| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00909393 ↗ | 141 5 AVENUE MANHATTAN | Alteration | Signed-off | 12/08/2023 | 04/26/2024 | Design COSTA ARCH & ENG LLP | UPGRADES TO CELLAR AND FIRST FLOOR MECHANICAL SYSTEMS |
| M00927261 ↗ | 141 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/30/2023 | 04/26/2024 | Design COSTA ARCH & ENG LLP | INSTALLATION OF NEW MECHANICAL CLOSET |
| B00749841 ↗ | 35 MCDONALD AVENUE BROOKLYN | Alteration | Signed-off | 08/10/2022 | 05/04/2023 | Design FSI ARCHITECTURE PC | General construction and mechanical work associated with upgrades to ventilation system. No change in occupancy, use or egress. |
| M00526008 ↗ | 51 GREENE STREET MANHATTAN | Alteration | Permit Issued | 09/03/2021 | 05/04/2023 | Design STUDIO CASTELLANO | Interior renovation of 6th floor apartment, work includes removal and installation of non bearing partitions and related finishes as per pla… |
| M00800152 ↗ | 38 WARREN STREET MANHATTAN | Alteration | Signed-off | 12/28/2022 | 05/04/2023 | Design FSI ARCHITECTURE PC Owner THE KEYSTONE CONDOMINIUM Filer EAST COAST EXPEDITING | Cooling tower and make-up air unit replacement. No change in occupancy, use or egress. |
| X00753164 ↗ | 3333 HENRY HUDSON PKWY W BRONX | Alteration | Signed-off | 06/23/2022 | 05/04/2023 | Design EN-POWER GROUP Owner ORSID NY Filer J.A. EXPEDITING, LLC | Filing application for mechanical work including installation of piping system, heat exchanges, exhaust fans,pool heater, split unit, air ha… |
| Name | Projects together | Most recent |
|---|---|---|
| COSTA ARCH & ENG LLP | 2 | 12/08/2023 |
| FSI ARCHITECTURE PC | 2 | 06/28/2023 |
| M.B. ARCHITECTURAL DESIGN | 2 | 12/20/2021 |
| MOSTAFA | 2 | 03/17/2021 |
| EN-POWER GROUP | 1 | 02/25/2025 |
| FRANCISCO D PEREZ PE | 1 | 07/18/2022 |
| STUDIO CASTELLANO | 1 | 11/17/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| ROSE ASSOCIATES | 2 | 03/17/2021 |
| KENDOR DEVELOPMENT LLC | 1 | 12/20/2021 |
| ORSID NY | 1 | 02/25/2025 |
| THE KEYSTONE CONDOMINIUM | 1 | 06/28/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| ALEA NYC LLC | 3 | 07/18/2022 |
| ROBERT S. SCHNITZER | 2 | 03/17/2021 |
| EAST COAST EXPEDITING | 1 | 06/28/2023 |
| J.A. EXPEDITING, LLC | 1 | 02/25/2025 |
| MICHAEL ZENREICH ARCHITECT, PC | 1 | 11/17/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00909393 ↗ | 141 5 AVENUE MANHATTAN | Alteration | Signed-off | 12/08/2023 | 04/26/2024 | Design COSTA ARCH & ENG LLP | UPGRADES TO CELLAR AND FIRST FLOOR MECHANICAL SYSTEMS |
| M00927261 ↗ | 141 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/30/2023 | 04/26/2024 | Design COSTA ARCH & ENG LLP | INSTALLATION OF NEW MECHANICAL CLOSET |
| B00749841 ↗ | 35 MCDONALD AVENUE BROOKLYN | Alteration | Signed-off | 08/10/2022 | 05/04/2023 | Design FSI ARCHITECTURE PC | General construction and mechanical work associated with upgrades to ventilation system. No change in occupancy, use or egress. |
| M00526008 ↗ | 51 GREENE STREET MANHATTAN | Alteration | Permit Issued | 09/03/2021 | 05/04/2023 | Design STUDIO CASTELLANO | Interior renovation of 6th floor apartment, work includes removal and installation of non bearing partitions and related finishes as per pla… |
| M00800152 ↗ | 38 WARREN STREET MANHATTAN | Alteration | Signed-off | 12/28/2022 | 05/04/2023 | Design FSI ARCHITECTURE PC Owner THE KEYSTONE CONDOMINIUM Filer EAST COAST EXPEDITING | Cooling tower and make-up air unit replacement. No change in occupancy, use or egress. |
| X00753164 ↗ | 3333 HENRY HUDSON PKWY W BRONX | Alteration | Signed-off | 06/23/2022 | 05/04/2023 | Design EN-POWER GROUP Owner ORSID NY Filer J.A. EXPEDITING, LLC | Filing application for mechanical work including installation of piping system, heat exchanges, exhaust fans,pool heater, split unit, air ha… |
| 140993824BIS | 51 GREENE STREET MANHATTAN | — | ISSUED | 07/20/2021 | 06/24/2022 | — | OT |
| M00446237 ↗ | 240 EAST 86 STREET MANHATTAN | Alteration | Signed-off | 03/17/2021 | 05/20/2022 | Design MOSTAFA Owner ROSE ASSOCIATES Filer ROBERT S. SCHNITZER | Herewith filing plans to modify existing steel dunnage at roof (to replace a packaged HVAC unit (ACCU-1) for heating & cooling). Related MS… |
| X00660142 ↗ | 3201 BRUNER AVENUE BRONX | Alteration | Permit Issued | 01/20/2022 | 02/22/2022 | Design FRANCISCO D PEREZ PE Filer ALEA NYC LLC | INSTALLATION OF (2) HEAT PUMPS, AS PER PLANS HEREWITH FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00617640 ↗ | 20 EXCHANGE PLACE MANHATTAN | Alteration | Permit Issued | 11/16/2021 | 12/15/2021 | Design M.B. ARCHITECTURAL DESIGN Filer ALEA NYC LLC | REPLACE OF EXHAUST SYSTEM AND COMBUSTION AIR CONNECTIONS. FOR 6 EXISTING H.W.H., AS PER PLANS HEREWITH FILED |
| M00620460 ↗ | 254 WEST 54 STREET MANHATTAN | Alteration | Signed-off | 10/29/2021 | 11/09/2021 | Design M.B. ARCHITECTURAL DESIGN Owner KENDOR DEVELOPMENT LLC Filer ALEA NYC LLC | PROPOSED6'x19'x8.6' = 7,558 GAL.METALLIC WATER FIRE RESERVE TANK AND RELATED WORKS |
| M00436226 ↗ | 240 EAST 86 STREET MANHATTAN | Alteration | Signed-off | 03/17/2021 | 05/13/2021 | Design MOSTAFA Owner ROSE ASSOCIATES Filer ROBERT S. SCHNITZER | Replacement of roof top packaged HVAC unit for heating & cooling. Gas line disconnect from old unit (HVAC-1) & reconnection to new unit (ACC… |
| Building | Filings | Most Recent |
|---|---|---|
| 315 EAST 70 STREET ↗ | 1 | 09/07/2026 |
| 3333 HENRY HUDSON PKWY W ↗ | 2 | 07/08/2026 |
| 20 EXCHANGE PLACE ↗ | 1 | 07/08/2026 |
| 38 WARREN STREET ↗ | 4 | 07/08/2026 |
| 3201 BRUNER AVENUE ↗ | 1 | 07/08/2026 |
| 240 EAST 86 STREET ↗ | 5 | 07/08/2026 |
| 51 GREENE STREET ↗ | 2 | 07/08/2026 |
| 141 5 AVENUE ↗ | 10 | 07/08/2026 |
| 35 MCDONALD AVENUE ↗ | 12 | 03/21/2026 |
| 254 WEST 54 STREET ↗ | 3 | 03/21/2026 |