| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01412941 ↗ | 55 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/28/2026 | 08/05/2026 | Owner HARBOR GROUP MANAGEMENT Filer METROPOLIS GROUP INC | SPRINKLER SYSTEM MODIFICATION INCLUDING INSTALLATION OF NEW SPRINKLER HEADS IN THE 6TH FLOOR COMMON AREA AS PER PLANS FILED HEREWITH. NO CHA… |
| M01394634 ↗ | 55 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/15/2026 | 07/22/2026 | Owner HARBOR GROUP MANAGEMENT Filer METROPOLIS GROUP INC | SUITE 601. SPRINKLER SYSTEM MODIFICTION INCLUDING NEW SPRINKLER HEADS INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR… |
| M01393238 ↗ | 55 BROADWAY MANHATTAN | Alteration | Permit Issued | 05/29/2026 | 07/21/2026 | Owner HARBOR GROUP MANAGEMENT Filer METROPOLIS GROUP INC | SUITE 602. SPRINKLER SYSTEM MODIFICTION INCLUDING NEW SPRINKLER HEADS INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR… |
| M01392099 ↗ | 55 BROADWAY MANHATTAN | Alteration | Permit Issued | 06/02/2026 | 06/17/2026 | Owner HARBOR GROUP MANAGEMENT Filer METROPOLIS GROUP INC | SPRINKLER SYSTEM MODIFICTION INCLUDING NEW SPRINKLER HEADS INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPNCY. |
| M01319021 ↗ | 55 BROADWAY MANHATTAN | Alteration | Permit Issued | 02/18/2026 | 03/05/2026 | MECHANICAL RELATED WORK FOR THE INTERIOR FIT-OUT OF A COMMERICAL OFFICE. NO CHANGE IN OCCUPANCY OR EGRESS | |
| M00999893 ↗ | 55 BROADWAY MANHATTAN | Alteration | Signed-off | 03/01/2024 | 01/23/2026 | Owner HARBOR GROUP MANAGEMENT Filer METROPOLIS GROUP INC | MODIFY EXISTING SPRINKLER SYSTEM IN 10TH FLOOR OFFICE SPACE. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| Name | Projects together | Most recent |
|---|---|---|
| THE DEROSA GROUP, PC ARCHITECTS | 8 | 08/18/2026 |
| WB ENGINEERS & CONSULTANTS PLLC | 7 | 08/18/2026 |
| GMH ARCHITECTURE PLLC | 4 | 05/22/2023 |
| AZTEC ARCHITECTS, LLC | 3 | 11/11/2024 |
| CONCESSI ENGINEERING, P.C. | 3 | 05/24/2023 |
| LATIMER SOMMERS & ASSOC | 3 | 11/11/2024 |
| AR Figueroa Architect LLC | 1 | 04/21/2026 |
| BAI GROUP | 1 | 10/31/2025 |
| CSA GROUP NY ARCHITECTS & ENGINEERS | 1 | 02/18/2026 |
| IJKIM ARCHITECT PLLC | 1 | 02/18/2026 |
| ROGER DE ELECTRIC CO. | 1 | 03/25/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| FIREQUEST CORP | 6 | 07/31/2026 |
| DEPENDABLE MECH CORP | 3 | 06/02/2026 |
| M&D FIRE SPRINKLER INC | 3 | 08/18/2026 |
| STARLITE PLUMBING CORP | 3 | 08/18/2026 |
| IMPACT PLUMBING INC | 2 | 10/22/2024 |
| BENT MECHANICAL CORP | 1 | 06/04/2024 |
| DEPENDABLE MECHANICAL COR | 1 | 06/02/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| HARBOR GROUP MANAGEMENT | 11 | 08/18/2026 |
| 2GC OWNERS, LLC | 3 | 11/11/2024 |
| DAWNING REAL ESTATE INC | 2 | 04/03/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| METROPOLIS GROUP INC | 9 | 08/18/2026 |
| PWF | 3 | 11/11/2024 |
| CONVERSANO ASSOCIATES, INC. | 1 | 06/17/2024 |
| SALAMON ENGINEERING PLLC | 1 | 03/25/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01412941 ↗ | 55 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/28/2026 | 08/05/2026 | Owner HARBOR GROUP MANAGEMENT Filer METROPOLIS GROUP INC | SPRINKLER SYSTEM MODIFICATION INCLUDING INSTALLATION OF NEW SPRINKLER HEADS IN THE 6TH FLOOR COMMON AREA AS PER PLANS FILED HEREWITH. NO CHA… |
| M01394634 ↗ | 55 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/15/2026 | 07/22/2026 | Owner HARBOR GROUP MANAGEMENT Filer METROPOLIS GROUP INC | SUITE 601. SPRINKLER SYSTEM MODIFICTION INCLUDING NEW SPRINKLER HEADS INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR… |
| M01393238 ↗ | 55 BROADWAY MANHATTAN | Alteration | Permit Issued | 05/29/2026 | 07/21/2026 | Owner HARBOR GROUP MANAGEMENT Filer METROPOLIS GROUP INC | SUITE 602. SPRINKLER SYSTEM MODIFICTION INCLUDING NEW SPRINKLER HEADS INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR… |
| M01392099 ↗ | 55 BROADWAY MANHATTAN | Alteration | Permit Issued | 06/02/2026 | 06/17/2026 | Owner HARBOR GROUP MANAGEMENT Filer METROPOLIS GROUP INC | SPRINKLER SYSTEM MODIFICTION INCLUDING NEW SPRINKLER HEADS INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPNCY. |
| M01319021 ↗ | 55 BROADWAY MANHATTAN | Alteration | Permit Issued | 02/18/2026 | 03/05/2026 | MECHANICAL RELATED WORK FOR THE INTERIOR FIT-OUT OF A COMMERICAL OFFICE. NO CHANGE IN OCCUPANCY OR EGRESS | |
| M00999893 ↗ | 55 BROADWAY MANHATTAN | Alteration | Signed-off | 03/01/2024 | 01/23/2026 | Owner HARBOR GROUP MANAGEMENT Filer METROPOLIS GROUP INC | MODIFY EXISTING SPRINKLER SYSTEM IN 10TH FLOOR OFFICE SPACE. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M01288857 ↗ | 184 THOMPSON STREET MANHATTAN | Alteration | Signed-off | 10/31/2025 | 11/21/2025 | Design BAI GROUP | Herewith requesting to file a new storefront on the cellar level with a demising wall as per the plans. No change in use, egress or occupanc… |
| S01262164 ↗ | 215 BAY STREET STATEN ISLAND | Alteration | Signed-off | 08/05/2025 | 10/30/2025 | — | APPLICATION IS FILED FOR EXTERIOR WALL TO BE REPAIRED TO PREVIOUSLY EXISTING CONDITIONS DUE TO VEHICLE DAMAGE. ALL WORK AS PER PLANS SUBMITT… |
| 123346566BIS | 24 WEST 40 STREET MANHATTAN | — | ISSUED | 07/24/2017 | 07/18/2025 | — | OT, PL |
| M01115795 ↗ | 55 BROADWAY MANHATTAN | Alteration | Signed-off | 12/06/2024 | 03/26/2025 | Owner HARBOR GROUP MANAGEMENT Filer METROPOLIS GROUP INC | MODIFY EXISTING SPRINKLER SYSTEM IN 15TH FLOOR OFFICE SPACE. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M01120096 ↗ | 776 3 AVENUE MANHATTAN | Alteration | Signed-off | 10/07/2024 | 01/07/2025 | Design LATIMER SOMMERS & ASSOC Owner 2GC OWNERS, LLC Filer PWF | MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS ON 8TH FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| M01120106 ↗ | 776 3 AVENUE MANHATTAN | Alteration | Signed-off | 10/05/2024 | 01/07/2025 | Design AZTEC ARCHITECTS, LLC Owner 2GC OWNERS, LLC Filer PWF | MODIFICATIONS TO EXISTING PLUMBING AND SPRINKLER SYSTEMS IN 20TH FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| M01081502 ↗ | 776 3 AVENUE MANHATTAN | Alteration | Signed-off | 07/17/2024 | 10/11/2024 | Design LATIMER SOMMERS & ASSOC Owner 2GC OWNERS, LLC Filer PWF | MODIFICATIONS TO EXISTING PLUMBING AND SPRINKLER SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| M01062727 ↗ | 24 WEST 40 STREET MANHATTAN | Alteration | Signed-off | 06/17/2024 | 07/05/2024 | Owner HARBOR GROUP MANAGEMENT | ADDITION OF A NEW GLASS DOOR AND SIDELITE AT THE ELEVATOR LOBBY OF THE SPACE. THE NEW GLASS DOOR SHALL RECEIVE NEW MAGLOCK HARDWARE AS WELL … |
| M00977555 ↗ | 24 WEST 40 STREET MANHATTAN | Alteration CO | Permit Issued | 12/16/2023 | 06/12/2024 | Design AR Figueroa Architect LLC | THIS APPLICATION IS A MINOR RENOVATION TO AN EXISTING SPACE AND CHANGE OCCUPANCY GROUP ON 6TH FLR FROM OFFICES & SHOWROOM USE GROUP VII TO P… |
| M00991780 ↗ | 55 BROADWAY MANHATTAN | Alteration | Signed-off | 02/20/2024 | 02/23/2024 | Design ROGER DE ELECTRIC CO. Owner HARBOR GROUP MANAGEMENT Filer SALAMON ENGINEERING PLLC | Installation of structural support for equipment |
| M00732719 ↗ | 55 BROADWAY MANHATTAN | Alteration | Signed-off | 06/23/2022 | 09/14/2023 | Design CONCESSI ENGINEERING, P.C. Owner HARBOR GROUP MANAGEMENT Filer METROPOLIS GROUP INC | Modification of the mechanical system on the 21st FL office space. No change of use, egress or occupancy. |
| S00874888 ↗ | 600 HYLAN BOULEVARD STATEN ISLAND | Alteration | Signed-off | 05/22/2023 | 07/05/2023 | Design GMH ARCHITECTURE PLLC | Interior apartment renovation in unit #2A and #3A as per plan submitted herewith. No change in use, egress, or occupancy under this applicat… |
| M00829366 ↗ | 55 BROADWAY MANHATTAN | Alteration | Permit Issued | 05/30/2023 | 06/21/2023 | FILING FOR THE INTERIOR RENOVATION OF THE RETAIL SPACE, ASPER PLANS FILED HEREWITH. NO CHANGE TO USE,EGRESS OR OCCUPANCY | |
| S00840259 ↗ | 600 HYLAN BOULEVARD STATEN ISLAND | Alteration | Signed-off | 03/10/2023 | 06/08/2023 | Design GMH ARCHITECTURE PLLC | Interior apartment renovation in unit #6A and #7A as per plan submitted herewith. No change in use, egress, or occupancy under this applicat… |
| S00853152 ↗ | 600 HYLAN BOULEVARD STATEN ISLAND | Alteration | Signed-off | 04/03/2023 | 06/08/2023 | Design GMH ARCHITECTURE PLLC Owner DAWNING REAL ESTATE INC | Interior apartment renovation in unit #4A and #5A as per plan submitted herewith. No change in use, egress, or occupancy under this applicat… |
| S00821414 ↗ | 600 HYLAN BOULEVARD STATEN ISLAND | Alteration | Signed-off | 02/02/2023 | 05/03/2023 | Design GMH ARCHITECTURE PLLC Owner DAWNING REAL ESTATE INC | Interior apartment renovation in unit #2G to address open ECB Violation#39077230Y. No change in use, egress, or occupancy under this applica… |
| M00826975 ↗ | 55 BROADWAY MANHATTAN | Alteration | Permit Issued | 03/21/2023 | 04/25/2023 | Owner HARBOR GROUP MANAGEMENT Filer METROPOLIS GROUP INC | MODIFICATION OF DUCTWORK AND RELATED AIR DISTRIBUTION SYSTEM, ALL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| 123702591BIS | 55 BROADWAY MANHATTAN | — | ISSUED | 03/03/2020 | 11/09/2022 | — | OT |
| M00732658 ↗ | 55 BROADWAY MANHATTAN | Alteration | Signed-off | 08/23/2022 | 09/05/2022 | Design CONCESSI ENGINEERING, P.C. | Modification to the Mechanical system on the 11th FL office space. No change of use, egress or occupancy. |
| M00732985 ↗ | 55 BROADWAY MANHATTAN | Alteration | Signed-off | 08/23/2022 | 09/05/2022 | Design CONCESSI ENGINEERING, P.C. Owner HARBOR GROUP MANAGEMENT Filer METROPOLIS GROUP INC | Modification to the existing MH system on the 16th FL office space. No change in use, egress or occupancy. |
| Building | Filings | Most Recent |
|---|---|---|
| 55 BROADWAY ↗ | 28 | 08/06/2026 |
| 776 3 AVENUE ↗ | 14 | 07/08/2026 |
| 600 HYLAN BOULEVARD ↗ | 8 | 07/08/2026 |
| 184 THOMPSON STREET ↗ | 1 | 07/08/2026 |
| 215 BAY STREET ↗ | 1 | 04/09/2026 |
| 24 WEST 40 STREET ↗ | 6 | 03/21/2026 |