| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01411344 ↗ | 35 WEST 28 STREET MANHATTAN | Alteration | Permit Issued | 06/10/2026 | 06/25/2026 | Design BAZINI ENGINEERING, P.C. | REPLACE ONE (1) GAS-FIRED DIRECT VENT BOILER WITH TWO (2) GAS-FIRED DIRECT VENT BOILERS AS PER PLANS. THIS APPLICATION IS BEING FILED FOR ON… |
| M01208787 ↗ | 371 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 07/15/2025 | 10/16/2025 | Design BLANCO DESIGN, INC Owner Church of St. Joseph | Miscellaneous repairs at floor of boiler room, door replacement and replacement of a window for a louver to allow fresh air intake to the bo… |
| M01109662 ↗ | 44 EAST 64 STREET MANHATTAN | Alteration | Signed-off | 10/29/2024 | 11/07/2024 | Design BAZINI ENGINEERING, P.C. | REPLACE ONE (1) 15-TON ROOFTOP PACKAGE HVAC UNIT WITH ELECTRIC HEAT SUPPORTED ON EXISTING STEEL DUNNAGE PER PLANS. RE-CONNECT EXISTING DUCTW… |
| M01115641 ↗ | 437 MANHATTAN AVENUE MANHATTAN | Alteration | Permit Issued | 10/22/2024 | 10/29/2024 | Design BAZINI ENGINEERING, P.C. | REPLACE BOILER AND OIL BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01109752 ↗ | 46 EAST 64 STREET MANHATTAN | Alteration | Signed-off | 10/03/2024 | 10/08/2024 | Design BAZINI ENGINEERING, P.C. | REPLACE ONE (1) 4-TON ROOFTOP PACKAGE HVAC UNIT WITH ELECTRIC HEAT SUPPORTED ON EXISTING STEEL DUNNAGE PER PLANS. RE-CONNECT EXISTING DUCTWO… |
| X01058516 ↗ | 2169 BLACKROCK AVENUE BRONX | Alteration | Signed-off | 07/09/2024 | 08/28/2024 | Design OLA CONSULTING ENGINEERS, PC | DEMOLITION OF EXISTING BOILER ACCESSORIES, PIPING, WIRING, ETC. DEMOLITION OF EXISTING GREASE DUCTWORK AND KITCHEN EXHAUST FAN. INSTALLATIO… |
| Name | Projects together | Most recent |
|---|---|---|
| BAZINI ENGINEERING, P.C. | 8 | 06/10/2026 |
| OLA CONSULTING ENGINEERS, PC | 2 | 07/09/2024 |
| BAOBAB ARCHITECTS P.C. | 1 | 04/12/2023 |
| BLANCO DESIGN, INC | 1 | 07/15/2025 |
| NEW YORK ENGINEERING ASSOC., P.C. | 1 | 05/20/2023 |
| VINCENT J. LIOTTA P.E. | 1 | 07/15/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| ALAFOGIANNIS PLBG & HTG | 1 | 06/10/2026 |
| RB HTG CONSULTING GROUP | 1 | 10/22/2024 |
| RVM PLUMBING CORP | 1 | 05/24/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| ALICE CUTLER RESIDENCE TRUST | 2 | 12/06/2022 |
| Josiah Macy Jr. Foundation | 2 | 02/27/2025 |
| CATHOLIC CHARITIES DIOCESE OF BROOK | 1 | 11/03/2023 |
| Church of St. Joseph | 1 | 07/15/2025 |
| EQUITY MANAGEMENT | 1 | 10/22/2024 |
| HSC MANAGEMENT CORP. | 1 | 05/24/2024 |
| NORTHWELL HEALTH | 1 | 08/30/2023 |
| STANTON GRAND HOLDING CORP | 1 | 04/12/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| MUNICIPAL BUILDING CONSULTANTS | 2 | 07/09/2024 |
| VINCENT J. LIOTTA P.E. | 1 | 07/15/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01411344 ↗ | 35 WEST 28 STREET MANHATTAN | Alteration | Permit Issued | 06/10/2026 | 06/25/2026 | Design BAZINI ENGINEERING, P.C. | REPLACE ONE (1) GAS-FIRED DIRECT VENT BOILER WITH TWO (2) GAS-FIRED DIRECT VENT BOILERS AS PER PLANS. THIS APPLICATION IS BEING FILED FOR ON… |
| M01208787 ↗ | 371 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 07/15/2025 | 10/16/2025 | Design BLANCO DESIGN, INC Owner Church of St. Joseph | Miscellaneous repairs at floor of boiler room, door replacement and replacement of a window for a louver to allow fresh air intake to the bo… |
| M01109662 ↗ | 44 EAST 64 STREET MANHATTAN | Alteration | Signed-off | 10/29/2024 | 11/07/2024 | Design BAZINI ENGINEERING, P.C. | REPLACE ONE (1) 15-TON ROOFTOP PACKAGE HVAC UNIT WITH ELECTRIC HEAT SUPPORTED ON EXISTING STEEL DUNNAGE PER PLANS. RE-CONNECT EXISTING DUCTW… |
| M01115641 ↗ | 437 MANHATTAN AVENUE MANHATTAN | Alteration | Permit Issued | 10/22/2024 | 10/29/2024 | Design BAZINI ENGINEERING, P.C. | REPLACE BOILER AND OIL BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01109752 ↗ | 46 EAST 64 STREET MANHATTAN | Alteration | Signed-off | 10/03/2024 | 10/08/2024 | Design BAZINI ENGINEERING, P.C. | REPLACE ONE (1) 4-TON ROOFTOP PACKAGE HVAC UNIT WITH ELECTRIC HEAT SUPPORTED ON EXISTING STEEL DUNNAGE PER PLANS. RE-CONNECT EXISTING DUCTWO… |
| X01058516 ↗ | 2169 BLACKROCK AVENUE BRONX | Alteration | Signed-off | 07/09/2024 | 08/28/2024 | Design OLA CONSULTING ENGINEERS, PC | DEMOLITION OF EXISTING BOILER ACCESSORIES, PIPING, WIRING, ETC. DEMOLITION OF EXISTING GREASE DUCTWORK AND KITCHEN EXHAUST FAN. INSTALLATIO… |
| X01058396 ↗ | 760 EAST GUN HILL ROAD BRONX | Alteration | Signed-off | 07/09/2024 | 07/18/2024 | Design OLA CONSULTING ENGINEERS, PC | INSTALLATION OF NEW BOILER, BURNERS, AND ASSOCIATED ACCESSORIES . INSTALLATION OF NEW HEAT EXCHANGER.. DEMOLITION OF NEW UNIT VENTILATORS |
| Q00930375 ↗ | 155-55 CROSS BAY BOULEVARD QUEENS | Alteration | Signed-off | 11/03/2023 | 11/13/2023 | Design BAZINI ENGINEERING, P.C. | REMOVE EXISTING COOLING TOWER. REMOVE STEEL DUNNAGE AND ALL ASSOCIATED PIPING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00937298 ↗ | 274 EAST 7 STREET MANHATTAN | Alteration | Signed-off | 10/02/2023 | 10/20/2023 | Design BAZINI ENGINEERING, P.C. Owner HSC MANAGEMENT CORP | REPLACE TWO (2) GAS-FIRED DIRECT VENT BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| X00854900 ↗ | 2640 EAST 177 STREET BRONX | Alteration | Signed-off | 05/20/2023 | 06/02/2023 | REFILING CONSTRUCTION OF A FUEL OIL TANK ROOM ON 1ST FLOOR. | |
| M00518415 ↗ | 215 WEST 90 STREET MANHATTAN | Alteration | Signed-off | 07/15/2021 | 01/26/2023 | Design VINCENT J. LIOTTA P.E. Filer VINCENT J. LIOTTA P.E. | REAPLCEMENTOF TWO UNITS ON THE SECOND FLOOR WITH TOTAL CAPACITY 10 TON. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. |
| M08008045 ↗ | 215 WEST 90 STREET MANHATTAN | Alteration | Signed-off | 12/06/2022 | 01/26/2023 | Design BAZINI ENGINEERING, P.C. | REFILING APPLICATION NUMBER 121704904 FOR RENOVATION OF PENTHOUSE KITCHEN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00742233 ↗ | 306 GRAND STREET BROOKLYN | Alteration | Permit Issued | 06/15/2022 | 12/23/2022 | Design BAOBAB ARCHITECTS P.C. | Installation of an HVAC system on the ground floor. |
| Q08004860 ↗ | 270-05 76 AVENUE QUEENS | Alteration | Permit Issued | 11/15/2022 | 11/21/2022 | Design BAZINI ENGINEERING, P.C. Owner NORTHWELL HEALTH | INSTALL EXHAUST VENT FOR NEW HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Building | Filings | Most Recent |
|---|---|---|
| 44 EAST 64 STREET ↗ | 1 | 07/08/2026 |
| 760 EAST GUN HILL ROAD ↗ | 1 | 07/08/2026 |
| 2640 EAST 177 STREET ↗ | 1 | 07/08/2026 |
| 437 MANHATTAN AVENUE ↗ | 1 | 07/08/2026 |
| 2169 BLACKROCK AVENUE ↗ | 1 | 07/08/2026 |
| 274 EAST 7 STREET ↗ | 1 | 07/08/2026 |
| 306 GRAND STREET ↗ | 1 | 07/08/2026 |
| 215 WEST 90 STREET ↗ | 3 | 07/08/2026 |
| 371 AVENUE OF THE AMER ↗ | 2 | 07/08/2026 |
| 35 WEST 28 STREET ↗ | 1 | 06/27/2026 |
| 155-55 CROSS BAY BOULEVARD ↗ | 2 | 03/21/2026 |
| 270-05 76 AVENUE ↗ | 2 | 03/21/2026 |
| 46 EAST 64 STREET ↗ | 2 | 03/21/2026 |