← Back
Contractor
MONTANA COOLING & HEATING
General Contractor
6 projects with open permitsBRONX · 4MANHATTAN · 1BROOKLYN · 1
7 buildings
9
Total Filings
7
Projects on File
7
Buildings Worked
6
Projects w/ Open Permits
General Contractor
Primary Trade
Activity
Projects by first filing month7 projects all-time
0112Apr '21 · 1Dec '23 · 1Jun '24 · 1Jul '24 · 1Sep '24 · 1Apr '25 · 1Jul '26 · 120222023202420252026
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit686%
Signed off114%
By project type
New Building4
Alteration2
ALT-CO - New Building with Existing Elements to Remain1
Most active buildings
All buildings →
104 EAST 25 STREETMANHATTAN · 1 open · latest 09/29/2026
1 projects
715 EAST 216 STREETBRONX · 1 open · latest 08/05/2025
1 projects
293 EAST 207 STREETBRONX · 1 open · latest 07/24/2026
1 projects
3530 WILLETT AVENUEBRONX · 1 open · latest 11/13/2025
1 projects
869 EAST 175 STREETBRONX · 1 open · latest 01/07/2026
1 projects
311 EASTERN PARKWAYBROOKLYN · latest 02/19/2026
1 projects
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01431735 ↗104 EAST 25 STREET
MANHATTAN
AlterationPermit Issued07/31/202609/29/2026
Owner COLLIERS
Plumbing work as shown on plans filed herewith. No change in use, egress, or occupancy
X01190580 ↗293 EAST 207 STREET
BRONX
New BuildingPermit Issued04/21/202507/24/2026
Owner H20 LLC
Support of Excavation filing in conjunction with GC filing # X01190580-S1.
B00455076 ↗311 EASTERN PARKWAY
BROOKLYN
AlterationSigned-off04/12/202102/19/2026
Owner HARPIA
Propose Mechanical Scope of work filed in conjunction with NB # 321599409.
S00961961 ↗135 ARLINGTON AVENUE
STATEN ISLAND
ALT-CO - New Building with Existing Elements to RemainPermit Issued12/04/202301/20/2026New Plumbing System filed in conjunction with Alt1 application #S00961961-I1
X01103533 ↗869 EAST 175 STREET
BRONX
New BuildingPermit Issued09/27/202401/07/2026Support of Excavation work in conjunction with NB application #X01103533-I1
X01065506 ↗3530 WILLETT AVENUE
BRONX
New BuildingPermit Issued07/17/202411/13/2025Structural work in conjunction with NB application #X01065506-I1
Counts cover all 7 projects (7 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Grid Drafting and Consulting LLC312/23/2025
ANZ CONSULTING ENGINEERING, PLLC103/12/2026
ARMIR TARAJ PE107/21/2026
AUTOMATED DESIGN ENGINEERING, PLLC107/21/2026
DESIGN REPUBLIC108/31/2026
FISKAA ENGINEERING108/31/2026
FRED GEREMIA, ARCHITECTS & PLANNERS107/21/2026
NODE ENGINEERING & CONSULTING, PC107/31/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
A M B MECHANICAL INC207/21/2026
HORBRIDGE PLUMBING & HEAT207/21/2026
5 POINTS REHAB LLC112/18/2025
ATLAS SUPREME SERVICE INC108/31/2026
GO PRO FIRE PROTECTION C112/18/2025
HENNAN GROUP INC112/18/2025
INFINITI ESC PLUMBING COR112/18/2025
IPS PLUMBING CORP107/31/2026
KODRA CONSTRUCTION CORP112/23/2025
L & A DEVELOPERS GROUP*105/28/2025
LXC CONSTRUCTION INC103/12/2026
MAM PLBG & HTG CORP105/28/2025
NEW LINE CONSTRUCTION LLC107/21/2026
NEW YORK PARK PLBG&HTG CO108/31/2026
PSI CONSTRUCTION.LLC103/12/2026
ROCKEFELLER PLMBG & HTG I105/28/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
COLLIERS108/31/2026
H20 LLC107/21/2026
HARPIA103/12/2026
Illyricum Realty LLC105/28/2025
MENDEZ BROS CONSTRUCTION CORP107/31/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
GRID DRAFTING AND CONSULTING LLC312/23/2025
BMB BUILDING CONSULTING INC.103/12/2026
NEW LINE CONSTRUCTION107/21/2026
NODE ARCHITECTURE,ENGINEERING,CON107/31/2026
WILLIAM VITACCO ASSOCIATES108/31/2026
7 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 7Open permit 6Signed off 1
Any typeNew Building 4Alteration 2ALT-CO - New Building with Existing Elements to Remain 1
7 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01431735 ↗104 EAST 25 STREET
MANHATTAN
AlterationPermit Issued07/31/202609/29/2026
Owner COLLIERS
Plumbing work as shown on plans filed herewith. No change in use, egress, or occupancy
X01190580 ↗293 EAST 207 STREET
BRONX
New BuildingPermit Issued04/21/202507/24/2026
Owner H20 LLC
Support of Excavation filing in conjunction with GC filing # X01190580-S1.
B00455076 ↗311 EASTERN PARKWAY
BROOKLYN
AlterationSigned-off04/12/202102/19/2026
Owner HARPIA
Propose Mechanical Scope of work filed in conjunction with NB # 321599409.
S00961961 ↗135 ARLINGTON AVENUE
STATEN ISLAND
ALT-CO - New Building with Existing Elements to RemainPermit Issued12/04/202301/20/2026New Plumbing System filed in conjunction with Alt1 application #S00961961-I1
X01103533 ↗869 EAST 175 STREET
BRONX
New BuildingPermit Issued09/27/202401/07/2026Support of Excavation work in conjunction with NB application #X01103533-I1
X01065506 ↗3530 WILLETT AVENUE
BRONX
New BuildingPermit Issued07/17/202411/13/2025Structural work in conjunction with NB application #X01065506-I1
X01059585 ↗715 EAST 216 STREET
BRONX
New BuildingPermit Issued06/14/202408/05/2025Support of excavation work in conjunction with X01059585
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
104 EAST 25 STREET ↗109/30/2026
293 EAST 207 STREET ↗107/25/2026
869 E 175 ST ↗107/08/2026
311 EASTERN PARKWAY ↗104/09/2026
135 ARLINGTON AVENUE ↗304/09/2026
3530 WILLETT AVENUE ↗104/09/2026
715 EAST 216 STREET ↗104/09/2026
▾Documents — 430 on file (BIS + DOB NOW)
▸Plans & Drawings50
▸DOB NOWPlans/Sketch47
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 47 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
▸Zoning, Tax Lot & Property Records28
▸DOB NOWHouse Number Verification: TOPO Stamp10
09/01/2026X01059585-I1 · 715 EAST 216 STREETOpen ↗
Showing 1 of 10 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWZoning Exhibit form (1-5)9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸Seals & Professional Certifications267
▸DOB NOWProgress Inspector Seal & Signature156
09/29/2026X01103533-I1 · 869 EAST 175 STREETOpen ↗
09/29/2026X01103533-I1 · 869 EAST 175 STREETOpen ↗
09/29/2026X01103533-I1 · 869 EAST 175 STREETOpen ↗
Showing 3 of 156 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature62
09/29/2026X01103533-I1 · 869 EAST 175 STREETOpen ↗
09/29/2026X01103533-I1 · 869 EAST 175 STREETOpen ↗
09/29/2026X01059585-S2 · 715 EAST 216 STREETOpen ↗
Showing 3 of 62 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature49
09/01/2026B00455076-I1 · 311 EASTERN PARKWAYOpen ↗
09/01/2026B00455076-P1 · 311 EASTERN PARKWAYOpen ↗
Showing 2 of 49 on file for this type
▸Trade Schedules & Equipment10
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)10
09/01/2026X01059585-I1 · 715 EAST 216 STREETOpen ↗
Showing 1 of 10 on file for this type
▸Safety & Tenant Protection17
▸DOB NOWStreet Tree Checklist8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWStreet Tree Sign Off2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWStreet Trees Site Plan2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos16
▸DOB NOWOER: Notice to Proceed10
09/01/2026X01059585-I1 · 715 EAST 216 STREETOpen ↗
09/01/2026X01059585-I1 · 715 EAST 216 STREETOpen ↗
Showing 2 of 10 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00455076-I1 · 311 EASTERN PARKWAYOpen ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents33
▸DOB NOWSite Survey: Initial9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWProperty Ownership Certification9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWAdjoining Owners Notification4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWFinal Survey2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type