603982Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/29/2026Q00000421-I1Open ↗
08/26/2026Q00339958-P2Open ↗
08/26/2026Q00339958-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/02/2020421780629Open ↗
11/10/2018421603982Open ↗
02/20/2018421603982Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026Q00339958-S1Open ↗
08/30/2026Q00339958-S1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/06/2020421780629Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/06/2020421780629Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/30/2026Q00339958-S1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan4
08/15/2026Q00000421-I1Open ↗
08/13/2026Q00339958-I1Open ↗
08/13/2026Q00339958-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes1
08/06/2018421603982Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00339958-P1Open ↗
08/26/2026Q00339958-I1Open ↗
08/26/2026Q00339958-P2Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/20/2020421780629Open ↗
01/06/2020421780629Open ↗
02/20/2018421603982Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/02/2020421780629Open ↗
01/06/2020421780629Open ↗
02/20/2018421603982Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/06/2022421780629Open ↗
05/13/2020421603982Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/13/2020421603982Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00339958-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/06/2022421780629Open ↗
▸BISFINAL INSPECTION1
09/08/2021421780629Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/24/2020421780629Open ↗
03/24/2020421780629Open ↗
10/20/2018421603982Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/28/2022421780629Open ↗
05/18/2020421603982Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT6
04/06/2022421780629Open ↗
09/13/2021421780629Open ↗
12/02/2020421780629Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/08/2021421780629Open ↗
▸BISUPDATE COST AFFIDAVIT ESTIMATE (PW3)1
04/28/2022421780629Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
03/24/2020421780629Open ↗
03/20/2020421780629Open ↗
10/20/2018421603982Open ↗
▸BISEFILING COVER SHEET2
01/06/2020421780629Open ↗
02/20/2018421603982Open ↗