| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01317185 ↗ | 292 GRAND STREET BROOKLYN | Alteration | Permit Issued | 11/13/2025 | 09/22/2026 | Design KUSHNER STUDIOS Filer KUSHNER STUDIOS | INSTALLATION OF SPLIT HVAC SYSTEMS ALONG WITH ASSOCIATED DUCTWORK & PIPING AS PER THE DRAWINGS FILED HEREIN. |
| M01332506 ↗ | 112 EAST 4 STREET MANHATTAN | Alteration | Permit Issued | 12/22/2025 | 09/10/2026 | Design ADAL ENGINEERING PLLC Filer ADAL ENGINEERING PLLC | REPLACEMENT OF EXISTING SPRINKLER SYSTEM WITH NEW AS PER PLAN IN CELLAR AND 1ST FLOOR. |
| M01334392 ↗ | 96 ORCHARD STREET MANHATTAN | Alteration | Permit Issued | 01/28/2026 | 07/01/2026 | Design CLIP ARCHITECTS Owner S&H EQUITIES (NY) INC. | Propose plumbing work at partial Basement commercial space of existing mixed use building as per plan. No change in use, egress, or occupanc… |
| M01170905 ↗ | 111 4 AVENUE MANHATTAN | Alteration | Permit Issued | 03/31/2025 | 02/10/2026 | Design JORGE I AGUIRRE, P.E. | PROPOSED RENOVATION OF AN EXISTING RESIDENTIAL UNIT 4D ON THE 4th FLOOR OF AN EXISTING RESIDENTIAL, 13-STORY BUILDING. NO CHANGE IN USE, EGR… |
| B01221499 ↗ | 810 EAST 49 STREET BROOKLYN | Alteration | Permit Issued | 05/09/2025 | 02/02/2026 | Design ROGER WILLIAMS, PE Filer ROGER WILLIAMS PE | INSTALL PLUMBING FIXTURES IN COMMERCIAL KITCHEN IN HOUSE OF WORSHIP. NO CHANGE TO USE EGRESS,OR OCCUPANCY |
| X01164401 ↗ | 4759 HENRY HUDSON PKWY W BRONX | Alteration | Signed-off | 01/27/2025 | 08/20/2025 | Design PRUDON & PARTNERS LLP | Interior renovation to auditorium to create an additional class room as per plans filed herewith. No change in use, egress or occupancy. |
| Name | Projects together | Most recent |
|---|---|---|
| KUSHNER STUDIOS | 8 | 08/21/2026 |
| SOHAIL HUMAYUN P E INC | 2 | 05/05/2025 |
| ADAL ENGINEERING PLLC | 1 | 08/03/2026 |
| ALNOUR CONSULTING | 1 | 01/20/2025 |
| CLIP ARCHITECTS | 1 | 01/30/2026 |
| JO ARCHITECTURE PLLC | 1 | 09/27/2023 |
| JORGE I AGUIRRE, P.E. | 1 | 02/10/2026 |
| MMO STUDIO INC | 1 | 03/13/2024 |
| PRUDON & PARTNERS LLP | 1 | 01/27/2025 |
| ROGER WILLIAMS, PE | 1 | 08/19/2025 |
| STRUCTURAL ENGINEERING INTEGRATED | 1 | 08/03/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| PREMIER FLOW PLBG AND HTG | 5 | 08/21/2026 |
| FIRE ZONE VENTILATION & S | 3 | 08/19/2025 |
| APOLLO PLBG & HTG INC | 1 | 02/10/2026 |
| DIRNO CORPORATION | 1 | 10/31/2023 |
| J. CAIAZZO PLBG & HTG COR | 1 | 10/05/2022 |
| JOE PARZIALE PLUMBING CO | 1 | 10/31/2023 |
| NEW AGE PLUMBING MECHANIC | 1 | 08/19/2025 |
| PIPE RITE CORP | 1 | 10/31/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| HAPPIER | 1 | 09/05/2024 |
| RIVERDALE PRESBYTERIAN CHURCH | 1 | 01/27/2025 |
| S&H EQUITIES (NY) INC. | 1 | 01/30/2026 |
| SABET DEVELOPMENT CORP | 1 | 05/05/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| KUSHNER STUDIOS | 7 | 08/21/2026 |
| ADAL ENGINEERING PLLC | 1 | 08/03/2026 |
| BMB BUILDING CONSULTING INC. | 1 | 01/20/2025 |
| K & M DOB CONSULTING CORP. | 1 | 09/27/2023 |
| MODERN BUILDING CONSULTANT | 1 | 01/30/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 01/27/2025 |
| ROGER WILLIAMS PE | 1 | 08/19/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01317185 ↗ | 292 GRAND STREET BROOKLYN | Alteration | Permit Issued | 11/13/2025 | 09/22/2026 | Design KUSHNER STUDIOS Filer KUSHNER STUDIOS | INSTALLATION OF SPLIT HVAC SYSTEMS ALONG WITH ASSOCIATED DUCTWORK & PIPING AS PER THE DRAWINGS FILED HEREIN. |
| M01332506 ↗ | 112 EAST 4 STREET MANHATTAN | Alteration | Permit Issued | 12/22/2025 | 09/10/2026 | Design ADAL ENGINEERING PLLC Filer ADAL ENGINEERING PLLC | REPLACEMENT OF EXISTING SPRINKLER SYSTEM WITH NEW AS PER PLAN IN CELLAR AND 1ST FLOOR. |
| M01334392 ↗ | 96 ORCHARD STREET MANHATTAN | Alteration | Permit Issued | 01/28/2026 | 07/01/2026 | Design CLIP ARCHITECTS Owner S&H EQUITIES (NY) INC. | Propose plumbing work at partial Basement commercial space of existing mixed use building as per plan. No change in use, egress, or occupanc… |
| M01170905 ↗ | 111 4 AVENUE MANHATTAN | Alteration | Permit Issued | 03/31/2025 | 02/10/2026 | Design JORGE I AGUIRRE, P.E. | PROPOSED RENOVATION OF AN EXISTING RESIDENTIAL UNIT 4D ON THE 4th FLOOR OF AN EXISTING RESIDENTIAL, 13-STORY BUILDING. NO CHANGE IN USE, EGR… |
| B01221499 ↗ | 810 EAST 49 STREET BROOKLYN | Alteration | Permit Issued | 05/09/2025 | 02/02/2026 | Design ROGER WILLIAMS, PE Filer ROGER WILLIAMS PE | INSTALL PLUMBING FIXTURES IN COMMERCIAL KITCHEN IN HOUSE OF WORSHIP. NO CHANGE TO USE EGRESS,OR OCCUPANCY |
| X01164401 ↗ | 4759 HENRY HUDSON PKWY W BRONX | Alteration | Signed-off | 01/27/2025 | 08/20/2025 | Design PRUDON & PARTNERS LLP | Interior renovation to auditorium to create an additional class room as per plans filed herewith. No change in use, egress or occupancy. |
| M01060986 ↗ | 92 2 AVENUE MANHATTAN | Alteration | Signed-off | 07/08/2024 | 01/30/2025 | Design KUSHNER STUDIOS Owner SABET DEVELOPMENT CORP Filer KUSHNER STUDIOS | INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE INCLUDING THE INSTALLATION OF NON-LOAD BEARING WALLS, FLOOR & WALL FINISHES AS PER THE DRAW… |
| B00904534 ↗ | 4201 7 AVENUE BROOKLYN | Alteration | Signed-off | 07/26/2023 | 07/17/2024 | Design KUSHNER STUDIOS Filer KUSHNER STUDIOS | NEW SPLIT HVAC SYSTEMS WITH ASSOCIATED DUCTWORK & PIPING AS PER THE DRAWINGS FILED HEREIN. |
| M01006637 ↗ | 332 WEST 86 STREET MANHATTAN | Alteration | Signed-off | 03/13/2024 | 07/02/2024 | Design MMO STUDIO INC | Herewith filed alteration application for minor interior renovations to apartment 8B. Work to include general construction & finishes; no ch… |
| B00962780 ↗ | 53 SCOTT AVENUE BROOKLYN | Alteration | Signed-off | 12/20/2023 | 05/01/2024 | Design KUSHNER STUDIOS Owner HAPPIER Filer KUSHNER STUDIOS | TENANT FINISH FITOUT OF EXISTING MERCANTILE SPACE USE GROUP 6 AS PER NB #321588796 INCLUDING NEW FLOOR AND WALL FINISHES AND A NEW PREP AREA… |
| M00877402 ↗ | 111 4 AVENUE MANHATTAN | Alteration | Signed-off | 06/09/2023 | 12/12/2023 | Design ALNOUR CONSULTING | PROPOSE COMBINE UNITS FOR APART# 8D &8E AS PER TPPN 3-97. REPLACEMENT OFEXISTING KITCHEN WITH NEWBATHROOM; RELOCATION OF NON BEARINGBEARINGP… |
| M08033027 ↗ | 419 WEST 22 STREET MANHATTAN | Alteration | Signed-off | 11/17/2022 | 08/22/2023 | Design JO ARCHITECTURE PLLC | INTERIOR RENOVATION OF EXISTING APARTMENT UNIT #2 INCLUDING REMOVAL AND INSTALLATION OF PARTITIONS, AND MINOR CARPENTRY WORK. NO CHANGE IN U… |
| B08028622 ↗ | 674 MANHATTAN AVENUE BROOKLYN | Alteration CO | Permit Issued | 12/07/2022 | 04/07/2023 | Design KUSHNER STUDIOS Filer KUSHNER STUDIOS | APPLICATION FILED HEREIN TO ACCESSORY OUTDOOR SEATING IN THE REAR YARD IN CONJUNCTION WITH THE EXISTING EATING AND DRINKING ESTABLISHMENT (C… |
| B00805245 ↗ | 4201 7 AVENUE BROOKLYN | Alteration | Signed-off | 01/12/2023 | 04/04/2023 | Design KUSHNER STUDIOS Filer KUSHNER STUDIOS | INTERIOR COMM RENO FILED HEREIN TO REMOVE ALL EXISTING COUNTERTOPS, FLOOR & WALL FINISHES, COMMERCIAL COOKING EQUIPMENT, AND REMOVE EXISTING… |
| B00735693 ↗ | 94 FRANKLIN STREET BROOKLYN | Alteration CO | Permit Issued | 06/20/2022 | 02/24/2023 | Design KUSHNER STUDIOS Filer KUSHNER STUDIOS | INSTALLATION OF PLUMBING FIXTURES & COMMERCIAL COOKING EQUIPMENT TO RESOLVE ECB VIOLATION #39055125P AND DEP VIOLATION #E71337 |
| 340728378BIS | 524 MANHATTAN AVENUE BROOKLYN | — | ISSUED | 07/20/2022 | 07/20/2022 | — | OT |
| B00543392 ↗ | 180 FRANKLIN STREET BROOKLYN | Alteration | Signed-off | 08/24/2021 | 07/07/2022 | Design KUSHNER STUDIOS | INTERIOR RENOVATION OF AN EXISTING EATING AND DRINKING ESTABLISHMENT INCLUDING NEW NON-LOAD BEARING PARTITIONS, DOORS, FLOOR, AND WALL FINIS… |
| Building | Filings | Most Recent |
|---|---|---|
| 292 GRAND STREET ↗ | 3 | 09/23/2026 |
| 112 EAST 4 STREET ↗ | 3 | 07/08/2026 |
| 180 FRANKLIN STREET ↗ | 10 | 07/08/2026 |
| 419 WEST 22 STREET ↗ | 4 | 07/08/2026 |
| 332 WEST 86 STREET ↗ | 1 | 07/08/2026 |
| 53 SCOTT AVENUE ↗ | 1 | 07/08/2026 |
| 4201 7 AVENUE ↗ | 5 | 07/08/2026 |
| 111 4 AVENUE ↗ | 5 | 07/08/2026 |
| 96 ORCHARD STREET ↗ | 2 | 07/08/2026 |
| 810 EAST 49 STREET ↗ | 1 | 04/09/2026 |
| 4759 HENRY HUDSON PKWY W ↗ | 1 | 04/09/2026 |
| 94 FRANKLIN STREET ↗ | 3 | 03/21/2026 |
| 674 MANHATTAN AVENUE ↗ | 3 | 03/21/2026 |
| 92 2 AVENUE ↗ | 3 | 03/21/2026 |