← Back
Hospital, sanitarium, mental institution
NH LIJ ZH Hospital Campus
270-05 76 AVENUE · BIN 4445327
💬 Discuss this project
1959Year Built
9Stories
I1Building Class
R3-2Zoning
2,014,617 sfGross Floor Area
1Units
LL97 Covered11 Open Violations 9 unresolved · 2 paperwork only ▸FDNY Report ↗
Hospital, sanitarium, mental institution · Owner of record: LONG ISLAND JEWISH HOSPITAL · 1,306,800 sf lot · 1.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof7p · 4 filings · 20 docs
Floor 16p · 4 filings · 20 docs
Basement14p · 5 filings · 20 docs
Sub-Basement2p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NORTHWELL HEALTH4209/13/2026
NORTH SHORE LIJ HEALTH SYSTEM1503/21/2026
THE ZUCKER HILLSIDE HOSPITAL203/21/2026
N S L I J HEALTH SYSTEMS703/21/2026
NORTH SHORE LIJ HOSPITAL SYSTEM203/21/2026
NORTH SHORE HEALTH SYSTEMS103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
UPRIGHT EXPEDITERS2003/21/2026
AE DESIGN SOLUTION1203/21/2026
EMPIRE CITY CONSULTANTS, INC.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor2807/08/2026
B & A RESTORATION CONTRAGeneral Contractor907/08/2026
THE WHITING-TURNER CONTRAGeneral Contractor507/08/2026
PLATINUM SPECIALTY SERVICGeneral Contractor507/08/2026
ALLIANCE PLUMBING CORPPlumbing407/19/2026
SIRINA FIRE PROT CORPFire Protection307/08/2026
MACCARONE PLUMBING INCPlumbing207/08/2026
ALL SYSTEMS MECHANICAL *General Contractor203/21/2026
BOTTO MECHANICAL CORPGeneral Contractor203/21/2026
CONSIGLI CONSTRUCTION COGeneral Contractor207/22/2026
ASPESI, MARCELOElectrical103/21/2026
KRAMER, PElectrical103/21/2026
CARDOZA PLUMBING CORPPlumbing107/04/2026
ABM HEATING LLCElectrical103/21/2026
JEFFREY M. BROWN ASSOCIATElectrical103/21/2026
IRON WORKERS LOCAL 40Electrical103/21/2026
E-J ELEC. INSTALLATION COElectrical103/22/2026
ALAFOGIANNIS PLBG & HTGPlumbing107/08/2026
RUSS FLAUMElectrical103/21/2026
STEPHEN KOPECElectrical103/21/2026
MICHAEL MEDNICKElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CC@A ENGINEERING P.C18541105/27/2026
BAZINI ENGINEERING, P.C.1808208/30/2023
BIG APPLE GROUP NY A RMA9168103/14/2023
Building Lifecycle
All (221)Filed (30)Permit Issued (41)Signed Off (15)Violation (60)Inspection (17)Objection (28)Special Inspection (30)
08/13/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/31/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/21/2026
Permit issued — General Construction
Q01376478-I1-GC
07/17/2026
Permit issued — Plumbing
Q01376499-I1-PL
07/14/2026
Signed off — Alteration
Filing herewith plumbing on existing ground floor and 1st floor space. No change in use, egress or occupancy.
Q00837479-I1
06/22/2026
Filed — Alteration
Q01376499-P2
06/16/2026
Filed — Alteration
Q01376499-P1
05/27/2026
Filed — Alteration
Filing herewith plumbing on existing ground floor and 1st floor space. No change in use, egress or occupancy.
Q00837479-P1
04/28/2026
Permit issued — General Construction
Q01376412-I1-GC
04/09/2026
Filed — Alteration
Northwell LIJ Kaufman: civil site make-ready scope in OSP for existing courtyard renovations, as per plans filed herewith.
Q01376478-I1
04/09/2026
Filed — Alteration
Q01376499-I1
04/02/2026
Filed — Alteration
Q01376412-I1
03/24/2026
Special inspection requirement — Final
CHAROULIS CHARALAMBOUS
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHAROULIS CHARALAMBOUS
02/17/2026
Signed off — Alteration
Filing herewith new interior partitions, new doors, finishes and lighting in existing ground floor and first floor space. No change in use, egress or occupancy.
Q00837235-I1
02/17/2026
Signed off — Alteration
Filing herewith mechanical work on existing Ground floor and 1st floor space. No change in use egress or occupancy.
Q00837427-I1
12/10/2025
Permit issued — Plumbing
Q00837479-I1-PL
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/07/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/15/2025
Signed off — Alteration
Northwell LIJ Medical Center Zucker Campus - Kaufman IP Project: Civil plumbing scope in conjunction with project, as per plans filed herewith.
Q01053322-I1
09/10/2025
Signed off — Alteration
Northwell LIJ Medical Center - Zucker Hillside Campus: Kaufman IP Project: minor structural scope in conjunction with project as per plans filed herewith.
Q01055072-I1
08/29/2025
Signed off — Alteration
Northwell LIJ Sloman Bldg: partial roof repair/replacement, including parapet, as per plans filed herewith.
Q00909064-I1
08/25/2025
Signed off — Alteration
Northwell LIJ Medical Center Zucker Hillside Campus - Kaufman IP Project: modify plumbing and sprinkler systems to conform with new layouts as per plans filed herewith.
Q01052753-I1
07/16/2025
Signed off — Alteration
Northwell LIJ Medical Center Zucker Hillside Campus - Kaufman IP Project: modify Mechanical/HVAC systems to conform to new layouts as per plans filed herewith.
Q01052680-I1
06/25/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/28/2025
Signed off — Alteration
Northwell LIJ Medical Center Zucker Hillside Campus - Kaufman IP Project: rearrange interior, non-bearing partitions, install hung ceiling, wall & floor finishes as per plans filed herewith. No change to use, occupancy or egress under this application.
Q01052639-I1
05/23/2025
Signed off — Alteration
Northwell LIJ Medical Center - Zucker Hillside Campus: Kaufman IP Project: civil site work including grading, installation of handrails, and restoration of ADA ramp, as per plans filed herewith.
Q01065638-I1
05/19/2025
Filed — Alteration
Northwell LIJ Medical Center Zucker Hillside Campus - Kaufman IP Project: modify plumbing and sprinkler systems to conform with new layouts as per plans filed herewith.
Q01052753-P1
05/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHAROULIS CHARALAMBOUS
05/07/2025
Special inspection requirement — Sprinkler Systems
CHAROULIS CHARALAMBOUS
05/07/2025
Special inspection requirement — Post-installed Anchors
CHAROULIS CHARALAMBOUS
05/01/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/01/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/27/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/27/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/16/2024
Permit issued — General Construction
Q01065638-I1-GC
10/08/2024
Permit issued — Mechanical Systems
Q01052680-I1-MS
10/07/2024
Objection resolved — Addressed
10/02/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
09/27/2024
Permit issued — General Construction
Q00837235-I1-GC
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/12/2024
Objection resolved — Addressed
09/11/2024
Permit issued — Sprinklers
Q01052753-I1-PL
08/27/2024
Permit issued — Plumbing
Q01053322-I1-PL
08/26/2024
Permit issued — Sprinklers
Q01052753-I1-EW-SP
08/22/2024
Permit issued — Plumbing
Q00837479-I1-PL
08/20/2024
Permit issued — General Construction
Q00909064-I1-GC
08/07/2024
Objection resolved — Addressed
08/07/2024
Objection resolved — Addressed
08/06/2024
Objection resolved — Addressed
08/01/2024
Objection resolved — Addressed
08/01/2024
Objection resolved — Addressed
08/01/2024
Objection resolved — Addressed
Latest 60 of 221 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO07/21/2026
DOB NOWPlumbingSigned-offALLIANCE PLUMBING CORP07/17/2026
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO04/28/2026
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE12/10/2025
DOB NOWGeneral ConstructionSigned-offTHE WHITING-TURNER CONTRA10/16/2024
DOB NOWMechanical SystemsSigned-offTHE WHITING-TURNER CONTRA10/08/2024
DOB NOWGeneral ConstructionSigned-offPLATINUM SPECIALTY SERVIC09/27/2024
DOB NOWSprinklersSigned-offMACCARONE PLUMBING INC09/11/2024
DOB NOWPlumbingSigned-offMACCARONE PLUMBING INC08/27/2024
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP08/26/2024
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE08/22/2024
DOB NOWGeneral ConstructionSigned-offB & A RESTORATION CONTRA08/20/2024
DOB NOWGeneral ConstructionSigned-offTHE WHITING-TURNER CONTRA07/11/2024
DOB NOWStructuralSigned-offTHE WHITING-TURNER CONTRA07/10/2024
DOB NOWGeneral ConstructionSigned-offPLATINUM SPECIALTY SERVIC01/31/2024
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE07/28/2023
DOB NOWGeneral ConstructionSigned-offB & A RESTORATION CONTRA07/15/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedB & A RESTORATION CONTRA06/30/2023
DOB NOWGeneral ConstructionSigned-offB & A RESTORATION CONTRA06/14/2023
DOB NOWGeneral ConstructionSigned-offPLATINUM SPECIALTY SERVIC06/13/2023
DOB NOWPlumbingSigned-offCARDOZA PLUMBING CORP06/09/2023
DOB NOWMechanical SystemsSigned-offBOTTO MECHANICAL CORP06/02/2023
DOB NOWSupported ScaffoldPermit IssuedB & A RESTORATION CONTRA04/12/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC02/27/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC02/22/2023
DOB NOWMechanical SystemsPermit IssuedALL SYSTEMS MECHANICAL *11/21/2022
DOB NOWPlumbingSigned-offALAFOGIANNIS PLBG & HTG11/16/2022
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/01/2022
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC02/28/2022
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/03/2021
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/02/2021
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC04/14/2020
DOB NOWConstruction FenceSigned-offSPRING SCAFFOLDING LLC02/28/2020
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP02/26/2020
DOB NOWStandpipeSigned-offSIRINA FIRE PROT CORP02/26/2020
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC01/06/2020
DOB NOWConstruction FenceSigned-offSPRING SCAFFOLDING LLC12/16/2019
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC12/27/2018
DOB NOWConstruction FenceSigned-offSPRING SCAFFOLDING LLC12/26/2018
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC05/07/2018
+ 51 more permits on file
1 project · most recent 08/30/2023
Gas
FiledStatusContractorScope
08/30/2023Signed-offALAFOGIANNIS PLBG & HTGGas
10 projects · most recent 03/25/2026
General Wiring
FiledStatusContractorScope
03/25/2026Permit IssuedE-J ELEC. INSTALLATION COGeneral Wiring
04/24/2025Permit IssuedHATZEL AND BUEHLER, INCGeneral Wiring
03/28/2025Permit IssuedHATZEL AND BUEHLER, INC—
08/30/2024CompleteGOTHAM TECHNICAL SERVICESGeneral Wiring
08/30/2024CompleteNJS ELEC'L SERVICES CORP.General Wiring
06/15/2023CancelledE-J ELEC. INSTALLATION COGeneral Wiring
12/10/2019Permit IssuedDIANE ELECTRIC INC.General Wiring
10/24/2018CompleteTOP SHELF ELECTRIC CORP—
07/12/2018CompleteDIANE ELECTRIC INC.—
03/08/2018CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 06/30/2023
Scaffold
FiledStatusContractorScope
06/30/2023Permit IssuedB & A RESTORATION CONTRAScaffold
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
08/13/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/31/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/07/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/07/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/25/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/27/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/02/2024Pass-Final PL - UndergroundPassView ↗
04/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/15/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
03/24/2026FinalCHAROULIS CHARALAMBOUSprogress
03/03/2026Fire-Resistant Penetrations and JointsCHAROULIS CHARALAMBOUSspecial
05/07/2025Fire-Resistant Penetrations and JointsCHAROULIS CHARALAMBOUSspecial
05/07/2025Sprinkler SystemsCHAROULIS CHARALAMBOUSspecial
05/07/2025Post-installed AnchorsCHAROULIS CHARALAMBOUSspecial
06/12/2024Maintenance informationCHAROULIS CHARALAMBOUSenergy_progress
06/12/2024FinalCHAROULIS CHARALAMBOUSprogress
06/12/2024Duct leakage testing, insulation and designCHAROULIS CHARALAMBOUSenergy_progress
06/12/2024HVAC-R and service water heating system controlsCHAROULIS CHARALAMBOUSenergy_progress
06/12/2024HVAC-R and service water piping design and insulationCHAROULIS CHARALAMBOUSenergy_progress
06/12/2024HVAC-R and service water heating equipmentCHAROULIS CHARALAMBOUSenergy_progress
06/12/2024Fire-Resistant Penetrations and JointsCHAROULIS CHARALAMBOUSspecial
06/12/2024Post-installed AnchorsCHAROULIS CHARALAMBOUSspecial
06/12/2024Energy Code Compliance InspectionsCHAROULIS CHARALAMBOUSprogress
06/10/2024Concrete - Cast-In-PlaceCHAROULIS CHARALAMBOUSspecial
06/10/2024Structural Steel - WeldingCHAROULIS CHARALAMBOUSspecial
06/10/2024Structural Steel - High Strength BoltingCHAROULIS CHARALAMBOUSspecial
06/10/2024Post-installed AnchorsCHAROULIS CHARALAMBOUSspecial
05/22/2024FinalCHAROULIS CHARALAMBOUSprogress
05/16/2024Mechanical SystemsCHAROULIS CHARALAMBOUSspecial
05/16/2024FinalCHAROULIS CHARALAMBOUSprogress
09/01/2023Insulation placement and R valuesCHAROULIS CHARALAMBOUSenergy_progress
08/31/2023Maintenance informationJoseph Bazinienergy_progress
08/31/2023HVAC-R and service water piping design and insulationJoseph Bazinienergy_progress
08/31/2023Mechanical SystemsJoseph Bazinispecial
Latest 25 of 41.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Northwell HealthMedical / Healthcare—
Project Q01053322 Alteration · LOC Issued · 07/10/2024
NorthwellMedical / HealthcareBasement
Project Q01052680 Alteration · LOC Issued · 06/26/2024
Zucker Hillside HospitalMedical / HealthcareBasement
Project Q01052753 Alteration · LOC Issued · 06/19/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 579 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch27
08/29/2026Q01376499-I1Request digital key ↗
08/29/2026Q01376499-P2Request digital key ↗
08/29/2026Q01376499-P1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
08/28/2026Q00295929-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00341287-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
08/28/2026Q00295929-I1Request digital key ↗
▸Applications & Permits85
▸BISPLAN / WORK APPROVAL APPLICATION51
06/30/2020421697792Open ↗
02/06/2020421896381Open ↗
12/23/2019421697792Open ↗
Showing 3 of 51 on file for this type
▸BISWORK PERMIT APPLICATION34
09/03/2019421896381Open ↗
08/10/2019421697792Open ↗
08/03/2019421697792Open ↗
Showing 3 of 34 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISTAX LOT: FINAL LOT NUMBER ISSUED2
10/19/2015421223429Open ↗
10/19/2015421223429Open ↗
▸Seals & Professional Certifications124
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION49
03/27/2020421896381Open ↗
12/13/2019421896381Open ↗
08/28/2019421896381Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
08/29/2026Q01376499-P2Open ↗
08/29/2026Q01376499-P1Open ↗
08/29/2026Q01376499-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/01/2026Q00295929-I1Open ↗
09/01/2026Q00295929-I1Open ↗
08/31/2026Q00909064-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026Q00837235-I1Open ↗
09/01/2026Q01065638-I1Open ↗
08/31/2026Q00909064-I1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/08/2018440488198Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/08/2018440488198Open ↗
▸Trade Schedules & Equipment66
▸BISFA - FDNY APPROVAL : FD-FAA22
09/30/2020421715941Open ↗
01/07/2019421608969Open ↗
01/07/2019421608950Open ↗
Showing 3 of 22 on file for this type
▸BISSELF-CERT PLUMBING NOTICE13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
02/06/2020421896381Open ↗
12/23/2019421697792Open ↗
06/14/2019421896381Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING5
06/30/2020421697792Open ↗
Showing 1 of 5 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION4
08/03/2018421608898Open ↗
08/03/2018421608905Open ↗
08/03/2018421608898Open ↗
Showing 3 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
03/09/2018421608905Open ↗
03/09/2018421608898Open ↗
Showing 2 of 3 on file for this type
▸BISRPZ/DDCV TEST REPORT : GEN215B2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/17/2020421697792Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISWATER METER PERMIT : DEP-METER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
07/17/2020421697792Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos52
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
09/03/2019421896381Open ↗
08/03/2019421697792Open ↗
01/23/2019421608969Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
08/25/2026Q00837427-I1Open ↗
08/25/2026Q00837479-I1Open ↗
08/24/2026Q00909064-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026Q08004855-P1Open ↗
08/24/2026Q08004855-I1Open ↗
08/24/2026Q08004855-P2Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Completion Form1
08/13/2026Q01052639-I1Open ↗
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
08/03/2019421697792Open ↗
01/05/2019421697792Open ↗
12/18/2018421608905Open ↗
Showing 3 of 13 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
12/18/2018421608905Open ↗
12/18/2018421608898Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/15/2020421697792Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/15/2020421697792Open ↗
▸BISELECTRIC MOTORS1
07/17/2020421697792Open ↗
▸BISLIGHTING CONTROLS1
07/17/2020421697792Open ↗
▸BIS* HVAC INSULATION AND SEALING1
07/17/2020421697792Open ↗
▸BISINTERIOR LIGHTING POWER1
07/17/2020421697792Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/17/2020440488198Open ↗
05/26/2020421697792Open ↗
06/08/2018440488198Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPOST-INSTALLED ANCHORS1
07/15/2020421697792Open ↗
▸BISMECHANICAL SYSTEMS1
07/15/2020421697792Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
07/15/2020421697792Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
07/15/2020421697792Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs74
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter27
08/29/2026Q01376499-P2Open ↗
08/29/2026Q01376499-P1Open ↗
08/29/2026Q01376499-I1Open ↗
Showing 3 of 27 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
09/30/2020421715941Open ↗
07/17/2020421697792Open ↗
07/17/2020440488198Open ↗
Showing 3 of 23 on file for this type
▸BISADMINISTRATIVE OBJECTIONS17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
06/14/2019421896381Open ↗
04/11/2018421608905Open ↗
04/11/2018421608898Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL1
07/15/2020421697792Open ↗
▸Cost, Insurance & Ownership44
▸BISCOST AFFIDAVIT41
03/27/2020421896381Open ↗
06/14/2019421896381Open ↗
01/23/2019421608969Open ↗
Showing 3 of 41 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
09/30/2020421715941Open ↗
07/15/2020421697792Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
07/13/2016421340533Open ↗
▸Filing & Intake Forms45
▸BISEFILING COVER SHEET31
06/14/2019421896381Open ↗
01/05/2019421697792Open ↗
01/05/2019421697792Open ↗
Showing 3 of 31 on file for this type
▸BISADDITIONAL INFORMATION10
03/07/2020421896381Open ↗
12/31/2019421697792Open ↗
11/09/2018421608905Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM3
11/20/2019421697792Open ↗
11/19/2018421608898Open ↗
11/19/2018421608905Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/08/2018440488198Open ↗
▸Other Documents10
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/17/2020421697792Open ↗
07/15/2020421697792Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
06/08/2018440488198Open ↗
▸BISMAINTENANCE INFORMATION1
07/17/2020421697792Open ↗
▸BISUnknown1
11/20/2019421697792Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1