| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01191022 ↗ | 145-39 123 AVENUE QUEENS | Alteration | Signed-off | 03/11/2025 | 09/12/2025 | Design Sherif Labib | PAA opened to show in the cellar level, SD/CM, boiler room door and walls fire rate and hand rail for stair in rear yard as requested per in… |
| Q01201697 ↗ | 123-06 95 AVENUE QUEENS | Alteration | Signed-off | 04/04/2025 | 05/07/2025 | Design Sherif Labib | legalize the existing metal tube and fiberglass roof canopy located on front porch of the existing dwelling |
| B01172892 ↗ | 1009 EAST 37 STREET BROOKLYN | Alteration | Permit Issued | 01/29/2025 | 02/18/2025 | Owner EZFILINGNYCORP Filer EZFILINGNYCORP | INTERIOR RENOVATION- PATCH AND REPAIR AREAS OF DAMAGED GYPSUM BOARD, REPLACE DAMAGED FLUSH DOORS AT SAME LOCATIONS AND REFINISH CABINETRY. F… |
| B00936168 ↗ | 1009 EAST 37 STREET BROOKLYN | Alteration | Signed-off | 09/21/2023 | 11/08/2024 | Design MOHAMMAD AHEAD, PE Owner EZFILINGNYCORP Filer EZFILINGNYCORP | INTERIOR RENOVATION TO PATCH AND REPAIR AREAS OF DAMAGED GYPSUM BOARD, REPLACEMENT OF DAMAGED FLUSH DOORS AT SAME LOCATIONS. FILING TO RESTO… |
| Name | Projects together | Most recent |
|---|---|---|
| Sherif Labib | 2 | 12/23/2025 |
| FOCAL POINT ARCHITECTS & ASS. | 1 | 04/01/2025 |
| MOHAMMAD AHEAD, PE | 1 | 09/21/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| M & M PIPING AND HEATING | 1 | 12/23/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| EZFILINGNYCORP | 2 | 04/01/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| EZFILINGNYCORP | 2 | 04/01/2025 |
| FRANKLYN ESTRELLA ARCHITECT PLLC | 1 | 12/23/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01191022 ↗ | 145-39 123 AVENUE QUEENS | Alteration | Signed-off | 03/11/2025 | 09/12/2025 | Design Sherif Labib | PAA opened to show in the cellar level, SD/CM, boiler room door and walls fire rate and hand rail for stair in rear yard as requested per in… |
| Q01201697 ↗ | 123-06 95 AVENUE QUEENS | Alteration | Signed-off | 04/04/2025 | 05/07/2025 | Design Sherif Labib | legalize the existing metal tube and fiberglass roof canopy located on front porch of the existing dwelling |
| B01172892 ↗ | 1009 EAST 37 STREET BROOKLYN | Alteration | Permit Issued | 01/29/2025 | 02/18/2025 | Owner EZFILINGNYCORP Filer EZFILINGNYCORP | INTERIOR RENOVATION- PATCH AND REPAIR AREAS OF DAMAGED GYPSUM BOARD, REPLACE DAMAGED FLUSH DOORS AT SAME LOCATIONS AND REFINISH CABINETRY. F… |
| B00936168 ↗ | 1009 EAST 37 STREET BROOKLYN | Alteration | Signed-off | 09/21/2023 | 11/08/2024 | Design MOHAMMAD AHEAD, PE Owner EZFILINGNYCORP Filer EZFILINGNYCORP | INTERIOR RENOVATION TO PATCH AND REPAIR AREAS OF DAMAGED GYPSUM BOARD, REPLACEMENT OF DAMAGED FLUSH DOORS AT SAME LOCATIONS. FILING TO RESTO… |
| Building | Filings | Most Recent |
|---|---|---|
| 145-39 123 AVENUE ↗ | 1 | 04/09/2026 |
| 1009 EAST 37 STREET ↗ | 4 | 04/08/2026 |
| 123-06 95 AVENUE ↗ | 3 | 03/21/2026 |