| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01435222 ↗ | 173 GRAND STREET MANHATTAN | Alteration | Signed-off | 07/23/2026 | 07/29/2026 | Design POLAR ENGINEERING, P.C. Owner 122 Mott Realty | PENTHOUSE ROOF TERRACE WATERPROOFING REPAIR. INSTALL NEW WATERPROOFING MEMBRANE OVER EXISTING ROOF MEMBRANE. NO CHANGE TO USE, EGRESS, OR OC… |
| M01365475 ↗ | 18 WEST 25 STREET MANHATTAN | Alteration | Signed-off | 03/12/2026 | 04/24/2026 | Design POLAR ENGINEERING, P.C. | BRICK REPOINTING, REPLACEMENT OF CRACKED/SPALLED BRICK, STONE REPOINTING, REPLACEMENT OF CRACKED/SPALLED STONE. SCRAP, PRIME AND PAINT ON ST… |
| M01354179 ↗ | 122 MOTT STREET MANHATTAN | Alteration | Signed-off | 02/11/2026 | 03/11/2026 | Design ZHENG ENGINEERING PLLC Owner 122 Mott Realty | ALTERATION TO RENOVATE THE EXISTING 6th FLOOR OFFICE SPACE UNIT 604. NEW AND TO REPLACE PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY OR EG… |
| M01156000 ↗ | 89 MULBERRY STREET MANHATTAN | Alteration | Signed-off | 12/16/2024 | 10/24/2025 | Design EMPIRE DESIGN CORP | APPLICATION FILE FOR FACADE REPAIR WORK AS PER PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. |
| B01226264 ↗ | 252 MADISON STREET BROOKLYN | Alteration | Permit Issued | 07/08/2025 | 07/16/2025 | Design EMPIRE DESIGN CORP | APPLICATION FILE FOR STUCCO REPAIR WORK AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. |
| B01208649 ↗ | 402 85 STREET BROOKLYN | Alteration | Permit Issued | 04/10/2025 | 04/28/2025 | Design EMPIRE DESIGN CORP | APPLICATION FILE FOR ROOF REPLACEMENT WORK AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. |
| Name | Projects together | Most recent |
|---|---|---|
| EMPIRE DESIGN CORP | 3 | 07/08/2025 |
| POLAR ENGINEERING, P.C. | 2 | 07/23/2026 |
| ZHENG ENGINEERING PLLC | 1 | 02/11/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| PLUMB-IT MECHANICAL INC | 1 | 02/11/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| 122 Mott Realty | 2 | 07/23/2026 |
| SKYWAY RESTORATION & CONTRACTING CO | 1 | 04/10/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01435222 ↗ | 173 GRAND STREET MANHATTAN | Alteration | Signed-off | 07/23/2026 | 07/29/2026 | Design POLAR ENGINEERING, P.C. Owner 122 Mott Realty | PENTHOUSE ROOF TERRACE WATERPROOFING REPAIR. INSTALL NEW WATERPROOFING MEMBRANE OVER EXISTING ROOF MEMBRANE. NO CHANGE TO USE, EGRESS, OR OC… |
| M01365475 ↗ | 18 WEST 25 STREET MANHATTAN | Alteration | Signed-off | 03/12/2026 | 04/24/2026 | Design POLAR ENGINEERING, P.C. | BRICK REPOINTING, REPLACEMENT OF CRACKED/SPALLED BRICK, STONE REPOINTING, REPLACEMENT OF CRACKED/SPALLED STONE. SCRAP, PRIME AND PAINT ON ST… |
| M01354179 ↗ | 122 MOTT STREET MANHATTAN | Alteration | Signed-off | 02/11/2026 | 03/11/2026 | Design ZHENG ENGINEERING PLLC Owner 122 Mott Realty | ALTERATION TO RENOVATE THE EXISTING 6th FLOOR OFFICE SPACE UNIT 604. NEW AND TO REPLACE PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY OR EG… |
| M01156000 ↗ | 89 MULBERRY STREET MANHATTAN | Alteration | Signed-off | 12/16/2024 | 10/24/2025 | Design EMPIRE DESIGN CORP | APPLICATION FILE FOR FACADE REPAIR WORK AS PER PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. |
| B01226264 ↗ | 252 MADISON STREET BROOKLYN | Alteration | Permit Issued | 07/08/2025 | 07/16/2025 | Design EMPIRE DESIGN CORP | APPLICATION FILE FOR STUCCO REPAIR WORK AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. |
| B01208649 ↗ | 402 85 STREET BROOKLYN | Alteration | Permit Issued | 04/10/2025 | 04/28/2025 | Design EMPIRE DESIGN CORP | APPLICATION FILE FOR ROOF REPLACEMENT WORK AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. |
| Building | Filings | Most Recent |
|---|---|---|
| 173 GRAND STREET ↗ | 1 | 07/30/2026 |
| 18 WEST 25 STREET ↗ | 1 | 07/08/2026 |
| 402 85 STREET ↗ | 1 | 07/08/2026 |
| 122 MOTT STREET ↗ | 1 | 04/09/2026 |
| 252 MADISON STREET ↗ | 1 | 04/09/2026 |
| 89 MULBERRY STREET ↗ | 3 | 03/21/2026 |