← Back
Contractor
MASTER COMFORT LLC
General Contractor
MANHATTAN · 4BRONX · 4
7 buildings
12
Total Filings
8
Projects on File
7
Buildings Worked
0
Projects w/ Open Permits
General Contractor
Primary Trade
Activity
Projects by first filing month8 projects all-time
0134Nov '24 · 1Jul '25 · 1Aug '25 · 3Sep '25 · 1Feb '26 · 1Mar '26 · 1Nov '24Jan '25Mar '25May '25Jul '25Sep '25Nov '25Jan '26Mar '26
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Signed off8100%
By project type
Alteration8
Most active buildings
All buildings →
321 AUDUBON AVENUEMANHATTAN · latest 08/27/2025
2 projects
86 KING STREETMANHATTAN · latest 02/17/2026
1 projects
15 WEST 55 STREETMANHATTAN · latest 04/14/2026
1 projects
416 EAST 189 STREETBRONX · latest 09/22/2025
1 projects
392 BEDFORD PARK BLVDBRONX · latest 12/18/2024
1 projects
1805 WILLIAMSBRIDGE ROADBRONX · latest 08/11/2025
1 projects
Key relationships
Everyone →
Filing representatives
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01365785 ↗15 WEST 55 STREET
MANHATTAN
AlterationSigned-off03/18/202604/14/2026PROPOSED INSTALLATION OFMINI SPLIT HEAT PUMP SYSTEM
M01357307 ↗86 KING STREET
MANHATTAN
AlterationSigned-off02/09/202602/17/2026
Filer PWF
MODIFICATIONS OF EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC INSTALLATION AND ASSOCIATED PIPING. NO CHANGE TO USE, OCCUPANCY OR EGRESS
X01254607 ↗416 EAST 189 STREET
BRONX
AlterationSigned-off08/07/202509/22/2025APPLICATION FILED FOR INSTALLATION OF: TWO 10-TON HEAT PUMP UNITS, THREE 5-TON AIR HANDLER UNITS, ONE 3-TON AIR HANDLER UNIT, TWO 1-TON AIR …
X01278980 ↗4235 KATONAH AVENUE
BRONX
AlterationSigned-off09/09/202509/09/2025—INSTALL NEW HVAC SPLIT SYSTEM AS PER PLANS NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01277225 ↗321 AUDUBON AVENUE
MANHATTAN
AlterationSigned-off08/26/202508/27/2025Filing to correct the certificate of compliance.
M01266282 ↗321 AUDUBON AVENUE
MANHATTAN
AlterationSigned-off08/17/202508/19/2025HVAC work for the Direct replacement of RTU and split system condensers.
Counts cover all 8 projects (8 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
AG ENGINEERING PLLC408/26/2025
BANGASH ASSOCIATES INC.203/18/2026
TWIG CONSULTING ENGINEERS PC102/09/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
SAND ASSET MANAGEMENT LLC208/26/2025
ALMA REALTY CORP107/28/2025
ClubHouse Ventures LLC102/09/2026
MORNINGSIDE CONSTRUCTION LLC108/07/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
SUMMIT CONSULTING & EXPEDITING603/18/2026
PWF102/09/2026
8 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 8Signed off 8
8 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01365785 ↗15 WEST 55 STREET
MANHATTAN
AlterationSigned-off03/18/202604/14/2026PROPOSED INSTALLATION OFMINI SPLIT HEAT PUMP SYSTEM
M01357307 ↗86 KING STREET
MANHATTAN
AlterationSigned-off02/09/202602/17/2026
Filer PWF
MODIFICATIONS OF EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC INSTALLATION AND ASSOCIATED PIPING. NO CHANGE TO USE, OCCUPANCY OR EGRESS
X01254607 ↗416 EAST 189 STREET
BRONX
AlterationSigned-off08/07/202509/22/2025APPLICATION FILED FOR INSTALLATION OF: TWO 10-TON HEAT PUMP UNITS, THREE 5-TON AIR HANDLER UNITS, ONE 3-TON AIR HANDLER UNIT, TWO 1-TON AIR …
X01278980 ↗4235 KATONAH AVENUE
BRONX
AlterationSigned-off09/09/202509/09/2025—INSTALL NEW HVAC SPLIT SYSTEM AS PER PLANS NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01277225 ↗321 AUDUBON AVENUE
MANHATTAN
AlterationSigned-off08/26/202508/27/2025Filing to correct the certificate of compliance.
M01266282 ↗321 AUDUBON AVENUE
MANHATTAN
AlterationSigned-off08/17/202508/19/2025HVAC work for the Direct replacement of RTU and split system condensers.
X01230872 ↗1805 WILLIAMSBRIDGE ROAD
BRONX
AlterationSigned-off07/28/202508/11/2025INSTALLATION OF ONE (1) 2-TON MINI SPLIT SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01047125 ↗392 BEDFORD PARK BLVD
BRONX
AlterationSigned-off11/01/202412/18/2024Filing to replace existing HVAC system with three (3) 4-Ton units and one (1) 2-ton unit. New work to include but not limited to new new duc…
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
15 WEST 55 STREET ↗107/08/2026
321 AUDUBON AVENUE ↗407/08/2026
392 BEDFORD PARK BLVD ↗107/08/2026
416 EAST 189 STREET ↗107/08/2026
86 KING STREET ↗104/09/2026
4235 KATONAH AVENUE ↗104/08/2026
1805 WILLIAMSBRIDGE ROAD ↗303/21/2026
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026M01266282-I1 · 321 AUDUBON AVENUEOpen ↗
09/23/2026M01266282-I1 · 321 AUDUBON AVENUEOpen ↗
09/23/2026M01277225-I1 · 321 AUDUBON AVENUEOpen ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026M01266282-I1 · 321 AUDUBON AVENUEOpen ↗
09/23/2026M01277225-I1 · 321 AUDUBON AVENUEOpen ↗
09/23/2026X01230872-I1 · 1805 WILLIAMSBRIDGE ROADOpen ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/22/2026M01266282-I1 · 321 AUDUBON AVENUEOpen ↗
08/21/2026M01277225-I1 · 321 AUDUBON AVENUEOpen ↗
08/18/2026X01278980-I1 · 4235 KATONAH AVENUEOpen ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026X01254607-I1 · 416 EAST 189 STREETOpen ↗
08/13/2026X01047125-I1 · 392 BEDFORD PARK BLVDOpen ↗