| M01237700 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 07/31/2025 | 07/21/2026 | — | Removal of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy. |
| M01237704 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 07/31/2025 | 07/21/2026 | Design MG ENGINEERING D.P.C. Owner 5 PENN PLAZA, LLC | Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy. |
| M01237670 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 08/22/2025 | 07/20/2026 | Design HLW INTERNATIONAL Owner 5 PENN PLAZA, LLC | Removal of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy. |
| M01237675 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 07/31/2025 | 07/16/2026 | Design MG ENGINEERING D.P.C. Owner 5 PENN PLAZA, LLC | Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy. |
| M01385235 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 05/07/2026 | 06/02/2026 | Design MG ENGINEERING D.P.C. Owner 5 PENN PLAZA, LLC | Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy. |
| M01385226 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 05/04/2026 | 06/01/2026 | Design GENSLER Owner 5 PENN PLAZA, LLC | DEMOLITION AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Name | Projects together | Most recent |
|---|---|---|
| AKF ENGINEERS, LLP | 13 | 02/03/2025 |
| MG ENGINEERING D.P.C. | 9 | 06/18/2026 |
| TPG ARCHITECTURE, LLP | 8 | 05/28/2026 |
| SPENCER ENGINEERING, PC | 6 | 11/20/2023 |
| HLW INTERNATIONAL | 5 | 06/29/2026 |
| THORNTON TOMASETTI | 4 | 08/27/2024 |
| GENSLER | 3 | 05/04/2026 |
| DPM ARCHITECTURE, P.C. | 2 | 10/21/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| 5 PENN PLAZA, LLC | 44 | 06/29/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| RIZZO GROUP | 26 | 01/21/2025 |
| A1 EXPEDITING SERVICE CORP. | 17 | 06/29/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01237700 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 07/31/2025 | 07/21/2026 | — | Removal of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy. |
| M01237704 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 07/31/2025 | 07/21/2026 | Design MG ENGINEERING D.P.C. Owner 5 PENN PLAZA, LLC | Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy. |
| M01237670 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 08/22/2025 | 07/20/2026 | Design HLW INTERNATIONAL Owner 5 PENN PLAZA, LLC | Removal of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy. |
| M01237675 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 07/31/2025 | 07/16/2026 | Design MG ENGINEERING D.P.C. Owner 5 PENN PLAZA, LLC | Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy. |
| M01385235 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 05/07/2026 | 06/02/2026 | Design MG ENGINEERING D.P.C. Owner 5 PENN PLAZA, LLC | Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy. |
| M01385226 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 05/04/2026 | 06/01/2026 | Design GENSLER Owner 5 PENN PLAZA, LLC | DEMOLITION AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01223480 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 07/31/2025 | 01/15/2026 | Design TPG ARCHITECTURE, LLP Owner 5 PENN PLAZA, LLC | Removal of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy. |
| M01223512 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 08/05/2025 | 01/15/2026 | Design MG ENGINEERING D.P.C. | Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy. |
| M01289451 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 01/08/2026 | 01/14/2026 | Design TPG ARCHITECTURE, LLP Owner 5 PENN PLAZA, LLC | Installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy. |
| M01237626 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 09/04/2025 | 01/12/2026 | Design HLW INTERNATIONAL Owner 5 PENN PLAZA, LLC | Removal of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy. |
| M01237635 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 07/31/2025 | 01/09/2026 | Design MG ENGINEERING D.P.C. Owner 5 PENN PLAZA, LLC | Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy. |
| M01240467 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 09/17/2025 | 10/02/2025 | Design MG ENGINEERING D.P.C. Owner 5 PENN PLAZA, LLC | Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy. |
| M01240455 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 09/11/2025 | 09/30/2025 | Design HLW INTERNATIONAL Owner 5 PENN PLAZA, LLC | Renovation of the existing cafe, including removal of interior non-bearing partitions and related finishes as shown on plans filed herewith.… |
| M01223556 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 06/25/2025 | 08/08/2025 | Design HLW INTERNATIONAL Owner 5 PENN PLAZA, LLC | Removal of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy. |
| M01223567 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 06/25/2025 | 08/08/2025 | Design MG ENGINEERING D.P.C. Owner 5 PENN PLAZA, LLC | Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy. |
| M01205940 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 04/29/2025 | 05/06/2025 | Design HLW INTERNATIONAL Owner 5 PENN PLAZA, LLC | Installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy. |
| M01205956 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 04/29/2025 | 04/30/2025 | Design MG ENGINEERING D.P.C. Owner 5 PENN PLAZA, LLC | Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy. |
| M01196731 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 04/22/2025 | 04/23/2025 | Design TPG ARCHITECTURE, LLP Owner 5 PENN PLAZA, LLC | Installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy. |
| M01196872 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 04/17/2025 | 04/18/2025 | Design MG ENGINEERING D.P.C. Owner 5 PENN PLAZA, LLC | Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy. |
| M01161927 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 02/03/2025 | 02/05/2025 | Design AKF ENGINEERS, LLP | Mechanical modification, ductwork, new distribution, mis. exhaust fans on the 15th floor (RAILWORKS & ALTUS) as per plans No changes to egr… |
| M01161907 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 02/03/2025 | 02/04/2025 | Design TPG ARCHITECTURE, LLP | Installation work to include drywall, ceilings, glass partitions, flooring, HM, flooring and general finishes on the 15th floor Buildout (… |
| M01145133 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 12/03/2024 | 01/28/2025 | Design TPG ARCHITECTURE, LLP Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Partial demolition, removal of exterior walls, doors, partitions, hung ceiligns on the 15th floor (LL work) as per plans filed herewith. N… |
| M01145151 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 12/02/2024 | 01/28/2025 | Design AKF ENGINEERS, LLP Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Demolition of mechanical system, existing ductwork, existing exhaust on the 15th floor as per plans filed herewith. No change to egress, us… |
| M01151361 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 01/22/2025 | 01/28/2025 | Design TPG ARCHITECTURE, LLP | Installation work to include drywall, ceilings, glass partitions, flooring, HM, flooring and general finishes on the 6th floor (North side… |
| M01151423 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 01/21/2025 | 01/22/2025 | Design AKF ENGINEERS, LLP Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Mechanical modification, ductwork, new distribution, mis. exhaust fans on the 6th floor (northside) as per plans No changes to egress, use … |
| M01132116 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 11/08/2024 | 11/13/2024 | Design AKF ENGINEERS, LLP Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | disconnects, demo ductwork, air outlets as per plans. no change to egress use or occupancy, |
| M01132027 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 11/08/2024 | 11/12/2024 | Design TPG ARCHITECTURE, LLP Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | minor demolition of partitions, walls, ceilings, flooring, millwork, h.m. No change to egress use or occupancy, |
| M01095718 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 08/27/2024 | 10/24/2024 | Design THORNTON TOMASETTI Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Structural Modifications: Install Structural Steel for Terrace Gates on the roof as per plans (Terrace Gates.) No change to use, egress or o… |
| M00951943 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 11/21/2023 | 10/03/2024 | Design AKF ENGINEERS, LLP Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Modifications to the existing HVAC System on the 13th Floor (CO)/ 15th Floor (Mktg) as per plans (Demo.) No change to use, egress or occupan… |
| 123736939BIS | 461 8 AVENUE MANHATTAN | — | ISSUED | 05/07/2019 | 10/03/2024 | — | MH, OT |
| M01014378 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 03/14/2024 | 03/22/2024 | Design TPG ARCHITECTURE, LLP Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 9th Floor as per plans (Prebuilt/ Dewberry.… |
| M01015328 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 03/18/2024 | 03/22/2024 | Design AKF ENGINEERS, LLP Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Modifications to the existing HVAC System: Miscellaneous relocates, Install new ductwork distribution, Exhaust Fans and install new 2-ton su… |
| M01014438 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 03/18/2024 | 03/20/2024 | Design THORNTON TOMASETTI Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Structural Modifications: Install Drop Support Steel Header for Modernfold Partition on the 9th Floor as per plans (Prebuilt - Dewberry.) No… |
| M00952064 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 11/20/2023 | 11/29/2023 | Design SPENCER ENGINEERING, PC Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Minor interior demolition: Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 13th Floor (CO)/ 15th Flo… |
| M00927453 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Permit Issued | 09/22/2023 | 10/26/2023 | Design SPENCER ENGINEERING, PC Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Minor interior demolition: Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 9th Floor as per plans (N… |
| M00564574 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 09/03/2021 | 10/18/2023 | Design AKF ENGINEERS, LLP Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Modifications to the existing HVAC System; New duct work distribution, VAV's, diffusers and balancing as per plans (LL Work - Buildout.) No … |
| M00563809 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 09/03/2021 | 10/16/2023 | Design DPM ARCHITECTURE, P.C. | Installation of new drywall partitions, suspended ceilings, flooring, doors, glass and finishes as per plans (Buildout.) No change to use, e… |
| M00926816 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 09/18/2023 | 09/26/2023 | Design AKF ENGINEERS, LLP | Modifications to the existing HVAC system: Removal of tenant AC units and associated ductwork, controls, hangers, supports and piping on the… |
| M00509030 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 05/17/2021 | 08/11/2023 | Design SPENCER ENGINEERING, PC Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Minor interior demolition. Removal and disposal of interior partitions, doors, suspended ceilings, lighting, flooring and finishes as per pl… |
| M00747237 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 07/07/2022 | 01/13/2023 | Design GENSLER Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, lighting fixtures, drywall, columns, glass, c… |
| M00509025 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 05/17/2021 | 01/05/2023 | Design SPENCER ENGINEERING, PC Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Minor interior demolition. Removal & disposal of interior partitions, doors, ceilings, lighting fixtures and flooring on the 3rd Floor as pe… |
| M00584682 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 10/21/2021 | 01/05/2023 | Design DPM ARCHITECTURE, P.C. Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Installation of new interior partitions, suspended ceilings, doors/bucks, hardware, flooring and finishes on the 3rd Floor as per plans (LL … |
| M00652388 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 01/07/2022 | 01/05/2023 | Design SPENCER ENGINEERING, PC Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Minor interior demolition. Removal of interior walls, doors/bucks, suspended ceilings, flooring, glass partitions and finishes as per plans … |
| M00678029 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 02/23/2022 | 01/05/2023 | Design AKF ENGINEERS, LLP Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | HVAC removals on the 24th floor as per plans. No change to use, egress or occupancy. |
| M08002899 ↗ | 2473 BROADWAY MANHATTAN | Alteration | Signed-off | 09/19/2022 | 01/05/2023 | Design THORNTON TOMASETTI Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Structural Modifications: Remove face brick to exposed steel, patch brick at new steel and replace Window Lintels on the 2nd Floor as per pl… |
| M08012876 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 10/23/2022 | 01/05/2023 | Design THORNTON TOMASETTI Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Repair of exterior walls involving sealant, localized brick removal/replacement, pointing, steel lintel removal, replacement and/or repair, … |
| M00677975 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 02/24/2022 | 09/28/2022 | Design SPENCER ENGINEERING, PC Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Removal and disposal of interior partitions, doors, suspended ceilings and finishes on the 24th floor as per plans. No change to use, egres… |
| M00749065 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 07/07/2022 | 09/28/2022 | Design AKF ENGINEERS, LLP Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Modifications to the existing HVAC System: installation of new ductwork and install VRF water cooled condensing units on the 2-3rd Floors as… |
| M00770931 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 08/29/2022 | 09/28/2022 | Design GENSLER Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring, millwork, glass and finishes on the… |
| M00773363 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 08/30/2022 | 09/28/2022 | Design AKF ENGINEERS, LLP Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Modifications to the existing HVAC system and redistribution of ductwork and accessories on the 22nd Floor (CO)/ 24th Floor (Mktg) as per pl… |
| M00586571 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 10/19/2021 | 11/03/2021 | Design AKF ENGINEERS, LLP Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Modifications to the existing HVAC System: Install new duct work to existing equipment and diffusers on the 3rd Floor as per plans (LL Work … |
| M00203893 ↗ | 461 8 AVENUE MANHATTAN | Alteration | Signed-off | 09/11/2019 | 10/22/2020 | Design AKF ENGINEERS, LLP Owner 5 PENN PLAZA, LLC Filer RIZZO GROUP | Filing herewith to Amend the application to show the increased work scope as per updated plans. Addition of an AC Unit and duct work as well… |
| 123891413BIS | 461 8 AVENUE MANHATTAN | — | ISSUED | 05/16/2019 | 05/16/2019 | — | MH |
| 123853936BIS | 461 8 AVENUE MANHATTAN | — | ISSUED | 04/22/2019 | 04/22/2019 | — | MH, OT |
| 123400658BIS | 461 8 AVENUE MANHATTAN | — | ISSUED | 03/06/2019 | 03/08/2019 | — | MH, OT, PL |
| 123172976BIS | 461 8 AVENUE MANHATTAN | — | ISSUED | 11/20/2017 | 01/04/2019 | — | MH, OT |
| 123486361BIS | 461 8 AVENUE MANHATTAN | — | ISSUED | 08/29/2018 | 10/10/2018 | — | MH, OT, PL |
| 123541024BIS | 461 8 AVENUE MANHATTAN | — | ISSUED | 09/28/2018 | 10/03/2018 | — | MH, OT, PL |
| 122874684BIS | 461 8 AVENUE MANHATTAN | — | ISSUED | 11/04/2016 | 09/27/2017 | — | MH, OT, PL |
| 121286205BIS | 461 8 AVENUE MANHATTAN | — | ISSUED | 07/10/2017 | 08/25/2017 | — | MH, OT, PL |
| 121284751BIS | 461 8 AVENUE MANHATTAN | — | ISSUED | 06/12/2017 | 06/12/2017 | — | OT |
| 123085874BIS | 461 8 AVENUE MANHATTAN | — | ISSUED | 05/12/2017 | 05/12/2017 | — | MH, OT |
| 122883736BIS | 461 8 AVENUE MANHATTAN | — | ISSUED | 09/30/2016 | 03/28/2017 | — | MH, OT, PL |
| 122857248BIS | 461 8 AVENUE MANHATTAN | — | ISSUED | 09/16/2016 | 09/16/2016 | — | MH |
| 122684826BIS | 461 8 AVENUE MANHATTAN | — | ISSUED | 02/24/2016 | 09/06/2016 | — | MH, OT, PL |
| 122801174BIS | 461 8 AVENUE MANHATTAN | — | ISSUED | 08/09/2016 | 08/29/2016 | — | OT |
| 122497930BIS | 461 8 AVENUE MANHATTAN | — | ISSUED | 10/29/2015 | 05/20/2016 | — | EQ, MH, OT, PL |
| 122663947BIS | 461 8 AVENUE MANHATTAN | — | ISSUED | 02/09/2016 | 02/29/2016 | — | MH, OT, PL |
| 122657302BIS | 461 8 AVENUE MANHATTAN | — | ISSUED | 01/22/2016 | 01/22/2016 | — | MH, OT |
| 122639564BIS | 461 8 AVENUE MANHATTAN | — | ISSUED | 01/15/2016 | 01/15/2016 | — | MH, OT |
| Building | Filings | Most Recent |
|---|---|---|
| 461 8 AVENUE ↗ | 145 | 08/26/2026 |
| 2473 BROADWAY ↗ | 3 | 07/08/2026 |