| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01107770 ↗ | 44 HEMLOCK STREET BROOKLYN | Alteration | Permit Issued | 10/02/2024 | 06/03/2026 | Design BAYOMI ARCHITECT, PC | Renovation of existing 2 family home. |
| B00835431 ↗ | 1037 EAST 80 STREET BROOKLYN | Alteration CO | Permit Issued | 03/06/2023 | 05/07/2026 | Design M JUST ARCHITECTURE PC Filer JUST ARCHITECTURE | General Construction and structural work to renovate existing basement to create a new dwelling unit and obtain a new certificate of Occupan… |
| X00776188 ↗ | 4827 WHITE PLAINS ROAD BRONX | Alteration CO | Permit Issued | 02/23/2023 | 03/17/2026 | Design BAYOMI ARCHITECT, PC | Filing plumbing and gas related work on premises. |
| B01360869 ↗ | 833 ST MARKS AVENUE BROOKLYN | Alteration | Permit Issued | 02/20/2026 | 02/23/2026 | — | APPLICATION IS FILED FOR THE INSTALLATION OF ~63'-4 LONG, 8'-0 HIGH TEMPORARY CONSTRUCTION FENCE IN RESPONSE TO VIOLATION V 021026IMEGNCY199… |
| B01295593 ↗ | 2366 EAST 29 STREET BROOKLYN | Alteration | Signed-off | 09/30/2025 | 01/02/2026 | Design M JUST ARCHITECTURE PC Filer JUST ARCHITECTURE | Install Temp wood construction fence to be removed upon completion of work indicated on drawings filed herewith. No change in use egress or… |
| B01273272 ↗ | 2366 EAST 29 STREET BROOKLYN | Alteration | Signed-off | 08/19/2025 | 11/28/2025 | Design M JUST ARCHITECTURE PC Filer JUST ARCHITECTURE | General Construction to restore 1st floor to previous legal condition and rectify ECB Violation #34444760L indicated on drawings filed herew… |
| Name | Projects together | Most recent |
|---|---|---|
| BAYOMI ARCHITECT, PC | 8 | 11/09/2024 |
| M JUST ARCHITECTURE PC | 3 | 01/07/2026 |
| WRG ENGINEERING, P.C. | 3 | 02/06/2023 |
| SERMAN ENGINEERING | 2 | 07/02/2021 |
| 2LS CONSULTING ENGINEERING, DPC | 1 | 05/26/2023 |
| A&M CONSULTING | 1 | 03/15/2022 |
| JOADEM CORPORATION | 1 | 02/22/2022 |
| OMFPE CONSULTING PLLC | 1 | 11/09/2024 |
| SANDEEP GUNNALA ENGINEERING PLLC | 1 | 06/02/2022 |
| SOLOMONOFF ARCHITECTURE STUDIO | 1 | 05/26/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| C.R.P PLUMBING & HTG INC | 2 | 11/09/2024 |
| JUNIOR CARTER MECH. CORP | 1 | 05/03/2024 |
| OTEC PLBNG & HTG SVCS INC | 1 | 05/26/2023 |
| PSI CONSTRUCTION.LLC | 1 | 05/26/2023 |
| SORA LLC | 1 | 05/26/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| INNOVATIVE DESIGN AND CONSTRUCTION | 5 | 11/09/2024 |
| JUST ARCHITECTURE | 3 | 01/07/2026 |
| WRG ENGINEERING, P.C. | 2 | 02/06/2023 |
| PLUMBINGTECH INC | 1 | 02/22/2022 |
| RIZZO GROUP | 1 | 05/26/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01107770 ↗ | 44 HEMLOCK STREET BROOKLYN | Alteration | Permit Issued | 10/02/2024 | 06/03/2026 | Design BAYOMI ARCHITECT, PC | Renovation of existing 2 family home. |
| B00835431 ↗ | 1037 EAST 80 STREET BROOKLYN | Alteration CO | Permit Issued | 03/06/2023 | 05/07/2026 | Design M JUST ARCHITECTURE PC Filer JUST ARCHITECTURE | General Construction and structural work to renovate existing basement to create a new dwelling unit and obtain a new certificate of Occupan… |
| X00776188 ↗ | 4827 WHITE PLAINS ROAD BRONX | Alteration CO | Permit Issued | 02/23/2023 | 03/17/2026 | Design BAYOMI ARCHITECT, PC | Filing plumbing and gas related work on premises. |
| B01360869 ↗ | 833 ST MARKS AVENUE BROOKLYN | Alteration | Permit Issued | 02/20/2026 | 02/23/2026 | — | APPLICATION IS FILED FOR THE INSTALLATION OF ~63'-4 LONG, 8'-0 HIGH TEMPORARY CONSTRUCTION FENCE IN RESPONSE TO VIOLATION V 021026IMEGNCY199… |
| B01295593 ↗ | 2366 EAST 29 STREET BROOKLYN | Alteration | Signed-off | 09/30/2025 | 01/02/2026 | Design M JUST ARCHITECTURE PC Filer JUST ARCHITECTURE | Install Temp wood construction fence to be removed upon completion of work indicated on drawings filed herewith. No change in use egress or… |
| B01273272 ↗ | 2366 EAST 29 STREET BROOKLYN | Alteration | Signed-off | 08/19/2025 | 11/28/2025 | Design M JUST ARCHITECTURE PC Filer JUST ARCHITECTURE | General Construction to restore 1st floor to previous legal condition and rectify ECB Violation #34444760L indicated on drawings filed herew… |
| 321686038BIS | 1357 BUSHWICK AVENUE BROOKLYN | — | ISSUED | 01/31/2019 | 12/27/2024 | — | OT, PL |
| Q01107778 ↗ | 91-43 HOLLIS COURT BLVD QUEENS | Alteration | Signed-off | 10/01/2024 | 10/03/2024 | Design BAYOMI ARCHITECT, PC | NO WORK NEEDED. FILING TO REMOVE FULL VACATE EXISTS ON THIS PROPERTY. NEW HOME OWNERS ARE FILING TO ADDRESS THE FIXING OF THE ONE FAMILY HO… |
| M08036877 ↗ | 561 BROADWAY MANHATTAN | Alteration | Signed-off | 03/28/2023 | 10/01/2024 | Filer RIZZO GROUP | Plumbing modifications for interior demo & interior renovation work to the 9th floor as per plans filed herewith. No change in use egress o… |
| B01044624 ↗ | 1122 NOSTRAND AVENUE BROOKLYN | Alteration | Signed-off | 05/03/2024 | 08/06/2024 | Design BAYOMI ARCHITECT, PC | Renovating existing clothing store use group 6 to meeting hall use group 6. Work on Store front at ground level |
| 321450540BIS | 283 EAST 55TH STREET BROOKLYN | — | ISSUED | 10/24/2016 | 07/10/2024 | — | OT, PL |
| 420905275BIS | 101-44 132 STREET QUEENS | — | ISSUED | 08/18/2017 | 07/03/2024 | — | PL |
| 402536261BIS | 117-28 123 STREET QUEENS | — | ISSUED | 04/02/2007 | 06/02/2023 | — | EQ, PL |
| 322112263BIS | 319 SUMPTER STREET BROOKLYN | — | ISSUED | 02/28/2023 | 02/28/2023 | — | — |
| 321527228BIS | 18 TAMPA COURT BROOKLYN | — | ISSUED | 02/12/2018 | 02/17/2023 | — | EQ |
| B08018230 ↗ | 319 SUMPTER STREET BROOKLYN | Alteration | Signed-off | 12/20/2022 | 01/09/2023 | Design WRG ENGINEERING, P.C. | Construction Fence for building complete demolition |
| B08030311 ↗ | 319 SUMPTER STREET BROOKLYN | Alteration | Signed-off | 10/31/2022 | 12/20/2022 | Design WRG ENGINEERING, P.C. Filer WRG ENGINEERING, P.C. | TEMPORARY SHORING FOR BUILDING FULL DEMOLITION |
| B07995217 ↗ | 319 SUMPTER STREET BROOKLYN | Alteration | Signed-off | 09/12/2022 | 10/24/2022 | Design WRG ENGINEERING, P.C. Filer WRG ENGINEERING, P.C. | Supported scaffold to perform full demolition and shoring of existing building. |
| Q00450949 ↗ | 69-17 GOUVERNEUR AVENUE QUEENS | Alteration | Permit Issued | 02/15/2021 | 08/26/2022 | Design BAYOMI ARCHITECT, PC | REMOVAL OF PARTITATION WALLS. LOAD BEARING WALLS IN CELLAR NEEDS TO REMAIN CANNOT BE REMOVED. |
| B00516993 ↗ | 356 DEAN STREET BROOKLYN | Alteration | Permit Issued | 07/02/2021 | 07/14/2022 | Design SERMAN ENGINEERING | PROVIDE ALL LABOR, EQUIPMENT, MATERIALS, AND ACCESSORIES TO PERFORM THE WORK AS SHOWN ON THE DRAWINGS. THERE IS NO CHANGE TO USE, EGRESS, OR… |
| B00520429 ↗ | 356 DEAN STREET BROOKLYN | Alteration | Signed-off | 07/02/2021 | 07/14/2022 | Design SERMAN ENGINEERING | PROVIDE ALL LABOR, MATERIAL, EQUIPMENT, AND ACCESSORIES FOR THE EMERGENCY INSTALLATION OF TEMPORARY WOOD SHORING. WORK INCLUDES REMOVAL OF I… |
| B00747341 ↗ | 356 DEAN STREET BROOKLYN | Alteration | Signed-off | 06/02/2022 | 07/02/2022 | INSTALLATION OF 8' HIGH CONSTRUCTION FENCE AS PER DESIGN DRAWINGS | |
| B00492510 ↗ | 222 EAST 39 STREET BROOKLYN | Alteration | Permit Issued | 09/07/2021 | 06/10/2022 | Design JOADEM CORPORATION Filer PLUMBINGTECH INC | This application is filed to remove 1 3 piece bathroom(SHOWER, TOILET AND SINK) and removing gas stove and replace with gas dryer. |
| B00505643 ↗ | 376 MONROE STREET BROOKLYN | Alteration | Signed-off | 05/11/2021 | 04/27/2022 | Design BAYOMI ARCHITECT, PC | FILING FOR NO WORK PERMIT TO ADDRESS VIOLATION 35501195M. NO WORK NEEDED.EXTERIOR SHED TAKEN DOWN BY OWNER. |
| B00583391 ↗ | 1384 EAST 99 STREET BROOKLYN | Alteration | Signed-off | 09/01/2021 | 04/27/2022 | Design BAYOMI ARCHITECT, PC | REMOVAL OF SHED ERECTED IN REAR YARD BY HOME OWNER |
| Q00629952 ↗ | 215-31 MURDOCK AVENUE QUEENS | Alteration | Signed-off | 11/16/2021 | 04/27/2022 | Design BAYOMI ARCHITECT, PC | ADDRESS VIOLATION AT CELLAR LEVEL |
| M00231309 ↗ | 76 MAC DOUGAL STREET MANHATTAN | Alteration | Signed-off | 02/25/2020 | 03/11/2022 | Design A&M CONSULTING | REQUESTING TO REMOVE EMERGENCY AND STANDBY POWER SYSTEM INSPECTIONS. INSPECTIONS WAS ERRONEOUSLY ADDED |
| 240278472BIS | 2590 BRIGGS AVENUE BRONX | — | ISSUED | 10/15/2021 | 10/15/2021 | — | OT |
| 322044355BIS | 414 RUTLAND ROAD BROOKLYN | — | ISSUED | 11/25/2020 | 11/25/2020 | — | OT |
| 340737858BIS | 569 LEXINGTON AVENUE BROOKLYN | — | ISSUED | 07/21/2020 | 07/21/2020 | — | OT |
| Building | Filings | Most Recent |
|---|---|---|
| 44 HEMLOCK STREET ↗ | 2 | 07/08/2026 |
| 1037 EAST 80 STREET ↗ | 4 | 07/08/2026 |
| 356 DEAN STREET ↗ | 12 | 07/08/2026 |
| 69-17 GOUVERNEUR AVENUE ↗ | 2 | 07/08/2026 |
| 1384 EAST 99 STREET ↗ | 4 | 07/08/2026 |
| 91-43 HOLLIS COURT BLVD ↗ | 1 | 07/08/2026 |
| 376 MONROE STREET ↗ | 2 | 07/08/2026 |
| 561 BROADWAY ↗ | 1 | 07/08/2026 |
| 2366 EAST 29 STREET ↗ | 2 | 07/08/2026 |
| 76 MAC DOUGAL STREET ↗ | 1 | 04/09/2026 |
| 833 ST MARKS AVENUE ↗ | 1 | 04/09/2026 |
| 4827 WHITE PLAINS ROAD ↗ | 1 | 04/09/2026 |
| 319 SUMPTER STREET ↗ | 3 | 04/09/2026 |
| 1122 NOSTRAND AVENUE ↗ | 3 | 03/21/2026 |
| 222 EAST 39 STREET ↗ | 3 | 03/21/2026 |
| 215-31 MURDOCK AVENUE ↗ | 6 | 03/21/2026 |