← Back
Predominantly retail with other uses
116-22 LIBERTY AVENUE
QUEENS · BIN 4204076
💬 Discuss this project
1921Year Built
2Stories
K4Building Class
R6BZoning
—Gross Floor Area
4Units
23 Open Violations ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: 126 REALTY CORP · 1.7 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SD DESIGN STUDIO407/08/2026
126 REALTY CORP303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JIMENEZ BUILDING CONSULTING LLC110/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WINWAY DEVELOPMENT LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YANG ENGINEERING LLC8376110/22/2024
Building Lifecycle
All (60)Filed (1)Permit Issued (1)Signed Off (1)Violation (49)Special Inspection (8)
11/25/2025
Violation issued (ECB, closed)
Construction
10/31/2024
Signed off — Alteration
PROPOSE FILE APPLICATION TO OBTAIN EQUIPMENT USE PERMIT FOR HVAC UNIT ON THE ROOF. ALL MECHANICAL DUCTWORK WERE DONE UNDER DOB JOB#: 421949422. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q01130262-I1
10/24/2024
Permit issued — Mechanical Systems
Q01130262-I1-MS
10/22/2024
Filed — Alteration
PROPOSE FILE APPLICATION TO OBTAIN EQUIPMENT USE PERMIT FOR HVAC UNIT ON THE ROOF. ALL MECHANICAL DUCTWORK WERE DONE UNDER DOB JOB#: 421949422. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q01130262-I1
10/21/2024
Special inspection requirement — Mechanical Systems
Jian Yang
10/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
10/21/2024
Special inspection requirement — Final
Jian Yang
10/21/2024
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
10/21/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
10/21/2024
Special inspection requirement — Maintenance information
Jian Yang
10/21/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
10/21/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/27/2018
Violation issued (FDNY_NOV, closed)
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/09/2016
Violation issued (ECB, closed)
Boilers
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/05/2012
Violation issued (HPD, open)
A
12/05/2012
Violation issued (HPD, open)
B
12/05/2012
Violation issued (HPD, open)
A
12/05/2012
Violation issued (HPD, open)
B
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/01/2002
Violation issued (HPD, open)
B
02/01/2002
Violation issued (HPD, open)
B
02/01/2002
Violation issued (HPD, open)
B
02/01/2002
Violation issued (HPD, open)
B
02/01/2002
Violation issued (HPD, open)
B
01/21/2002
Violation issued (HPD, open)
B
01/21/2002
Violation issued (HPD, open)
B
01/21/2002
Violation issued (HPD, open)
B
01/21/2002
Violation issued (HPD, open)
B
12/30/2001
Violation issued (HPD, open)
B
12/30/2001
Violation issued (HPD, open)
B
12/30/2001
Violation issued (HPD, open)
B
12/30/2001
Violation issued (HPD, open)
B
12/30/2001
Violation issued (HPD, open)
B
12/30/2001
Violation issued (HPD, open)
B
12/30/2001
Violation issued (HPD, open)
B
12/30/2001
Violation issued (HPD, open)
B
12/22/2001
Violation issued (HPD, open)
B
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/03/1997
Violation issued (FDNY_NOV, closed)
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offWINWAY DEVELOPMENT LLC10/24/2024
BISMHISSUEDON TIME CONSTRUCTION INC05/02/2019
BISPLISSUEDSO PLUMBING & HEATING INC04/25/2019
BISOTISSUEDON TIME CONSTRUCTION INC04/16/2019
BISBLISSUEDVITO VALENTINI02/12/1998
1 project · most recent 04/30/2019
General Wiring
FiledStatusContractorScope
04/30/2019CompleteINTELOGIC ELECTRIC, INC.General Wiring
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
10/21/2024Mechanical SystemsJian Yangspecial
10/21/2024Fire-Resistant Penetrations and JointsJian Yangspecial
10/21/2024FinalJian Yangprogress
10/21/2024Energy Code Compliance InspectionsJian Yangprogress
10/21/2024HVAC-R and service water piping design and insulationJian Yangenergy_progress
10/21/2024Maintenance informationJian Yangenergy_progress
10/21/2024HVAC-R and service water heating equipmentJian Yangenergy_progress
10/21/2024HVAC-R and service water heating system controlsJian Yangenergy_progress
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01130262-I1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION6
09/08/2020421949422Open ↗
08/13/2020421949422Open ↗
12/30/2019421949422Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
05/13/2019421949422Open ↗
05/13/2019421949422Open ↗
05/06/2019421949422Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026Q01130262-I1Open ↗
08/22/2026Q01130262-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/02/2019421949422Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/02/2019421949422Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/02/2019421949422Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026Q01130262-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026Q01130262-I1Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
12/13/2019421949422Open ↗
10/09/2019421949422Open ↗
09/19/2019421949422Open ↗
Showing 3 of 6 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/15/2020421949422Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
09/15/2020421949422Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
05/02/2019421949422Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/02/2019421949422Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026Q01130262-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/02/2019421949422Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/15/2020421949422Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/15/2020421949422Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/15/2020421949422Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/20/2020400810841Open ↗
09/15/2020421949422Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/15/2020421949422Open ↗
05/02/2019421949422Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
09/08/2020421949422Open ↗
07/29/2019421949422Open ↗
▸BISBOROUGH INTAKE FORM1
07/31/2019421949422Open ↗
▸BISEFILING COVER SHEET1
05/02/2019421949422Open ↗