← Back
Contractor
ROXY INTERIORS LLC
General Contractor
1 project with open permitsMANHATTAN · 2
2 buildings
3
Total Filings
2
Projects on File
2
Buildings Worked
1
Projects w/ Open Permits
General Contractor
Primary Trade
Activity
Not enough dated projects to chart.
Portfolio status
Browse projects →
Open permit150%
Signed off150%
By project type
Alteration2
Most active buildings
All buildings →
80 CENTRAL PARK WESTMANHATTAN · latest 01/09/2026
1 projects
2039 BROADWAYMANHATTAN · 1 open · latest 07/31/2025
1 projects
Key relationships
Everyone →
Filing representatives
Contractors
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01249636 ↗80 CENTRAL PARK WEST
MANHATTAN
AlterationSigned-off07/14/202501/09/2026PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 16CD ON THE 15TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. PL FILED HERE …
M01248283 ↗2039 BROADWAY
MANHATTAN
AlterationPermit Issued07/01/202507/31/2025REPLACE AND INSTALL NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Counts cover all 2 projects (2 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
LAM & LAM DESIGNS DPC107/03/2025
RAD DESIGN & ARCHITECTURE PLLC107/31/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
TAP PLUMBING CORP207/31/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
J.A. EXPEDITING, LLC107/31/2026
LAM & LAM ENGINEERING D.P.C.107/03/2025
2 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 2Open permit 1Signed off 1
2 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01249636 ↗80 CENTRAL PARK WEST
MANHATTAN
AlterationSigned-off07/14/202501/09/2026PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 16CD ON THE 15TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. PL FILED HERE …
M01248283 ↗2039 BROADWAY
MANHATTAN
AlterationPermit Issued07/01/202507/31/2025REPLACE AND INSTALL NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
2039 BROADWAY ↗107/08/2026
80 CENTRAL PARK WEST ↗204/09/2026
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026M01248283-S1 · 2039 BROADWAYRequest digital key ↗
08/23/2026M01248283-I1 · 2039 BROADWAYRequest digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits5
▸DOB NOWLPC Approval/Permit5
08/17/2026M01249636-P2 · 80 CENTRAL PARK WESTOpen ↗
Showing 1 of 5 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026M01249636-P1 · 80 CENTRAL PARK WESTOpen ↗
09/01/2026M01249636-P1 · 80 CENTRAL PARK WESTOpen ↗
09/01/2026M01249636-P1 · 80 CENTRAL PARK WESTOpen ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026M01248283-I1 · 2039 BROADWAYOpen ↗
08/23/2026M01248283-S1 · 2039 BROADWAYOpen ↗
Showing 2 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026M01249636-P1 · 80 CENTRAL PARK WESTOpen ↗
09/01/2026M01249636-P3 · 80 CENTRAL PARK WESTOpen ↗
08/26/2026M01249636-P2 · 80 CENTRAL PARK WESTOpen ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/23/2026M01248283-S1 · 2039 BROADWAYOpen ↗
08/23/2026M01248283-I1 · 2039 BROADWAYOpen ↗
Showing 2 of 7 on file for this type