| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01369159 ↗ | 60 EAST 8 STREET MANHATTAN | Alteration | Signed-off | 03/25/2026 | 04/08/2026 | Design READ ARCHITECTURE DESIGN DPC | Interior renovation of existing apartment on the 18th floor Apt#18J. Architectural/construction work only. |
| M01204919 ↗ | 333 EAST 46 STREET MANHATTAN | Alteration | Signed-off | 06/30/2025 | 01/14/2026 | Design CONCESSI ENGINEERING, P.C. | ADDITION OF A NEW NON-LOAD BEARING PARTITION TO CREATE A BEDROOM IN AN EXISTING STUDIO, NEW FRENCH DOOR AND REPAIRS OF CEILINGS, AND FLOORIN… |
| S01089384 ↗ | 17 MILLS AVENUE STATEN ISLAND | Alteration | Signed-off | 08/22/2024 | 09/16/2024 | Filer LEWSAN CONSULTANTS | RENOVATE ATTIC TO COMPLY WITH ECB VIOLATION 3910556X |
| M01022866 ↗ | 35 WEST 92 STREET MANHATTAN | Alteration | Signed-off | 05/17/2024 | 05/23/2024 | Design RIP CONSTRUCTION CONSULTANTS | Interior partition removal and renovations as per plans no change to use egress or occupancy. |
| M00646541 ↗ | 154 WEST 15 STREET MANHATTAN | Alteration | Signed-off | 01/11/2022 | 01/10/2023 | Design CONCESSI ENGINEERING, P.C. Owner THOMPSON HOUSE GROUP LLC | WORK FILED TO LEGALIZE EXISTING THREE FIXTURE BATHROOM AND CLOSET IN CELLAR AND CORRECT VIOLATIONS 35248366L AND35248368P. NO CHANGE OF USE,… |
| M00615674 ↗ | 129 CROSBY STREET MANHATTAN | Alteration | Signed-off | 11/04/2021 | 11/26/2021 | Design CONCESSI ENGINEERING, P.C. | RE-BUILT GWB PARTITION IN EXISTING APARTMENT. NO CHANGE OF USE, EGRESS OR OCCUPANCY. |
| Name | Projects together | Most recent |
|---|---|---|
| CONCESSI ENGINEERING, P.C. | 4 | 06/30/2025 |
| ACTIVE DESIGN GROUP ENGINEERING | 1 | 12/05/2019 |
| READ ARCHITECTURE DESIGN DPC | 1 | 03/25/2026 |
| RIP CONSTRUCTION CONSULTANTS | 1 | 05/17/2024 |
| SAL V. TARTAGLIONE ARCHITECT, PC | 1 | 09/19/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| BKNY PLUMBING & HEATING I | 1 | 09/19/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| THOMPSON HOUSE GROUP LLC | 1 | 01/11/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| MP DESIGN AND CONSTRUCTION | 2 | 06/30/2025 |
| LEWSAN CONSULTANTS | 1 | 09/19/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01369159 ↗ | 60 EAST 8 STREET MANHATTAN | Alteration | Signed-off | 03/25/2026 | 04/08/2026 | Design READ ARCHITECTURE DESIGN DPC | Interior renovation of existing apartment on the 18th floor Apt#18J. Architectural/construction work only. |
| M01204919 ↗ | 333 EAST 46 STREET MANHATTAN | Alteration | Signed-off | 06/30/2025 | 01/14/2026 | Design CONCESSI ENGINEERING, P.C. | ADDITION OF A NEW NON-LOAD BEARING PARTITION TO CREATE A BEDROOM IN AN EXISTING STUDIO, NEW FRENCH DOOR AND REPAIRS OF CEILINGS, AND FLOORIN… |
| S01089384 ↗ | 17 MILLS AVENUE STATEN ISLAND | Alteration | Signed-off | 08/22/2024 | 09/16/2024 | Filer LEWSAN CONSULTANTS | RENOVATE ATTIC TO COMPLY WITH ECB VIOLATION 3910556X |
| M01022866 ↗ | 35 WEST 92 STREET MANHATTAN | Alteration | Signed-off | 05/17/2024 | 05/23/2024 | Design RIP CONSTRUCTION CONSULTANTS | Interior partition removal and renovations as per plans no change to use egress or occupancy. |
| M00646541 ↗ | 154 WEST 15 STREET MANHATTAN | Alteration | Signed-off | 01/11/2022 | 01/10/2023 | Design CONCESSI ENGINEERING, P.C. Owner THOMPSON HOUSE GROUP LLC | WORK FILED TO LEGALIZE EXISTING THREE FIXTURE BATHROOM AND CLOSET IN CELLAR AND CORRECT VIOLATIONS 35248366L AND35248368P. NO CHANGE OF USE,… |
| M00615674 ↗ | 129 CROSBY STREET MANHATTAN | Alteration | Signed-off | 11/04/2021 | 11/26/2021 | Design CONCESSI ENGINEERING, P.C. | RE-BUILT GWB PARTITION IN EXISTING APARTMENT. NO CHANGE OF USE, EGRESS OR OCCUPANCY. |
| M00262623 ↗ | 25 EAST 7 STREET MANHATTAN | Alteration | Signed-off | 12/05/2019 | 01/17/2020 | STRUCTURAL REINFORCEMENT FOR NEW OPENING TO INSTALL SPIRAL STAIR. NO CHANGE OF USE, EGRESS OR OCCUPANCY. | |
| M00281016 ↗ | 25 EAST 7 STREET MANHATTAN | Alteration | Signed-off | 12/17/2019 | 01/17/2020 | Design CONCESSI ENGINEERING, P.C. | ADDITION OF THREE AC SPLIT SYSTEMS AND KITCHEN AND BATHROOM EXHAUSTS IN CONNECTION WITH RENOVATION TO EXISTING APARTMENTS IN 2ND, 4TH AND 5T… |
| 140880116BIS | 25 EAST 7 STREET MANHATTAN | — | ISSUED | 01/13/2020 | 01/13/2020 | — | OT |
| 123251612BIS | 162 WEST 56 STREET MANHATTAN | — | ISSUED | 06/14/2019 | 01/08/2020 | — | OT |
| 140845236BIS | 25 EAST 7 STREET MANHATTAN | — | ISSUED | 05/22/2019 | 01/07/2020 | — | OT, PL |
| 140876899BIS | 25 EAST 7 STREET MANHATTAN | — | ISSUED | 12/09/2019 | 12/09/2019 | — | OT |
| Building | Filings | Most Recent |
|---|---|---|
| 154 WEST 15 STREET ↗ | 1 | 07/08/2026 |
| 25 EAST 7 STREET ↗ | 4 | 07/08/2026 |
| 17 MILLS AVENUE ↗ | 1 | 07/08/2026 |
| 60 EAST 8 STREET ↗ | 1 | 04/10/2026 |
| 333 EAST 46 STREET ↗ | 4 | 04/09/2026 |
| 35 WEST 92 STREET ↗ | 3 | 03/21/2026 |
| 129 CROSBY STREET ↗ | 3 | 03/21/2026 |