← Back
Elevator apt, semi-fireproof without stores
20-20 SEAGIRT BOULEVARD
QUEENS · BIN 4440252
💬 Discuss this project
1952Year Built
6Stories
D1Building Class
R5Zoning
473,691 sfGross Floor Area
572Units
LL97 CoveredRent Stabilized20 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: ROCKAWAY ONE COMPANY, · 352,825 sf lot · 1.34 FAR built · Flood zone X500
Locations of Work
ArchitectureOther
Cellar2p · 1 filing · 20 docs
Basement3p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PELICAN MANAGEMENT2507/08/2026
AL ARSH CONSTRUCTION307/08/2026
ROCKAWAY OWE COMPANY103/22/2026
OWNER OF PREMISES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASR ENGINEERING PC101/24/2024
FIRM ENGINEERING, P.C.108/02/2023
GERALD CALIENDO ARCHITECTS904/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PELICAN MANAGEMENT203/21/2026
GERALD J CALIENDO ARCHITECT1803/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AL-ARSH CONSTRUCTION CORPGeneral Contractor207/08/2026
ARON CONSTRUCTION INCGeneral Contractor207/08/2026
EXPRESS PL SWR & WTR APlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BENAZZI ENGINEERING, PC5603108/02/2023
FIRM ENGINEERING, P.C.6012108/02/2023
J C PROFESSIONALS LLC1431804/06/2023
FRANKLIN & OAK, INC.5758303/06/2023
Building Lifecycle
All (111)Filed (11)Permit Issued (5)Signed Off (4)Violation (34)Inspection (7)Objection (20)Special Inspection (30)
07/02/2024
Signed off — Alteration
FACADE REPAIR WORK.
Q00908895-I1
03/03/2024
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00995043-I1
01/25/2024
Permit issued — Sidewalk Shed
Q00995043-I1-SH
01/24/2024
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00995043-I1
08/23/2023
Permit issued — General Construction
Q00908895-I1-GC
08/02/2023
Filed — Alteration
FACADE REPAIR WORK.
Q00908895-I1
08/02/2023
Special inspection requirement — Tenant Protection Plan Compliance
Gregory Benazzi
08/02/2023
Special inspection requirement — Energy Code Compliance Inspections
Terence Hudson
08/02/2023
Special inspection requirement — Final
Terence Hudson
08/02/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Terence Hudson
08/02/2023
Special inspection requirement — Masonry
Terence Hudson
07/26/2023
Violation issued (HPD, closed)
C
07/25/2023
Violation issued (HPD, closed)
C
07/25/2023
Violation issued (HPD, closed)
C
07/25/2023
Violation issued (HPD, closed)
B
05/02/2023
Signed off — Alteration
Subsequent filing for additional sprinkler heads
Q00694395-I1
04/13/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
OSAM GAYED
04/12/2023
Special inspection requirement — Interior lighting power
OSAM GAYED
04/12/2023
Special inspection requirement — Lighting controls
OSAM GAYED
04/12/2023
Special inspection requirement — Energy Code Compliance Inspections
OSAM GAYED
04/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
OSAM GAYED
04/06/2023
Filed — Alteration
Subsequent filing for additional sprinkler heads
Q00694395-P6
04/06/2023
Special inspection requirement — Energy Code Compliance Inspections
OSAM GAYED
04/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
OSAM GAYED
04/06/2023
Special inspection requirement — Fire-Resistance Rated Construction
OSAM GAYED
04/06/2023
Special inspection requirement — Interior lighting power
OSAM GAYED
04/06/2023
Special inspection requirement — Lighting controls
OSAM GAYED
04/05/2023
Signed off — Alteration
Subsequent filing for additional sprinkler heads
Q00694395-S1
04/05/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
OSAM GAYED
04/01/2023
Special inspection requirement — Sprinkler Systems
Michael Kokoszka
03/29/2023
Violation issued (ECB, closed)
Construction
03/06/2023
Filed — Alteration
Subsequent filing for additional sprinkler heads
Q00694395-P5
03/06/2023
Filed — Alteration
Subsequent filing for additional sprinkler heads
Q00694395-P4
03/06/2023
Special inspection requirement — Sprinkler Systems
Michael Kokoszka
03/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
OSAM GAYED
12/23/2022
Special inspection requirement — Lighting controls
OSAM GAYED
12/23/2022
Special inspection requirement — Interior lighting power
OSAM GAYED
12/23/2022
Special inspection requirement — Fire-Resistance Rated Construction
OSAM GAYED
12/23/2022
Special inspection requirement — Energy Code Compliance Inspections
OSAM GAYED
12/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
OSAM GAYED
12/21/2022
Violation issued (HPD, closed)
A
12/21/2022
Violation issued (HPD, closed)
A
12/21/2022
Violation issued (HPD, closed)
B
09/23/2022
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
09/19/2022
Objection resolved — Addressed
09/09/2022
Objection resolved — Addressed
09/09/2022
Objection resolved — Addressed
09/01/2022
Objection raised — Structural
09/01/2022
Objection raised — Scope
09/01/2022
Objection raised — Scope
08/30/2022
Filed — Alteration
Subsequent filing for additional sprinkler heads
Q00694395-P3
08/25/2022
Special inspection requirement — Sprinkler Systems
08/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
OSAM GAYED
08/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/03/2022
Objection raised — Zoning
08/03/2022
Objection resolved — Addressed
07/29/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/15/2022
Objection raised — Structural
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offAL-ARSH CONSTRUCTION CORP01/25/2024
DOB NOWGeneral ConstructionSigned-offAL-ARSH CONSTRUCTION CORP08/23/2023
DOB NOWGeneral ConstructionSigned-offARON CONSTRUCTION INC06/13/2022
DOB NOWPlumbingSigned-offEXPRESS PLBG SWR & WTR MA05/19/2022
DOB NOWGeneral ConstructionSigned-offARON CONSTRUCTION INC05/04/2022
BISMHISSUEDAIR IDEAL, INC.10/20/1994
1 project · most recent 04/06/2023
FiledStatusContractorScope
04/06/2023———
1 project · most recent 04/06/2023
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
04/06/2023Signed-offEXPRESS PL SWR & WTR AGas, Plumbing-Sprinkler, Water/Sanitary
11 projects · most recent 07/31/2026
General Wiring
FiledStatusContractorScope
07/31/2026Permit IssuedKAYLEE ELECTRIC CORPGeneral Wiring
11/14/2023CompleteLUNA NYC ELECTRIC CORPGeneral Wiring
03/02/2022Permit IssuedA J IANNI ELECL CONTS INCGeneral Wiring
11/24/2021CompleteLUNA NYC ELECTRIC CORPGeneral Wiring
08/22/2021Permit IssuedVLASHAVA ELEC CONTR'G CORGeneral Wiring
01/19/2021Permit IssuedA J IANNI ELECL CONTS INCGeneral Wiring
11/13/2019Permit IssuedA J IANNI ELECL CONTS INCGeneral Wiring
10/07/2019CompleteVLASHAVA ELEC CONTR'G COR—
10/07/2019CompleteVLASHAVA ELEC CONTR'G COR—
08/07/2019CompleteVLASHAVA ELEC CONTR'G COR—
07/08/2019CompleteA J IANNI ELECL CONTS INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/13/2023Pass-Final General Construction Non-Directive 14PassView ↗
04/05/2023Fail-Final General Construction Non-Directive 14FailView ↗
09/23/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
08/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/27/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
08/02/2023Tenant Protection Plan ComplianceGregory Benazzispecial
08/02/2023Energy Code Compliance InspectionsTerence Hudsonprogress
08/02/2023FinalTerence Hudsonprogress
08/02/2023Structural Stability – Alterations of existing buildingsTerence Hudsonspecial
08/02/2023MasonryTerence Hudsonspecial
04/12/2023Fire-Resistant Penetrations and JointsOSAM GAYEDspecial
04/12/2023Interior lighting powerOSAM GAYEDenergy_progress
04/12/2023Lighting controlsOSAM GAYEDenergy_progress
04/12/2023Energy Code Compliance InspectionsOSAM GAYEDprogress
04/12/2023Fire-Resistance Rated ConstructionOSAM GAYEDprogress
04/06/2023Energy Code Compliance InspectionsOSAM GAYEDprogress
04/06/2023Fire-Resistant Penetrations and JointsOSAM GAYEDspecial
04/06/2023Fire-Resistance Rated ConstructionOSAM GAYEDprogress
04/06/2023Interior lighting powerOSAM GAYEDenergy_progress
04/06/2023Lighting controlsOSAM GAYEDenergy_progress
04/01/2023Fire-Resistant Penetrations and JointsOSAM GAYEDspecial
04/01/2023Sprinkler SystemsMichael Kokoszkaspecial
03/06/2023Sprinkler SystemsMichael Kokoszkaspecial
03/06/2023Fire-Resistant Penetrations and JointsOSAM GAYEDspecial
12/23/2022Lighting controlsOSAM GAYEDenergy_progress
12/23/2022Interior lighting powerOSAM GAYEDenergy_progress
12/23/2022Fire-Resistance Rated ConstructionOSAM GAYEDprogress
12/23/2022Energy Code Compliance InspectionsOSAM GAYEDprogress
12/23/2022Fire-Resistant Penetrations and JointsOSAM GAYEDspecial
08/25/2022Sprinkler Systems—special
Latest 25 of 32.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/25/2026Q00694395-P6Request digital key ↗
08/25/2026Q00694395-P5Request digital key ↗
08/25/2026Q00694395-P4Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature17
08/31/2026Q00694395-P1Open ↗
08/31/2026Q00694395-P1Open ↗
08/31/2026Q00694395-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/27/2026Q00694395-P3Open ↗
08/31/2026Q00694395-P1Open ↗
08/29/2026Q00694395-P6Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/25/2026Q00694395-S1Open ↗
08/25/2026Q00694395-P4Open ↗
08/25/2026Q00694395-P3Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/25/2026Q00694395-P4Open ↗
08/25/2026Q00694395-P3Open ↗
08/25/2026Q00694395-P2Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00694395-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWHydrant Flow Test Letter1
08/25/2026Q00694395-P3Open ↗
▸Other Documents1
▸DOB NOWHydraulic Calculations1
08/13/2026Q00694395-P3Open ↗