| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X01133250 ↗ | 329 EAST 197 STREET BRONX | Alteration | Signed-off | 10/29/2024 | 11/25/2024 | Design BL CONSULTANT | PARTIAL EXTERIOR FACADE REPAIR INCLUDING REPLACEMENT OF STEEL LINTEL AND REMOVAL AND REPLACEMENT OF FACE BRICK. ALL WORK PER PROPOSED PLAN S… |
| X08049231 ↗ | 155 E MOSHOLU PARKWAY N BRONX | Alteration | Permit Issued | 12/15/2022 | 11/30/2023 | Design C2B ARCHITECTS PC | APPLICATION FILED FOR FACADE REPAIRS TO ADDRESS ECB AND DOB VIOLATIONS AS NOTED ABOVE. |
| X00944296 ↗ | 3510 BAINBRIDGE AVENUE BRONX | Alteration | Permit Issued | 10/10/2023 | 11/17/2023 | Design METRO STRUCTURES Filer PINNACLE BUILDING CON | APPLICATION IS FOR FILED FOR THE REMOVAL OF EXTERIOR FINISH INSTALLED AT 1 FLOOR MEDICAL OFFICE UNDER APPLICATION X00609429-I1. RESTORATION … |
| X00804970 ↗ | 764 TINTON AVENUE BRONX | Alteration | Signed-off | 12/28/2022 | 09/06/2023 | Design OZAETA ENGINEERING, PLLC Filer H DESIGN STUDIO INC | EMERGENCY SHORING OF THE NORTH AND SOUTH EXISTING FREE STANDING AND RETAINING WALLS. NO CHANGE IN USE EGRESS OR OCCUPANCY. |
| 123763640BIS | 318 PLEASANT AVENUE MANHATTAN | — | ISSUED | 05/14/2019 | 06/18/2019 | — | OT |
| 123278997BIS | 31 CROSBY STREET MANHATTAN | — | ISSUED | 05/04/2018 | 05/04/2018 | — | OT |
| Name | Projects together | Most recent |
|---|---|---|
| BL CONSULTANT | 1 | 10/29/2024 |
| C2B ARCHITECTS PC | 1 | 12/15/2022 |
| METRO STRUCTURES | 1 | 10/10/2023 |
| OZAETA ENGINEERING, PLLC | 1 | 12/28/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| JAMES J DESTRA | 1 | 10/10/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| A&A PROPERTY MAINT SERVICES, INC. | 1 | 12/15/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| H DESIGN STUDIO INC | 1 | 12/28/2022 |
| PINNACLE BUILDING CON | 1 | 10/10/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X01133250 ↗ | 329 EAST 197 STREET BRONX | Alteration | Signed-off | 10/29/2024 | 11/25/2024 | Design BL CONSULTANT | PARTIAL EXTERIOR FACADE REPAIR INCLUDING REPLACEMENT OF STEEL LINTEL AND REMOVAL AND REPLACEMENT OF FACE BRICK. ALL WORK PER PROPOSED PLAN S… |
| X08049231 ↗ | 155 E MOSHOLU PARKWAY N BRONX | Alteration | Permit Issued | 12/15/2022 | 11/30/2023 | Design C2B ARCHITECTS PC | APPLICATION FILED FOR FACADE REPAIRS TO ADDRESS ECB AND DOB VIOLATIONS AS NOTED ABOVE. |
| X00944296 ↗ | 3510 BAINBRIDGE AVENUE BRONX | Alteration | Permit Issued | 10/10/2023 | 11/17/2023 | Design METRO STRUCTURES Filer PINNACLE BUILDING CON | APPLICATION IS FOR FILED FOR THE REMOVAL OF EXTERIOR FINISH INSTALLED AT 1 FLOOR MEDICAL OFFICE UNDER APPLICATION X00609429-I1. RESTORATION … |
| X00804970 ↗ | 764 TINTON AVENUE BRONX | Alteration | Signed-off | 12/28/2022 | 09/06/2023 | Design OZAETA ENGINEERING, PLLC Filer H DESIGN STUDIO INC | EMERGENCY SHORING OF THE NORTH AND SOUTH EXISTING FREE STANDING AND RETAINING WALLS. NO CHANGE IN USE EGRESS OR OCCUPANCY. |
| 123763640BIS | 318 PLEASANT AVENUE MANHATTAN | — | ISSUED | 05/14/2019 | 06/18/2019 | — | OT |
| 123278997BIS | 31 CROSBY STREET MANHATTAN | — | ISSUED | 05/04/2018 | 05/04/2018 | — | OT |
| 123275874BIS | 245 3 AVENUE MANHATTAN | — | ISSUED | 04/12/2018 | 04/12/2018 | — | OT |
| 123275883BIS | 234 8 AVENUE MANHATTAN | — | ISSUED | 04/12/2018 | 04/12/2018 | — | OT |
| 220148702BIS | 2129 CROTONA AVENUE BRONX | — | ISSUED | 03/12/2014 | 03/12/2014 | — | OT |
| Building | Filings | Most Recent |
|---|---|---|
| 3510 BAINBRIDGE AVENUE ↗ | 1 | 07/08/2026 |
| 329 EAST 197 STREET ↗ | 1 | 07/08/2026 |
| 155 E MOSHOLU PARKWAY N ↗ | 3 | 03/21/2026 |
| 764 TINTON AVENUE ↗ | 3 | 03/21/2026 |