← Back
Office with commercial, 1-6 stories
46-41 VERNON BOULEVARD
QUEENS · BIN 4311868
💬 Discuss this project
1931Year Built
2Stories
O5Building Class
R6AZoning
9,500 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: VERNON LLC · 5,000 sf lot · 1.9 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 8 docs
Floor 1Under Construction3p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
E-J ELECTRIC INSTALLATION CO.608/26/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GILSANZ MURRAY STEFICEK LLP110/02/2025
OTJ ARCHITECTS109/10/2025
BKH ARCHITECT, PLLC111/25/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DUAL PURPOSE CORPORATIONGeneral Contractor203/21/2026
SCALI CONSTRUCTION INCGeneral Contractor208/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILROSE CONSULTANTS LLC2003210/02/2025
BKH ARCHITECT, PLLC6255111/25/2020
Building Lifecycle
All (41)Filed (3)Permit Issued (3)Signed Off (1)Violation (18)Objection (1)Special Inspection (15)
08/11/2026
Permit issued — Structural
Q01275311-S1-ST
06/25/2026
Permit issued — General Construction
Q01275311-I1-GC
10/22/2025
Objection raised — Scope
10/02/2025
Filed — Alteration
Filing herewith for door opening in the lot line masonry wall as per plans.
Q01275311-S1
09/10/2025
Filed — Alteration
Filing herewith for door opening in the lot line masonry wall as per plans.
Q01275311-I1
09/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
Benjamin Plotnick
09/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Plotnick
09/10/2025
Special inspection requirement — Sprayed fire-resistant materials
Benjamin Plotnick
09/05/2025
Special inspection requirement — Final
Benjamin Plotnick
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/14/2021
Signed off — Alteration
direct replace (3) three roof top units and direct replace (3) three on grade hvac units in rear yard
Q00432890-I1
11/25/2020
Filed — Alteration
direct replace (3) three roof top units and direct replace (3) three on grade hvac units in rear yard
Q00432890-I1
11/25/2020
Permit issued — Mechanical Systems
Q00432890-I1-MS
11/25/2020
Special inspection requirement — HVAC and service water heating equipment
Brandon Hamchuk
11/25/2020
Special inspection requirement — Duct leakage testing
Brandon Hamchuk
11/25/2020
Special inspection requirement — Shutoff dampers
Brandon Hamchuk
11/25/2020
Special inspection requirement — HVAC insulation and sealing
Brandon Hamchuk
11/25/2020
Special inspection requirement — HVAC and service water heating system controls
Brandon Hamchuk
11/25/2020
Special inspection requirement — Maintenance information
Brandon Hamchuk
11/25/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brandon Hamchuk
11/25/2020
Special inspection requirement — Energy Code Compliance Inspections
Brandon Hamchuk
11/25/2020
Special inspection requirement — Lowest Floor Elevation
Brandon Hamchuk
11/24/2020
Special inspection requirement — Mechanical Systems
Brandon Hamchuk
11/24/2020
Special inspection requirement — Final
Brandon Hamchuk
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedSCALI CONSTRUCTION INC08/11/2026
DOB NOWGeneral ConstructionPermit IssuedSCALI CONSTRUCTION INC06/25/2026
DOB NOWMechanical SystemsSigned-offDUAL PURPOSE CORPORATION11/25/2020
BISOTISSUEDPICK NICK HOME IMPROVEMENT & REP08/07/2003
BISPLISSUEDLAKESIDEN TECHNICAL PLG & HEATIN03/25/1997
BIS—ISSUEDINTEGRA CONST OF NEW YORK INC03/18/1997
BIS—ISSUEDALLSTATE RESTORATION CORP.08/01/1990
BISEQISSUEDALLSTATE RESTORATION CORP.08/01/1990
1 project · most recent 10/02/2025
Steel Masonry
FiledStatusContractorScope
10/02/2025Permit IssuedSCALI CONSTRUCTION INCSteel, Masonry
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
09/10/2025Fire-Resistance Rated ConstructionBenjamin Plotnickprogress
09/10/2025Fire-Resistant Penetrations and JointsBenjamin Plotnickspecial
09/10/2025Sprayed fire-resistant materialsBenjamin Plotnickspecial
09/05/2025FinalBenjamin Plotnickprogress
11/25/2020HVAC and service water heating equipment Brandon Hamchukenergy_progress
11/25/2020Duct leakage testing Brandon Hamchukenergy_progress
11/25/2020Shutoff dampersBrandon Hamchukenergy_progress
11/25/2020HVAC insulation and sealing Brandon Hamchukenergy_progress
11/25/2020HVAC and service water heating system controls Brandon Hamchukenergy_progress
11/25/2020Maintenance informationBrandon Hamchukenergy_progress
11/25/2020Fire-Resistant Penetrations and JointsBrandon Hamchukspecial
11/25/2020Energy Code Compliance InspectionsBrandon Hamchukprogress
11/25/2020Lowest Floor ElevationBrandon Hamchukprogress
11/24/2020Mechanical SystemsBrandon Hamchukspecial
11/24/2020FinalBrandon Hamchukprogress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/18/2026Q01275311-I1Request digital key ↗
08/18/2026Q01275311-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/27/2026Q00432890-I1Request digital key ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature10
08/25/2026Q01275311-I1Open ↗
08/22/2026Q00432890-I1Open ↗
08/22/2026Q00432890-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026Q01275311-I1Open ↗
08/22/2026Q00432890-I1Open ↗
08/22/2026Q00432890-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00432890-I1Open ↗
08/13/2026Q01275311-I1Open ↗
08/13/2026Q01275311-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q01275311-I1Open ↗
08/13/2026Q01275311-S1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00432890-I1Open ↗