← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
21 WEST 20 STREET
MANHATTAN · BIN 1015492
💬 Discuss this project
1927Year Built
16Stories
RMBuilding Class
C6-4AZoning
80,907 sfGross Floor Area
15Units
LL97 CoveredRent Stabilized0 Open Violations
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 9,200 sf lot · 8.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof2p · 1 filing · 12 docs
Floor 710p · 4 filings · 20 docs
Floor 63p · 2 filings · 20 docs
Floor 513p · 4 filings · 20 docs
Floor 43p · 2 filings · 20 docs
Floor 317p · 7 filings · 20 docs
Floor 26p · 3 filings · 20 docs
Floor 147p · 4 filings · 20 docs
Mezzanine58p · 5 filings · 20 docs
Cellar12p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKYWAY DEVELOPMENT GROUP5909/13/2026
RENDY CONTRACTING CORP103/22/2026
REIDY CONSTRACTING CORP403/22/2026
REIDY CONTRACTING GROUP303/22/2026
485 REAL ESTATE SECURITIE103/22/2026
19-25 WEST 20 ST. PROPERTY LLC2803/21/2026
19 WEST 20TH STREET OWNER LLC903/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC2603/21/2026
SYNERGY BUILDING CONSULTANTS303/21/2026
BUILDING BROTHERS403/21/2026
RIZZO GROUP1503/21/2026
JM ZONING, LLC.203/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor1307/08/2026
L&K PARTNERS, INCGeneral Contractor803/21/2026
BUILDOPS INCGeneral Contractor603/21/2026
SCHIMENTI CONSTRUCTION COGeneral Contractor407/08/2026
CS BRIDGE CORPGeneral Contractor307/08/2026
ACTIVE SIGNSScaffold207/08/2026
MAC FELDER INCPlumbing207/08/2026
K.W. CONSTRUCTION & RENOVGeneral Contractor107/08/2026
CAPITOL FIRE SPRINKLER COFire Protection107/08/2026
REIDY CONTRACTING GROUPGeneral Contractor107/08/2026
ABCO-PEERLESS SPRKLR CORPFire Protection107/08/2026
TUXEDO ELEC'L CONTR'G INCElectrical103/22/2026
BEDROCK PLBG. & HTG., INCPlumbing107/08/2026
SCHLESINGER ELECT'L CONTRElectrical103/22/2026
SMART PLBG & HTG CORPPlumbing107/08/2026
P & D MECHANICAL CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CODEGREEN5101005/22/2026
SKYLINE ENGINEERING, PLLC267803/21/2025
W. ALLEN ENGINEERING PLLC664406/24/2024
WINTON GROUP ARCHITECTURE4343105/21/2021
Building Lifecycle
All (186)Filed (37)Permit Issued (30)Signed Off (23)Violation (42)Inspection (18)Objection (6)Special Inspection (30)
06/29/2026
Violation issued (ECB, closed)
Construction
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HATIM ELSAID
06/02/2026
Special inspection requirement — Sprayed fire-resistant materials
HATIM ELSAID
06/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
HATIM ELSAID
05/22/2026
Filed — Alteration CO
General construction to the Cellar, Floor 1, and Mezzanine - 1 to create health spa in accordance with plans filed herewith.
M00889069-P2
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HATIM ELSAID
05/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
HATIM ELSAID
05/21/2026
Special inspection requirement — Sprayed fire-resistant materials
HATIM ELSAID
12/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2025
Signed off — Alteration
MODIFICATION OF EXISTING SPRINKLER SYSTEM.
M01193067-I1
05/30/2025
Signed off — Alteration
M01193048-I1
05/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/12/2025
Signed off — Alteration
REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS SUCH AS HUNG STEEL LINTEL REPLACEMENT, MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, CRACK REPAIR OF BRICK & CONCRETE MASONRY UNITS, PATCHING AND CRACK REPAIR OF STONE.
M01049402-I1
05/05/2025
Signed off — Alteration
installation of mechanical units along with related duct work.
M01193059-I1
04/30/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/01/2025
Permit issued — Mechanical Systems
M01193059-I1-MS
03/28/2025
Permit issued — Sprinklers
M01193067-I1-EW-SP
03/25/2025
Permit issued — General Construction
M01193048-I1-GC
03/25/2025
Permit issued — Structural
M01049402-I1-ST
03/21/2025
Filed — Alteration
MODIFICATION OF EXISTING SPRINKLER SYSTEM.
M01193067-I1
03/21/2025
Filed — Alteration
M01193048-I1
03/21/2025
Filed — Alteration
installation of mechanical units along with related duct work.
M01193059-I1
03/14/2025
Signed off — Alteration
installation of mechanical system along with associated duct work.
M00833443-I1
03/11/2025
Special inspection requirement — Post-installed Anchors
Matthew Wavro
03/11/2025
Special inspection requirement — Final
Matthew Wavro
03/11/2025
Special inspection requirement — Mechanical Systems
Matthew Wavro
03/11/2025
Special inspection requirement — Sprinkler Systems
Matthew Wavro
03/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
02/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/04/2025
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED DOUBLE FACED BLADE SIGN (OTHERSHIP)
M01032102-I1
02/04/2025
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED DOUBLE FACED BLADE SIGN (OTHERSHIP)
M01032127-I1
01/31/2025
Signed off — Alteration
M00983507-I1
01/29/2025
Signed off — Alteration
M00833392-I1
01/27/2025
Signed off — Alteration
Installation of Plumbing fixtures along with related piping.
M00833467-I1
01/27/2025
Signed off — Alteration
installation of sprinkler fixtures along with related piping.
M00833457-I1
12/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
12/13/2024
Special inspection requirement — Final
Matthew Wavro
12/13/2024
Special inspection requirement — Mechanical Systems
Matthew Wavro
12/12/2024
Filed — Alteration
installation of mechanical system along with associated duct work.
M00833443-P1
10/30/2024
Special inspection requirement — Final
Matthew Wavro
10/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
10/30/2024
Special inspection requirement — Mechanical Systems
Matthew Wavro
08/08/2024
Permit issued — Sign
M01032102-I1-SG
08/08/2024
Permit issued — Sign
M01032127-I1-SG
07/17/2024
Filed — Alteration
INSTALL EXTERIOR NON-ILLUMINATED DOUBLE FACED BLADE SIGN (OTHERSHIP)
M01032102-I1
07/17/2024
Filed — Alteration
INSTALL EXTERIOR NON-ILLUMINATED DOUBLE FACED BLADE SIGN (OTHERSHIP)
M01032127-I1
07/16/2024
Signed off — Alteration
M00960836-I1
07/16/2024
Signed off — Alteration
M00960827-I1
06/27/2024
Signed off — Alteration
Plumbing modifications to the Cellar, Floor 1, and Mezzanine - 1 as per plans filed herewith. No change in use, egress, or occupancy.
M00889247-I1
06/24/2024
Filed — Alteration
REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS SUCH AS HUNG STEEL LINTEL REPLACEMENT, MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, CRACK REPAIR OF BRICK & CONCRETE MASONRY UNITS, PATCHING AND CRACK REPAIR OF STONE.
M01049402-I1
06/20/2024
Permit issued — Plumbing
M00833467-I1-PL
05/29/2024
Signed off — Alteration
Structural modifications to the Cellar, Floor 1, and Mezzanine - 1 as per plans filed herewith. No change in use, egress, or occupancy.
M00889252-I1
05/29/2024
Signed off — Alteration
Sprinkler modifications to the Cellar, Floor 1, and Mezzanine - 1 as per plans filed herewith. No change in use, egress, or occupancy.
M00889248-I1
05/28/2024
Signed off — Alteration
Mechanical modifications to the Cellar, Floor, and Mezzanine - 1 as per plans filed herewith. No change in use, egress, or occupancy.
M00889237-I1
05/28/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/24/2024
Filed — Alteration
Plumbing modifications to the Cellar, Floor 1, and Mezzanine - 1 as per plans filed herewith. No change in use, egress, or occupancy.
M00889247-P5
05/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/21/2024
Filed — Alteration
Plumbing modifications to the Cellar, Floor 1, and Mezzanine - 1 as per plans filed herewith. No change in use, egress, or occupancy.
M00889247-P4
05/17/2024
Filed — Alteration
Plumbing modifications to the Cellar, Floor 1, and Mezzanine - 1 as per plans filed herewith. No change in use, egress, or occupancy.
M00889247-P3
05/10/2024
Filed — Alteration
Sprinkler modifications to the Cellar, Floor 1, and Mezzanine - 1 as per plans filed herewith. No change in use, egress, or occupancy.
M00889248-P2
Latest 60 of 186 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offL&K PARTNERS, INC04/01/2025
DOB NOWSprinklersSigned-offP & D MECHANICAL CORP03/28/2025
DOB NOWGeneral ConstructionSigned-offL&K PARTNERS, INC03/25/2025
DOB NOWStructuralSigned-offK.W. CONSTRUCTION & RENOV03/25/2025
DOB NOWSignSigned-offACTIVE SIGNS INC08/08/2024
DOB NOWSignSigned-offACTIVE SIGNS INC08/08/2024
DOB NOWPlumbingSigned-offMAC FELDER INC06/20/2024
DOB NOWSuspended ScaffoldSigned-offSUMMIT DEVELOPMENT CORP02/20/2024
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO11/30/2023
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP11/16/2023
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP11/15/2023
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC11/09/2023
DOB NOWGeneral ConstructionPermit IssuedSCHIMENTI CONSTRUCTION CO10/20/2023
DOB NOWMechanical SystemsSigned-offSCHIMENTI CONSTRUCTION CO10/18/2023
DOB NOWStructuralSigned-offSCHIMENTI CONSTRUCTION CO10/18/2023
DOB NOWMechanical SystemsSigned-offL&K PARTNERS, INC05/03/2023
DOB NOWPlumbingSigned-offMAC FELDER INC05/03/2023
DOB NOWSprinklersSigned-offABCO-PEERLESS SPRKLR CORP04/29/2023
DOB NOWGeneral ConstructionSigned-offL&K PARTNERS, INC04/27/2023
DOB NOWMechanical SystemsSigned-offBUILDOPS INC10/25/2021
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP04/27/2021
DOB NOWGeneral ConstructionSigned-offBUILDOPS INC04/23/2021
DOB NOWConstruction FenceSigned-offREIDY CONTRACTING GROUP09/22/2020
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC03/02/2020
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC01/06/2020
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC12/16/2019
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC12/27/2018
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC12/26/2018
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC07/30/2018
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC07/26/2018
BIS—ISSUEDSKYWAY DEVELOPMENT GROUP12/19/2023
BIS—ISSUEDREIDY CONTRACTING GROUP09/14/2022
BISSDISSUEDMO CONTRACTING INC01/27/2022
BISPLISSUEDGW MECHANICAL CORP08/19/2021
BISOTISSUEDREIDY CONTRACTING GROUP06/22/2021
BISEQISSUEDREIDY CONTRACTING GROUP06/22/2021
BIS—ISSUEDREIDY CONTRACTING GROUP06/22/2021
BISMHISSUEDREIDY CONTRACTING GROUP06/22/2021
BISFSISSUEDCHAMPION COMBUSTION CORP02/17/2021
BISBLISSUEDGW MECHANICAL CORP01/12/2021
+ 34 more permits on file
12 projects · most recent 07/16/2024
General Wiring
FiledStatusContractorScope
07/16/2024CompleteLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
04/02/2024CompleteSCHLESINGER ELECT'L CONTRGeneral Wiring
11/10/2023CompleteNASH ELECTRIC SERVICES IN—
07/18/2022CompleteENTERPRISE ELEC'L SYSTEMSGeneral Wiring
04/25/2022CompleteAPOLLO ELECTRIC INSDUS INGeneral Wiring
02/15/2022CompleteAPOLLO ELECTRIC INSDUS IN—
01/04/2022CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
04/13/2021CompleteWARREN JOHNSON ELECTRICGeneral Wiring
09/10/2019CompleteTUXEDO ELEC'L CONTR'G INC—
09/19/2018CancelledAPOLLO ELECTRIC INC.General Wiring
07/17/2018CompleteTOP SHELF ELECTRIC CORP—
06/19/2018CancelledAPOLLO ELECTRIC INC.—
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
12/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/30/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/28/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/07/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/07/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/19/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/17/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/17/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/20/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
06/02/2026Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
06/02/2026Sprayed fire-resistant materialsHATIM ELSAIDspecial
06/02/2026Fire-Resistance Rated ConstructionHATIM ELSAIDprogress
05/21/2026Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
05/21/2026Fire-Resistance Rated ConstructionHATIM ELSAIDprogress
05/21/2026Sprayed fire-resistant materialsHATIM ELSAIDspecial
03/11/2025Post-installed AnchorsMatthew Wavrospecial
03/11/2025FinalMatthew Wavroprogress
03/11/2025Mechanical SystemsMatthew Wavrospecial
03/11/2025Sprinkler SystemsMatthew Wavrospecial
03/11/2025Fire-Resistant Penetrations and JointsMatthew Wavrospecial
12/13/2024Fire-Resistant Penetrations and JointsMatthew Wavrospecial
12/13/2024FinalMatthew Wavroprogress
12/13/2024Mechanical SystemsMatthew Wavrospecial
10/30/2024FinalMatthew Wavroprogress
10/30/2024Fire-Resistant Penetrations and JointsMatthew Wavrospecial
10/30/2024Mechanical SystemsMatthew Wavrospecial
05/10/2024Sprinkler SystemsHATIM ELSAIDspecial
05/10/2024Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
05/09/2024Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
05/09/2024Sprinkler SystemsHATIM ELSAIDspecial
04/08/2024FinalLEON SKVIRSKYprogress
01/31/2024Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
01/31/2024Sprinkler SystemsHATIM ELSAIDspecial
01/31/2024Sprayed fire-resistant materialsHATIM ELSAIDspecial
Latest 25 of 47.
▾Documents — 633 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch35
09/06/2026M00061406-I1Request digital key ↗
09/06/2026M00061408-I1Request digital key ↗
09/04/2026M00492644-I1Request digital key ↗
Showing 3 of 35 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/28/2026M00968912-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/04/2026M00379756-I1Request digital key ↗
▸Applications & Permits128
▸BISPLAN / WORK APPROVAL APPLICATION62
11/19/2025123918430Open ↗
11/18/2025123918430Open ↗
12/05/2023123918430Open ↗
Showing 3 of 62 on file for this type
▸BISWORK PERMIT APPLICATION39
12/19/2023123918430Open ↗
09/15/2022121204080Open ↗
07/12/2022121204080Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWLPC Approval/Permit25
08/17/2026M00889069-P2Open ↗
08/13/2026M00889252-P1Open ↗
08/13/2026M00889252-I1Open ↗
Showing 3 of 25 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
12/20/2023123918430Open ↗
02/10/2021121204080Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISVERIFY TAX LOT2
01/14/2025123918430Open ↗
01/17/2023121204080Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP2
01/14/2025123918430Open ↗
01/12/2023121204080Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00889069-I1Open ↗
▸Seals & Professional Certifications120
▸DOB NOWDPL-1: Design Professional Seal & Signature36
09/06/2026M00061406-I1Open ↗
09/06/2026M00061408-I1Open ↗
09/03/2026M00492130-I1Open ↗
Showing 3 of 36 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
03/17/2022123440936Open ↗
Showing 1 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/02/2026M00524425-I1Open ↗
09/02/2026M00524425-I1Open ↗
09/02/2026M00524425-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/02/2026M00524425-I1Open ↗
09/01/2026M00833392-I1Open ↗
09/01/2026M00833392-I1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
04/27/2021123440936Open ↗
Showing 1 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/01/2020140917186Open ↗
▸Trade Schedules & Equipment45
▸BISEQUIPMENT USE PERMITS20
11/23/2021121204080Open ↗
10/22/2021121204080Open ↗
10/22/2021121204080Open ↗
Showing 3 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING9
11/05/2021121204080Open ↗
10/29/2021121204080Open ↗
07/16/2021123267990Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
11/23/2021121204080Open ↗
10/22/2021121204080Open ↗
10/22/2021121204080Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
12/20/2022123382730Open ↗
05/02/2022123192348Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
12/10/2021123196326Open ↗
12/10/2021123196326Open ↗
▸BISSTANDPIPE SYSTEMS2
12/28/2021123196335Open ↗
12/28/2021123267990Open ↗
▸BISSPRINKLER SYSTEMS1
12/28/2021123267990Open ↗
▸BISHEATING SYSTEMS1
03/17/2022123196344Open ↗
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST4
10/10/2023123918430Open ↗
08/02/2023123918430Open ↗
07/01/2020140917186Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Checklist3
08/17/2026M00889069-P2Open ↗
08/17/2026M00889069-P1Open ↗
08/15/2026M00889069-I1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE SIGNOFF1
01/14/2025123918430Open ↗
▸Environmental & Asbestos53
▸DOB NOWDEP ACP-5: Asbestos Assessment Report28
09/06/2026M00061408-I1Open ↗
08/31/2026M00833457-I1Open ↗
08/31/2026M00833392-P1Open ↗
Showing 3 of 28 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION7
01/27/2026123918430Open ↗
03/17/2022123196344Open ↗
03/14/2022121204080Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
08/02/2023123918430Open ↗
Showing 1 of 2 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026M00524425-I1Open ↗
08/13/2026M00492644-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance1
▸BISNYCECC ANALYSIS1
11/03/2023123918430Open ↗
▸Inspections & Test Reports30
▸BISTECHNICAL REPORT: RESPONSIBILITY19
04/18/2022121204080Open ↗
04/18/2022121204080Open ↗
04/18/2022121204080Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS2
04/18/2022121204080Open ↗
04/12/2022123056888Open ↗
▸BISSTRUCTURAL STEEL - DETAILS2
04/18/2022121204080Open ↗
04/12/2022123056888Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
04/18/2022121204080Open ↗
04/12/2022123056888Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
04/18/2022121204080Open ↗
04/12/2022123056888Open ↗
▸BISDEEP FOUNDATIONS / PILES1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs63
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
12/30/2022123382730Open ↗
12/27/2022123196344Open ↗
05/05/2022123192348Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
11/19/2025123918430Open ↗
11/18/2025123918430Open ↗
11/03/2023123918430Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
01/27/2022123196335Open ↗
01/27/2022123196335Open ↗
Showing 2 of 10 on file for this type
▸BISLANDMARKS APPROVAL9
08/02/2023123918430Open ↗
07/01/2020140917186Open ↗
Showing 2 of 9 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/13/2026M00833392-P1Open ↗
08/13/2026M00833457-I1Open ↗
08/13/2026M00833467-I1Open ↗
Showing 3 of 9 on file for this type
▸BISLANDMARKS SIGNOFF7
01/11/2024123918430Open ↗
12/30/2022123382730Open ↗
12/27/2022123196344Open ↗
Showing 3 of 7 on file for this type
▸BISFINAL2
04/12/2022123056888Open ↗
03/17/2022123267990Open ↗
▸BISSUPERSEDING LETTER2
01/27/2022123196335Open ↗
Showing 1 of 2 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT17
12/21/2022123382730Open ↗
05/03/2022123192348Open ↗
Showing 2 of 17 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW39
03/11/2025123918430Open ↗
01/12/2023121204080Open ↗
12/27/2022123382730Open ↗
Showing 3 of 9 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
09/15/2022121204080Open ↗
Showing 1 of 4 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
11/03/2023123918430Open ↗
▸Filing & Intake Forms49
▸BISADDITIONAL INFORMATION25
12/15/2023123918430Open ↗
11/03/2023123918430Open ↗
10/10/2023123918430Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING COVER SHEET15
07/26/2023123918430Open ↗
Showing 1 of 15 on file for this type
▸BISBOROUGH INTAKE FORM9
01/27/2022123196335Open ↗
05/25/2021123196335Open ↗
Showing 2 of 9 on file for this type
▸Other Documents35
▸DOB NOWProof of Historic Building12
08/17/2026M00889069-P2Open ↗
08/13/2026M00889237-I1Open ↗
08/13/2026M00833443-I1Open ↗
Showing 3 of 12 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
11/03/2023123918430Open ↗
10/10/2023123918430Open ↗
10/10/2023123918430Open ↗
Showing 3 of 7 on file for this type
▸BISSupporting Document: Fee Exempt4
10/10/2023123918430Open ↗
10/10/2023123918430Open ↗
07/26/2023123918430Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification3
08/17/2026M00889069-P2Open ↗
08/17/2026M00889069-P1Open ↗
08/15/2026M00889069-I1Open ↗
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BIS* ENVIRONMENTAL 'E' DEP NOTICE OF SATISFACTION2
04/25/2022123267990Open ↗
04/12/2022123056888Open ↗
▸BISEMERGENCY & STANDBY POWER SYSTEMS (GENERATORS)1
01/27/2022123196326Open ↗
▸BISAI-1 APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFUEL-OIL STORAGE AND FUEL-OIL PIPING SYSTEMS1
01/27/2022123196326Open ↗
▸DOB NOWCalculations1
08/13/2026M00983507-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M00983507-I1Open ↗