← Back
One story - permanent living quarter
9 RUSSELL STREET
STATEN ISLAND · BIN 5067541
💬 Discuss this project
1910Year Built
1.75Stories
A2Building Class
R3AZoning
1,099 sfGross Floor Area
1Units
One story - permanent living quarter · Owner of record: ALBUS DUMBLEDORE LLC · 2,260 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Cellar1p · 1 filing · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC308/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WINWAY DEVELOPMENT LLCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YANG ENGINEERING LLC8376308/11/2025
Building Lifecycle
All (25)Filed (3)Permit Issued (1)Signed Off (1)Inspection (3)Objection (8)Special Inspection (9)
09/23/2025
Signed off — Alteration
PROPOSED INTERIOR RENOVATION AT CELLAR, 1ST TO 2ND FLOOR AND CEILING, FLOORING, PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01183425-I1
09/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
09/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jian Yang
09/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
09/03/2025
Special inspection requirement — Maintenance information
Jian Yang
09/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
09/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
09/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
09/03/2025
Special inspection requirement — Interior lighting power
Jian Yang
08/26/2025
Objection resolved — Addressed
08/21/2025
Objection raised — Scope
08/11/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION AT CELLAR, 1ST TO 2ND FLOOR AND CEILING, FLOORING, PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01183425-P1
03/27/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/20/2025
Permit issued — General Construction
S01183425-I1-GC
03/14/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/13/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION AT CELLAR, 1ST TO 2ND FLOOR AND CEILING, FLOORING, PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01183425-S1
03/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
03/10/2025
Objection resolved — Addressed
03/10/2025
Objection resolved — Addressed
03/10/2025
Objection resolved — Addressed
02/26/2025
Objection raised — Scope
02/26/2025
Objection raised — Zoning
02/26/2025
Objection raised — Admin
02/20/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION AT CELLAR, 1ST TO 2ND FLOOR AND CEILING, FLOORING, PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01183425-I1
02/07/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWINWAY DEVELOPMENT LLC03/20/2025
1 project · most recent 08/11/2025
Gas Water/Sanitary
FiledStatusContractorScope
08/11/2025——Gas, Water/Sanitary
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/27/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/14/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/07/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
09/03/2025Fire-Resistant Penetrations and JointsJian Yangspecial
09/03/2025Fire-Resistance Rated ConstructionJian Yangprogress
09/03/2025Energy Code Compliance InspectionsJian Yangprogress
09/03/2025Maintenance informationJian Yangenergy_progress
09/03/2025HVAC-R and service water heating system controlsJian Yangenergy_progress
09/03/2025HVAC-R and service water piping design and insulationJian Yangenergy_progress
09/03/2025HVAC-R and service water heating equipmentJian Yangenergy_progress
09/03/2025Interior lighting powerJian Yangenergy_progress
03/13/2025Fire-Resistant Penetrations and JointsJian Yangspecial
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026S01183425-S1Request digital key ↗
08/20/2026S01183425-I1Request digital key ↗
08/20/2026S01183425-P1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026S01183425-S1Open ↗
08/20/2026S01183425-I1Open ↗
08/20/2026S01183425-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026S01183425-I1Open ↗
08/28/2026S01183425-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026S01183425-I1Open ↗
08/23/2026S01183425-S1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026S01183425-S1Open ↗
08/20/2026S01183425-I1Open ↗
08/20/2026S01183425-P1Open ↗