← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
20 Exchange Place
20 EXCHANGE PLACE · BIN 1000830
💬 Discuss this project
1931Year Built
57Stories
RMBuilding Class
C5-5Zoning
776,000 sfGross Floor Area
763Units
LL97 CoveredRent Stabilized9 Open Violations ▸FISP: SWARMPFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 24,524 sf lot · 31.64 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof4p · 1 filing · 17 docs
Floor 562p · 1 filing · 10 docs
Floor 55
Floor 54
Floor 53
Floor 52
Floor 51
Floor 50
Floor 49
Floor 48
Floor 47
Floor 46
Floor 45
Floor 44
Floor 43
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 361p · 1 filing · 10 docs
Floor 351p · 1 filing · 4 docs
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19Under Construction30p · 1 filing · 20 docs
Floor 18Under Construction34p · 3 filings · 20 docs
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Under Construction34p · 7 filings · 20 docs
Floor 149p · 15 filings · 20 docs
MezzanineUnder Construction28p · 4 filings · 20 docs
Cellar47p · 10 filings · 20 docs
Sub-Cellar76p · 13 filings · 20 docs
Basement32p · 14 filings · 20 docs
Sub-Basement18p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
101 WEST END REIT4309/23/2026
192 COLUMBIA HEIGHTS2007/08/2026
DTH CAPITAL707/08/2026
RBNB 20 OWNERS14907/08/2026
C O ROSE ASSOCIATES903/22/2026
METRO LOFT MANAGEMENT1103/22/2026
THE WITIKOFF GROUP103/22/2026
C/O METRO LOFT MANAGEMENT403/22/2026
RBNB 20 OWNER LLC METRO L103/22/2026
C O METRO MANAGEMENT103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SBLM2103/21/2026
SPRING SCAFFOLDING LLC203/21/2026
OUTSOURCE CONSULTANTS, INC.1203/21/2026
METROPOLIS GROUP INC403/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
ALEA NYC1803/21/2026
SEVERINO ASSOCIATES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C&M DRYWALL & ACOUSTIC COGeneral Contractor1407/08/2026
SHANNON CONTRACTING LLCGeneral Contractor909/23/2026
SPRING SCAFFOLDING LLCGeneral Contractor907/08/2026
THE METRO GROUP, INCGeneral Contractor507/08/2026
ALVARADO, JUANElectrical303/21/2026
HALPERN, SElectrical303/21/2026
DEVO FIRE PROTECTION INCFire Protection207/08/2026
ANTONIO CERIELLO ELEC INCElectrical203/22/2026
JOROB CONTR'G & ELEC'L COElectrical203/22/2026
EXPERT FIRE SPRINKLER,LLCFire Protection207/08/2026
BRELLA SERVICES LLCGeneral Contractor207/08/2026
EXPERT FIRE SPRINKLER LLCGeneral Contractor203/21/2026
JEPOL CONSTRUCTION INCGeneral Contractor203/21/2026
ARMON MECHANICAL INCPlumbing207/08/2026
MARATHON MECHANICAL LLCPlumbing207/08/2026
MAXWELL PLUMB MECH. CORPPlumbing207/08/2026
M & C IMPACT IRON WORKElectrical103/21/2026
SKH MECHANICAL CORPFire Protection107/08/2026
GRECO, ANTHONYElectrical103/21/2026
NEE ELECTRICAL, LLCElectrical103/22/2026
BRAUNSTEIN, HOWARDElectrical103/21/2026
METROTECH MECHANICAL CORPPlumbing107/08/2026
JMS MECHANICAL CORPGeneral Contractor107/08/2026
PHOENIX SUTTON STR INCGeneral Contractor107/08/2026
SIMMONS, JEFFElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL TESTING & CONSULT16881207/28/2026
S&S CONCRETE & SOIL TESTI1008307/21/2026
GRANT ENGINEERING26271104/29/2026
MOTTOLA RINI ENGINEERS, P3251206/21/2023
SURFACE DESIGN PROFESSION3968206/01/2023
FRANCISCO D. PEREZ PE3306708/09/2022
JOSE A SANTOS PE, PC3292404/27/2022
Building Lifecycle
All (300)Filed (55)Permit Issued (41)Signed Off (11)Facade (FISP) (11)Violation (60)Inspection (22)Objection (70)Special Inspection (30)
09/22/2026
Permit issued — Structural
M01177031-S5-ST
08/31/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/26/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/26/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/25/2026
Objection resolved — Resolved
08/17/2026
Objection raised — Cost
08/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
08/11/2026
Special inspection requirement — Sprayed fire-resistant materials
SEBASTIAN SETTEDUCATE JR., P.E
08/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
SEBASTIAN SETTEDUCATE JR., P.E
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
08/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/28/2026
Filed — Alteration CO
SUBSQUENT NTERIOR PLUMBING FOR 18TH & 19TH FLOOR AS SHOWN HEREWITH.
M01177031-P6
07/28/2026
Special inspection requirement — Sprinkler Systems
SEBASTIAN SETTEDUCATE JR., P.E
07/28/2026
Special inspection requirement — Post-installed Anchors
SEBASTIAN SETTEDUCATE JR., P.E
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
07/27/2026
Filed — Alteration CO
SUBSQUENT NTERIOR PLUMBING FOR 18TH & 19TH FLOOR AS SHOWN HEREWITH.
M01177031-P4
07/24/2026
Permit issued — General Construction
M01226025-I1-GC
07/24/2026
Permit issued — Mechanical Systems
M01226025-S1-MS
07/21/2026
Filed — Alteration CO
SUBSQUENT NTERIOR PLUMBING FOR 18TH & 19TH FLOOR AS SHOWN HEREWITH.
M01177031-P5
07/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
SEBASTIAN SETTEDUCATE JR., P.E
07/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
07/21/2026
Special inspection requirement — Sprayed fire-resistant materials
SEBASTIAN SETTEDUCATE JR., P.E
07/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/14/2026
Special inspection requirement — Post-installed Anchors
GLEN LANGER
07/14/2026
Special inspection requirement — Mechanical Systems
SEBASTIAN SETTEDUCATE JR., P.E
07/14/2026
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
07/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
07/07/2026
Permit issued — General Construction
M01222852-I1-GC
04/29/2026
Filed — Alteration
FILING HEREWITH FOR THE SPRINKLER WORK RELATED TO THE CAFE. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY OR USE.
M00977113-P2
04/23/2026
Permit issued — Mechanical Systems
M01177031-S1-MS
04/22/2026
Permit issued — General Construction
M01177031-I1-GC
04/14/2026
Permit issued — Protection and Mechanical Methods
M01372067-I1-PMM
03/24/2026
Special inspection requirement — Sprinkler Systems
Stephen Morse
03/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/24/2026
Special inspection requirement — Post-installed Anchors
Stephen Morse
03/18/2026
Permit issued — Protection and Mechanical Methods
M01372067-I1-PMM
03/17/2026
Filed — Alteration
INSTALLATION OF INTERIOR TEMPORARY WORKING PLATOFRM & OVERHEAD PROTECTION SHED AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01372067-I1
03/08/2026
Violation issued (HPD, closed)
B
03/08/2026
Violation issued (HPD, closed)
B
03/08/2026
Violation issued (HPD, closed)
B
03/08/2026
Violation issued (HPD, closed)
B
03/04/2026
Violation issued (ECB, open)
Elevators
03/04/2026
Violation issued (ECB, closed)
Elevators
02/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/14/2026
Violation issued (FDNY_ORDER, closed)
01/11/2026
Objection raised — Scope
01/11/2026
Objection raised — Other
01/11/2026
Objection raised — Admin
01/07/2026
Filed — No Work
M01343283-I1
12/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/01/2025
Objection resolved — Addressed
12/01/2025
Objection resolved — Addressed
11/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/29/2025
Permit issued — Sprinklers
M01177031-S6-EW-SP
10/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/23/2025
Permit issued — Plumbing
M01177031-S2-PL
10/22/2025
Permit issued — Mechanical Systems
M01177031-S1-MS
09/22/2025
Filed — No Work
M01290423-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offSHANNON CONTRACTING LLC09/22/2026
DOB NOWGeneral ConstructionSigned-offSHANNON CONTRACTING LLC07/24/2026
DOB NOWMechanical SystemsPermit IssuedSHANNON CONTRACTING LLC07/24/2026
DOB NOWGeneral ConstructionSigned-offSHANNON CONTRACTING LLC07/07/2026
DOB NOWMechanical SystemsPermit IssuedSHANNON CONTRACTING LLC04/23/2026
DOB NOWGeneral ConstructionPermit IssuedSHANNON CONTRACTING LLC04/22/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedBRELLA SERVICES LLC04/14/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedBRELLA SERVICES LLC03/18/2026
DOB NOWSprinklersPermit IssuedSKH MECHANICAL CORP10/29/2025
DOB NOWPlumbingPermit IssuedMETROTECH MECHANICAL CORP10/23/2025
DOB NOWMechanical SystemsPermit IssuedSHANNON CONTRACTING LLC10/22/2025
DOB NOWGeneral ConstructionPermit IssuedSHANNON CONTRACTING LLC06/05/2025
DOB NOWGeneral ConstructionSigned-offSHANNON CONTRACTING LLC05/23/2025
DOB NOWSprinklersPermit IssuedDEVO FIRE PROTECTION INC04/15/2025
DOB NOWGeneral ConstructionPermit IssuedC&M DRYWALL & ACOUSTIC CO08/05/2024
DOB NOWSprinklersPermit IssuedDEVO FIRE PROTECTION INC08/02/2024
DOB NOWPlumbingSigned-offARMON MECHANICAL INC03/07/2024
DOB NOWStructuralSigned-offC&M DRYWALL & ACOUSTIC CO01/24/2024
DOB NOWStructuralSigned-offC&M DRYWALL & ACOUSTIC CO01/24/2024
DOB NOWMechanical SystemsPermit IssuedTHE METRO GROUP, INC12/27/2023
DOB NOWPlumbingSigned-offARMON MECHANICAL INC10/03/2023
DOB NOWGeneral ConstructionSigned-offC&M DRYWALL & ACOUSTIC CO09/21/2023
DOB NOWPlumbingSigned-offMAXWELL PLUMB MECH. CORP05/03/2023
DOB NOWStructuralSigned-offC&M DRYWALL & ACOUSTIC CO02/23/2023
DOB NOWStructuralSigned-offC&M DRYWALL & ACOUSTIC CO01/19/2023
DOB NOWMechanical SystemsPermit IssuedTHE METRO GROUP, INC01/04/2023
DOB NOWPlumbingSigned-offMAXWELL PLUMB MECH. CORP12/01/2022
DOB NOWGeneral ConstructionSigned-offHUDSON MERIDIAN CONST GP10/18/2022
DOB NOWMechanical SystemsPermit IssuedTHE METRO GROUP, INC09/16/2022
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC08/03/2022
DOB NOWPlumbingSigned-offMARATHON MECHANICAL LLC01/03/2022
DOB NOWMechanical SystemsPermit IssuedJMS MECHANICAL CORP12/15/2021
DOB NOWPlumbingSigned-offMARATHON MECHANICAL LLC12/18/2020
DOB NOWMechanical SystemsSigned-offEXPERT FIRE SPRINKLER12/10/2019
DOB NOWSprinklersSigned-offEXPERT FIRE SPRINKLER,LLC08/23/2019
DOB NOWSprinklersSigned-offEXPERT FIRE SPRINKLER,LLC08/22/2019
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC12/26/2018
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC02/27/2018
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC02/02/2018
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC01/04/2018
+ 51 more permits on file
3 projects · most recent 06/23/2025
Ventilation Systems Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/23/2025——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PUHY-EP72TNU-A1 80,000 BTU · Vrf Outdoor ×2
05/27/2025Signed-offSHANNON CONTRACTING LLCHeating Systems, Ventilation Systems
Heating
King ×8
11/16/2021Permit IssuedJMS MECHANICAL CORPVentilation Systems
Ventilation
Centrotec InnoFlue Single Wall Commercial Chimney ×6
3 projects · most recent 07/28/2026
Sprinkler System
FiledStatusContractorScope
07/28/2026Permit IssuedSKH MECHANICAL CORPSprinkler System
04/29/2026Permit IssuedDEVO FIRE PROTECTION INC—
06/23/2025——53 heads, 2 outlets
3 projects · most recent 07/28/2026
Water/Sanitary Gas
FiledStatusContractorScope
07/28/2026Permit IssuedMETROTECH MECHANICAL CORPGas, Water/Sanitary
06/23/2025——Water/Sanitary
08/23/2023Signed-offARMON MECHANICAL INCWater/Sanitary
23 projects · most recent 08/22/2026
General Wiring Lighting
FiledStatusContractorScope
08/22/2026Permit IssuedPOWER MASTERS ELEC'L CONTGeneral Wiring
05/13/2026Permit IssuedM.C. ELECTRICAL NY INCGeneral Wiring
03/19/2026Permit IssuedSOLAS ELECTRICAL CORP—
01/12/2026Permit IssuedNEE ELECTRICAL, LLC—
07/18/2025Permit IssuedS.E. ELECTL CONTNG CORPGeneral Wiring
07/11/2022CompleteELPO ELECTRICAL CONTG INC—
06/06/2022CompleteANTONIO CERIELLO ELEC INC—
03/31/2022CompleteANTONIO CERIELLO ELEC INC—
03/03/2022Permit IssuedANTONIO CERIELLO ELEC INCGeneral Wiring
09/07/2021Permit IssuedROBERT CHIMENTI3 meters, 1 new_meters
02/22/2021CompleteE-J ELEC. INSTALLATION COGeneral Wiring
11/22/2019CompleteJOROB CONTR'G & ELEC'L COGeneral Wiring
11/06/2019CompleteJOROB CONTR'G & ELEC'L COGeneral Wiring
11/06/2019CompleteJOROB CONTR'G & ELEC'L COGeneral Wiring
11/06/2019CompleteJOROB CONTR'G & ELEC'L COGeneral Wiring
3 projects · most recent 07/28/2026
Steel Concrete
FiledStatusContractorScope
07/28/2026Signed-offSHANNON CONTRACTING LLCSteel, Concrete
11/06/2023——Steel
———Steel
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
08/31/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/05/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/01/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/14/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
05/14/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/24/2024Fail-Final CND-Occupancy InspectionFailView ↗
03/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/18/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/11/2026Sprayed fire-resistant materialsSEBASTIAN SETTEDUCATE JR., P.Especial
08/11/2026Fire-Resistance Rated ConstructionSEBASTIAN SETTEDUCATE JR., P.Eprogress
08/11/2026Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
08/11/2026Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
07/28/2026Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
07/28/2026Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
07/28/2026Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
07/21/2026Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
07/21/2026Fire-Resistance Rated ConstructionSEBASTIAN SETTEDUCATE JR., P.Eprogress
07/21/2026Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
07/21/2026Sprayed fire-resistant materialsSEBASTIAN SETTEDUCATE JR., P.Especial
07/20/2026Tenant Protection Plan Compliance—special
07/14/2026Fire-Resistant Penetrations and JointsGLEN LANGERspecial
07/14/2026Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
07/14/2026Post-installed AnchorsGLEN LANGERspecial
07/14/2026FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
03/24/2026Post-installed AnchorsStephen Morsespecial
03/24/2026Tenant Protection Plan Compliance—special
03/24/2026Sprinkler SystemsStephen Morsespecial
07/14/2025Fire-Resistant Penetrations and JointsGLEN LANGERspecial
07/14/2025Tenant Protection Plan ComplianceGLEN LANGERspecial
07/14/2025Post-installed AnchorsGLEN LANGERspecial
06/23/2025Tenant Protection Plan Compliance—special
06/18/2025Post-installed Anchors—special
06/18/2025Fire-Resistant Penetrations and Joints—special
Latest 25 of 150.
▾Documents — 1,335 on file (BIS + DOB NOW)
▸Plans & Drawings58
▸DOB NOWPlans/Sketch39
09/06/2026M00701807-I1Request digital key ↗
09/06/2026M00000786-I1Request digital key ↗
09/03/2026M00617649-P1Request digital key ↗
Showing 3 of 39 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly9
09/05/2026M00135324-I1Request digital key ↗
08/28/2026M00975379-I1Request digital key ↗
08/27/2026M01034499-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/02/2026M00420249-P3Request digital key ↗
09/02/2026M00420249-P2Request digital key ↗
Showing 2 of 5 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/27/2026M01028440-I1Request digital key ↗
08/27/2026M01028440-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00117122-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00192159-I1Request digital key ↗
▸Applications & Permits242
▸BISPLAN / WORK APPROVAL APPLICATION134
01/21/2026104173270Open ↗
01/15/2026104173270Open ↗
08/19/2025104173270Open ↗
Showing 3 of 134 on file for this type
▸BISWORK PERMIT APPLICATION73
12/24/2019123369586Open ↗
11/22/2019123670535Open ↗
09/11/2019123763551Open ↗
Showing 3 of 73 on file for this type
▸DOB NOWLPC Approval/Permit32
09/06/2026M00701807-I1Open ↗
09/03/2026M00617649-I1Open ↗
09/03/2026M00617649-P1Open ↗
Showing 3 of 32 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOROUGH COMMISSIONER TO ADDRESS OPEN FA MODIFICATION APPLICATION #1234025991
07/31/2023104173270Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications318
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION140
03/23/2020123670535Open ↗
03/23/2020123670535Open ↗
03/23/2020123670535Open ↗
Showing 3 of 140 on file for this type
▸DOB NOWProgress Inspector Seal & Signature59
09/27/2026M01028440-P1Open ↗
09/23/2026M00192159-I1Open ↗
09/23/2026M00192159-I1Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature56
09/05/2026M00116919-I1Open ↗
09/05/2026M00117122-I1Open ↗
09/03/2026M00617649-I1Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature38
09/29/2026M00977113-P2Open ↗
09/23/2026M00192159-I1Open ↗
09/23/2026M00192159-I1Open ↗
Showing 3 of 38 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment118
▸BISSELF-CERT PLUMBING NOTICE37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE35
01/14/2020123688198Open ↗
07/10/2019123688198Open ↗
06/20/2019123688198Open ↗
Showing 3 of 35 on file for this type
▸BISSCHEDULE B - PLUMBING17
08/04/2020123369586Open ↗
Showing 1 of 17 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA15
05/16/2023123402594Open ↗
03/31/2021123162870Open ↗
Showing 2 of 15 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
10/29/2020123670535Open ↗
03/04/2020123670535Open ↗
01/22/2020104173270Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS2
10/29/2020123670535Open ↗
01/22/2020104173270Open ↗
▸BISSTANDPIPE INSP REPORT : FP-842
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOROUGH COMMISSIONER TO ADDRESS OPEN FIRE ALARM MODIFICATION APPLICATION1
06/27/2023104173270Open ↗
▸Safety & Tenant Protection24
▸BISTenant Protection Plan and Notes12
06/20/2019123688198Open ↗
09/08/2025104173270Open ↗
Showing 2 of 12 on file for this type
▸DOB NOWTenant Protection Plan5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWStreet Tree Checklist4
08/24/2026M00817745-I1Open ↗
Showing 1 of 4 on file for this type
▸BISDS1-Demolition Submittal Certification Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos91
▸DOB NOWDEP ACP-5: Asbestos Assessment Report43
09/06/2026M00701807-I1Open ↗
09/05/2026M00117122-I1Open ↗
09/03/2026M00617649-I1Open ↗
Showing 3 of 43 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)30
06/20/2019123688198Open ↗
Showing 1 of 30 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
11/30/2020123670535Open ↗
03/23/2020123670535Open ↗
02/21/2020123688198Open ↗
Showing 3 of 11 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
10/29/2020123670535Open ↗
03/23/2020123670535Open ↗
02/21/2020123688198Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY5
10/29/2020123670535Open ↗
10/29/2020123670535Open ↗
10/29/2020123670535Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs162
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST79
11/01/2023123402594Open ↗
06/29/2023123162870Open ↗
03/31/2021123162870Open ↗
Showing 3 of 79 on file for this type
▸BISLANDMARKS APPROVAL23
02/21/2020123688198Open ↗
08/27/2019123369586Open ↗
07/03/2019123554484Open ↗
Showing 3 of 23 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE19
01/21/2026104173270Open ↗
01/15/2026104173270Open ↗
08/19/2025104173270Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISSUPERSEDING LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLANDMARKS SIGNOFF4
03/31/2021123162870Open ↗
06/14/2019123535941Open ↗
Showing 2 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership95
▸BISCOST AFFIDAVIT90
10/29/2020123670535Open ↗
03/23/2020123670535Open ↗
03/04/2020123670535Open ↗
Showing 3 of 90 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
11/01/2023123402594Open ↗
04/17/2023104173270Open ↗
03/31/2021123162870Open ↗
▸DOB NOWPW3: Cost Affidavit (Before Sign Off)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms164
▸BISBOROUGH INTAKE FORM68
03/23/2020123670535Open ↗
03/19/2020104173270Open ↗
03/04/2020123670535Open ↗
Showing 3 of 68 on file for this type
▸BISADDITIONAL INFORMATION51
04/08/2024104173270Open ↗
06/27/2023104173270Open ↗
05/20/2020123369586Open ↗
Showing 3 of 51 on file for this type
▸BISEFILING COVER SHEET44
06/20/2019123688198Open ↗
Showing 1 of 44 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents20
▸DOB NOWProof of Historic Building7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWProperty Ownership Certification4
08/24/2026M00817745-I1Open ↗
08/21/2026M01177031-I1Open ↗
Showing 2 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type