← Back
Gas or electric utility
89-67 162 STREET
QUEENS · BIN 4208878
💬 Discuss this project
0Year Built
—Stories
U2Building Class
C4-4DZoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Gas or electric utility · Owner of record: BROOKLYN UNION GAS COMPANY · 10,811 sf lot · 0 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NATIONAL GRID903/22/2026
KEYSPAN CORP103/22/2026
BROOKLYN UNION GAS CO303/22/2026
BRROKLYN UNION GAS COMPANY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
H2M ARCHITECTS AND ENGINEERS203/13/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H2M ARCHITECTS + ENGINEERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CLUNE CONSTRUCTION CO LPGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TOWER CONSULTING ENGINEER7310203/13/2026
Building Lifecycle
All (65)Filed (2)Permit Issued (1)Violation (48)Objection (2)Special Inspection (12)
04/02/2026
Special inspection requirement — Structural Steel - Welding
HAMZA MURTAZA
04/02/2026
Special inspection requirement — Structural Steel - High Strength Bolting
HAMZA MURTAZA
04/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
HAMZA MURTAZA
04/02/2026
Special inspection requirement — Structural Steel - Details
HAMZA MURTAZA
04/02/2026
Special inspection requirement — Structural Cold-Formed Steel
HAMZA MURTAZA
04/02/2026
Special inspection requirement — Final
HAMZA MURTAZA
03/13/2026
Filed — Alteration
Evaluate and demolish existing stoop, sidewalk and ceiling of vault structure. Replace steel members and concrete slabs under severe structural deformity. Pour reinforced vault slab and waterproof the vaulted structure. Repour side walk/stoop.
Q01054885-P2
03/05/2026
Special inspection requirement — Structural Cold-Formed Steel
HAMZA MURTAZA
03/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
HAMZA MURTAZA
03/05/2026
Special inspection requirement — Structural Steel - Details
HAMZA MURTAZA
03/05/2026
Special inspection requirement — Structural Steel - High Strength Bolting
HAMZA MURTAZA
03/05/2026
Special inspection requirement — Structural Steel - Welding
HAMZA MURTAZA
03/05/2026
Special inspection requirement — Final
HAMZA MURTAZA
06/26/2025
Permit issued — General Construction
Q01054885-I1-GC-CX
06/26/2024
Objection resolved — Addressed
06/07/2024
Objection raised — Scope
05/31/2024
Filed — Alteration
Evaluate and demolish existing stoop, sidewalk and ceiling of vault structure. Replace steel members and concrete slabs under severe structural deformity. Pour reinforced vault slab and waterproof the vaulted structure. Repour side walk/stoop.
Q01054885-I1
11/18/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/07/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/18/2018
Violation issued (FDNY_ORDER, closed)
12/17/2018
Violation issued (FDNY_NOV, closed)
09/13/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/04/2017
Violation issued (FDNY_NOV, closed)
12/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/30/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/18/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/10/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/29/2014
Violation issued (FDNY_ORDER, closed)
04/29/2014
Violation issued (FDNY_NOV, closed)
10/09/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/18/2013
Violation issued (FDNY_NOV, closed)
10/17/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/24/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/24/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/09/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/03/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/10/2007
Violation issued (ECB, closed)
Elevators
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/04/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/07/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/10/2001
Violation issued (FDNY_NOV, closed)
04/12/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/13/2000
Violation issued (FDNY_NOV, closed)
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/09/1993
Violation issued (ECB, closed)
Boilers
08/12/1992
Violation issued (ECB, closed)
Elevators
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCLUNE CONSTRUCTION CO LP06/26/2025
BISOTISSUEDR.W. DAKE & CO.,INC05/09/2023
BISMHISSUEDSJS CONSTRUCTION CO., INC.08/04/2017
BISMHISSUEDMATCO SERVICE CORP02/29/2016
BISEQISSUEDSAFWAY STEEL PRODUCTS12/26/1996
BISOTISSUEDINTERIOR CONCCEPTS CONST INC05/29/1996
BISBLISSUEDM-A PLUMBING04/08/1993
BISMHISSUEDB.P. AIR CONDITIONING CORP02/04/1993
BISMHISSUEDB.P. AIR CONDITIONING CORP05/04/1992
1 project · most recent 10/06/2025
General Wiring
FiledStatusContractorScope
10/06/2025Permit IssuedATLAS-ACON ELEC. SERVICEGeneral Wiring
1 project · most recent 03/13/2026
Steel Concrete
FiledStatusContractorScope
03/13/2026Permit IssuedCLUNE CONSTRUCTION CO LPSteel, Concrete
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
04/02/2026Structural Steel - WeldingHAMZA MURTAZAspecial
04/02/2026Structural Steel - High Strength BoltingHAMZA MURTAZAspecial
04/02/2026Structural Stability – Alterations of existing buildingsHAMZA MURTAZAspecial
04/02/2026Structural Steel - DetailsHAMZA MURTAZAspecial
04/02/2026Structural Cold-Formed SteelHAMZA MURTAZAspecial
04/02/2026FinalHAMZA MURTAZAprogress
03/05/2026Structural Cold-Formed SteelHAMZA MURTAZAspecial
03/05/2026Structural Stability – Alterations of existing buildingsHAMZA MURTAZAspecial
03/05/2026Structural Steel - DetailsHAMZA MURTAZAspecial
03/05/2026Structural Steel - High Strength BoltingHAMZA MURTAZAspecial
03/05/2026Structural Steel - WeldingHAMZA MURTAZAspecial
03/05/2026FinalHAMZA MURTAZAprogress
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026Q01054885-I1Request digital key ↗
08/17/2026Q01054885-P2Request digital key ↗
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION19
11/14/2023400605626Open ↗
11/14/2023400605626Open ↗
02/10/2022400605626Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION5
07/19/2023410111007Open ↗
06/23/2023410111007Open ↗
08/08/2017421532201Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/17/2023410111007Open ↗
▸Seals & Professional Certifications27
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026Q01054885-I1Open ↗
09/01/2026Q01054885-I1Open ↗
09/01/2026Q01054885-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
05/07/2019421233132Open ↗
05/07/2019421233132Open ↗
09/11/2018421532201Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/25/2017421532201Open ↗
05/13/2008410111007Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026Q01054885-P2Open ↗
08/17/2026Q01054885-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q01054885-I1Open ↗
08/24/2026Q01054885-P2Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/13/2008410111007Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/25/2017421532201Open ↗
▸Trade Schedules & Equipment10
▸BISEQUIPMENT USE PERMITS7
10/20/2018421532201Open ↗
10/20/2018421532201Open ↗
10/20/2018421532201Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
10/20/2018421532201Open ↗
10/20/2018421532201Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
03/01/2013420579118Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/05/2015421233132Open ↗
06/12/2012420579118Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/13/2008410111007Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/17/2026Q01054885-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
09/11/2018421532201Open ↗
08/08/2017421532201Open ↗
07/25/2017421532201Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
05/07/2019421233132Open ↗
10/20/2018421532201Open ↗
▸Inspections & Test Reports1
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
01/31/2024410111007Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
03/07/2024410111007Open ↗
11/19/2021420579118Open ↗
05/13/2019421233132Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
06/11/2012420579118Open ↗
05/13/2008410111007Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026Q01054885-I1Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT8
11/12/2021420579118Open ↗
10/28/2021420579118Open ↗
05/07/2019421233132Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/31/2024410111007Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET4
07/25/2017421532201Open ↗
11/05/2015421233132Open ↗
06/11/2012420579118Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
02/12/2021410111007Open ↗
08/16/2017421532201Open ↗
02/19/2016421233132Open ↗
▸BISBOROUGH INTAKE FORM1
09/11/2018421532201Open ↗