| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01418447 ↗ | 137 ORCHARD STREET MANHATTAN | Alteration | Permit Issued | 06/22/2026 | 07/01/2026 | Design Enthink Engineering LLC | This application is being filed to repair exterior work at the subject premises, per plans submitted herewith. No change in use, egress or o… |
| M01005822 ↗ | 102 2 AVENUE MANHATTAN | Alteration | Permit Issued | 07/26/2024 | 06/10/2025 | Design BODNAR ARCHITECT PC Owner 300 EAST 6TH ST LLC | Facade Repairs of the 2nd to 5th Floors. No change in occupancy, use or egress. |
| M01049402 ↗ | 21 WEST 20 STREET MANHATTAN | Alteration | Signed-off | 06/24/2024 | 03/25/2025 | Design GACE DPC Owner SKYWAY DEVELOPMENT GROUP Filer JM ZONING, LLC. | REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS SUCH AS HUNG STEEL LINTEL REPLACEMENT, MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, C… |
| M01123991 ↗ | 45 COOPER STREET MANHATTAN | Alteration | Signed-off | 10/29/2024 | 11/04/2024 | Design VOLUME SPACE CONSULTING INC. | REMOVE THE EXISTING BRICK PARAPET WALL AND INSTALL METAL RAILING ON TOP. NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01112345 ↗ | 172 HENRY STREET MANHATTAN | Alteration | Signed-off | 10/07/2024 | 10/22/2024 | Facade restoration to address ECB violation 39076454Z | |
| M01117021 ↗ | 98 ST MARKS PLACE MANHATTAN | Alteration | Signed-off | 10/07/2024 | 10/10/2024 | Design VOLUME SPACE CONSULTING INC. Filer THE GREEN STUDIO | BRICK RE POINTING AS NECESSARY AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| Name | Projects together | Most recent |
|---|---|---|
| ENTHINK ENGINEERS LLC | 2 | 04/07/2023 |
| ROYAL ENGINEERING, P.C | 2 | 05/23/2019 |
| VOLUME SPACE CONSULTING INC. | 2 | 10/29/2024 |
| ASR ENGINEERING PC | 1 | 02/03/2023 |
| BODNAR ARCHITECT PC | 1 | 07/26/2024 |
| Enthink Engineering LLC | 1 | 06/22/2026 |
| GACE DPC | 1 | 06/24/2024 |
| JUSTIN GEORGES ARCHITECT | 1 | 06/04/2022 |
| PROJECT TACTICAL SOLUTIONS, LLC | 1 | 10/07/2024 |
| RAMA TECH | 1 | 05/17/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| PERSPECTIVE GENERAL CONST | 1 | 06/04/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| K.W. CONSTRUCTION & RENOVATION INC | 3 | 10/07/2024 |
| 300 EAST 6TH ST LLC | 1 | 07/26/2024 |
| PRESPECTIVE GENERAL CONSTRUCTION IN | 1 | 06/04/2022 |
| SKYWAY DEVELOPMENT GROUP | 1 | 06/24/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| THE GREEN STUDIO | 2 | 10/07/2024 |
| JM ZONING, LLC. | 1 | 06/24/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01418447 ↗ | 137 ORCHARD STREET MANHATTAN | Alteration | Permit Issued | 06/22/2026 | 07/01/2026 | Design Enthink Engineering LLC | This application is being filed to repair exterior work at the subject premises, per plans submitted herewith. No change in use, egress or o… |
| M01005822 ↗ | 102 2 AVENUE MANHATTAN | Alteration | Permit Issued | 07/26/2024 | 06/10/2025 | Design BODNAR ARCHITECT PC Owner 300 EAST 6TH ST LLC | Facade Repairs of the 2nd to 5th Floors. No change in occupancy, use or egress. |
| M01049402 ↗ | 21 WEST 20 STREET MANHATTAN | Alteration | Signed-off | 06/24/2024 | 03/25/2025 | Design GACE DPC Owner SKYWAY DEVELOPMENT GROUP Filer JM ZONING, LLC. | REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS SUCH AS HUNG STEEL LINTEL REPLACEMENT, MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, C… |
| M01123991 ↗ | 45 COOPER STREET MANHATTAN | Alteration | Signed-off | 10/29/2024 | 11/04/2024 | Design VOLUME SPACE CONSULTING INC. | REMOVE THE EXISTING BRICK PARAPET WALL AND INSTALL METAL RAILING ON TOP. NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01112345 ↗ | 172 HENRY STREET MANHATTAN | Alteration | Signed-off | 10/07/2024 | 10/22/2024 | Facade restoration to address ECB violation 39076454Z | |
| M01117021 ↗ | 98 ST MARKS PLACE MANHATTAN | Alteration | Signed-off | 10/07/2024 | 10/10/2024 | Design VOLUME SPACE CONSULTING INC. Filer THE GREEN STUDIO | BRICK RE POINTING AS NECESSARY AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| 440611562BIS | 115-25 METROPOLITAN AVENUE QUEENS | — | ISSUED | 07/13/2021 | 09/18/2024 | — | OT |
| X00670096 ↗ | 3055 DECATUR AVENUE BRONX | Alteration | Permit Issued | 06/04/2022 | 10/25/2023 | Design JUSTIN GEORGES ARCHITECT | FACEDE REPAIR BRICK REPLACEMENT REPOINTING WINDOW LINTERS |
| X00874687 ↗ | 150 WEST 195 STREET BRONX | Alteration | Signed-off | 05/17/2023 | 06/05/2023 | Design RAMA TECH | EXISTING APARTMENTS 3E AND 4E TO BE RESTORE TO ITS ORGINAL CONDITIONS DUE TO FIRE DAMAGES. THE NEW INTERIOR WALL FINISHES FIRE-RATED SHEETRO… |
| M08035800 ↗ | 117 WEST 74 STREET MANHATTAN | Alteration | Signed-off | 04/07/2023 | 04/10/2023 | Design ENTHINK ENGINEERS LLC | BRICK REPLACEMENT WORK, PRECAST STONE SILL REPLACEMENT WORK AND STUCCO REPAIR WORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| 123264403BIS | 301 COLUMBUS AVENUE MANHATTAN | — | ISSUED | 06/26/2020 | 02/14/2023 | — | OT |
| M08049966 ↗ | 111 WEST 68 STREET MANHATTAN | Alteration | Signed-off | 02/03/2023 | 02/09/2023 | Design ASR ENGINEERING PC Filer THE GREEN STUDIO | Replacement of the parapet wall as per plan. No change to use, egress or occupancy under this application. |
| X00700424 ↗ | 2401 EAST TREMONT AVENUE BRONX | Alteration | Signed-off | 03/29/2022 | 04/04/2022 | Design ENTHINK ENGINEERS LLC | REPLACE VINYL SIDING WITH CALIFORNIA STUCCO AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. |
| 140878557BIS | 415 EAST 71 STREET MANHATTAN | — | ISSUED | 11/22/2019 | 11/22/2019 | — | OT |
| M00171287 ↗ | 182 WEST 4 STREET MANHATTAN | Alteration | Permit Issued | 05/23/2019 | 05/28/2019 | Design ROYAL ENGINEERING, P.C | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPT… |
| M00171291 ↗ | 182 WEST 4 STREET MANHATTAN | Alteration | Permit Issued | 05/23/2019 | 05/28/2019 | Design ROYAL ENGINEERING, P.C | INSTALLATION OF TEMPORARY 48' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED) FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUP… |
| Building | Filings | Most Recent |
|---|---|---|
| 182 WEST 4 STREET ↗ | 2 | 07/08/2026 |
| 45 COOPER STREET ↗ | 1 | 07/08/2026 |
| 21 WEST 20 STREET ↗ | 1 | 07/08/2026 |
| 137 ORCHARD STREET ↗ | 1 | 07/03/2026 |
| 172 HENRY STREET ↗ | 1 | 04/09/2026 |
| 117 WEST 74 STREET ↗ | 3 | 03/21/2026 |
| 150 WEST 195 STREET ↗ | 3 | 03/21/2026 |
| 3055 DECATUR AVENUE ↗ | 6 | 03/21/2026 |
| 2401 EAST TREMONT AVENUE ↗ | 3 | 03/21/2026 |
| 111 WEST 68 STREET ↗ | 3 | 03/21/2026 |
| 98 ST MARKS PLACE ↗ | 3 | 03/21/2026 |
| 102 2 AVENUE ↗ | 3 | 03/21/2026 |