| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B08019173 ↗ | 25 2 STREET BROOKLYN | Alteration | Signed-off | 11/04/2022 | 05/15/2025 | Design RJD ENGINEERING LLC | INSTALLATION OF NEW MECHANICAL HEATING AND COOLING SYSTEM. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| B08018805 ↗ | 25 2 STREET BROOKLYN | Alteration CO | Permit Issued | 11/04/2022 | 03/17/2025 | Design CWB ARCHITECTS | Conversion of 3-family home to single family home. Interior & Exterior renovation; replacement of rear masonry wall with new openings propos… |
| M00769399 ↗ | 170 DUANE STREET MANHATTAN | Alteration | Signed-off | 09/06/2022 | 04/19/2024 | Design ZIMMERMAN WORKSHOP | RENOVATION OF 6TH AND PENTHOUSE FLOOR WINDOWS INCLUDING REMOVAL, ENLARGEMENT OF OPENINGS, AND INSTALLATION OF NEW WINDOWS AS PER PLANS. NO C… |
| B00851456 ↗ | 126 STRATFORD ROAD BROOKLYN | Alteration | Signed-off | 05/03/2023 | 03/28/2024 | Design ZIMMERMAN WORKSHOP | INTERIOR RENOVATION OF CELLAR THROUGH 3RD FLOORS INCLUDING REMOVAL AND INSTALLATION OF PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR… |
| B00994743 ↗ | 25 2 STREET BROOKLYN | Alteration | Signed-off | 01/25/2024 | 01/26/2024 | Design CWB ARCHITECTS | Installation of a construction fence for a single family home. No change to use, occupancy or egress. |
| B08019764 ↗ | 25 2 STREET BROOKLYN | Alteration | Signed-off | 12/14/2022 | 11/21/2023 | Design MARTOS ENGINEERING | FOUNDATION WORK PROPOSED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| Name | Projects together | Most recent |
|---|---|---|
| ZIMMERMAN WORKSHOP | 5 | 05/03/2023 |
| MARTOS ENGINEERING | 3 | 04/16/2024 |
| CWB ARCHITECTS | 2 | 11/05/2025 |
| BEN ROSENBLUM STUDIO ARCHITECTURE P | 1 | 03/02/2022 |
| CHRISTOPHER TEETER | 1 | 01/20/2022 |
| HAMANN ENGINEERING, PLLC | 1 | 03/25/2020 |
| LEVEL EIGHT ARCHITECTURE DESIGN | 1 | 10/07/2022 |
| RJD ENGINEERING LLC | 1 | 02/14/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| J. CALLAHAN CONSULTING, INC. | 6 | 11/05/2025 |
| BIG ORANGE EXPEDITING, INC | 1 | 03/02/2022 |
| CHRISTOPHER TEETER,RA | 1 | 01/20/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B08019173 ↗ | 25 2 STREET BROOKLYN | Alteration | Signed-off | 11/04/2022 | 05/15/2025 | Design RJD ENGINEERING LLC | INSTALLATION OF NEW MECHANICAL HEATING AND COOLING SYSTEM. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| B08018805 ↗ | 25 2 STREET BROOKLYN | Alteration CO | Permit Issued | 11/04/2022 | 03/17/2025 | Design CWB ARCHITECTS | Conversion of 3-family home to single family home. Interior & Exterior renovation; replacement of rear masonry wall with new openings propos… |
| M00769399 ↗ | 170 DUANE STREET MANHATTAN | Alteration | Signed-off | 09/06/2022 | 04/19/2024 | Design ZIMMERMAN WORKSHOP | RENOVATION OF 6TH AND PENTHOUSE FLOOR WINDOWS INCLUDING REMOVAL, ENLARGEMENT OF OPENINGS, AND INSTALLATION OF NEW WINDOWS AS PER PLANS. NO C… |
| B00851456 ↗ | 126 STRATFORD ROAD BROOKLYN | Alteration | Signed-off | 05/03/2023 | 03/28/2024 | Design ZIMMERMAN WORKSHOP | INTERIOR RENOVATION OF CELLAR THROUGH 3RD FLOORS INCLUDING REMOVAL AND INSTALLATION OF PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR… |
| B00994743 ↗ | 25 2 STREET BROOKLYN | Alteration | Signed-off | 01/25/2024 | 01/26/2024 | Design CWB ARCHITECTS | Installation of a construction fence for a single family home. No change to use, occupancy or egress. |
| B08019764 ↗ | 25 2 STREET BROOKLYN | Alteration | Signed-off | 12/14/2022 | 11/21/2023 | Design MARTOS ENGINEERING | FOUNDATION WORK PROPOSED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| B08032999 ↗ | 25 2 STREET BROOKLYN | Alteration | Signed-off | 12/13/2022 | 11/21/2023 | Design MARTOS ENGINEERING | Earthwork related to front areaway improvements for single-family dwelling. No change of use, occupancy or egress. |
| B08019154 ↗ | 25 2 STREET BROOKLYN | Alteration | Signed-off | 11/09/2022 | 09/28/2023 | Design MARTOS ENGINEERING | Structural work proposed for a single family home. No change to use, occupancy or egress. |
| Q08005054 ↗ | 67-38 INGRAM STREET QUEENS | Alteration | Signed-off | 10/07/2022 | 04/22/2023 | Filing application for renovation of existing bathrooms and Installation of new kitchen exhaust. in existing 1 family dwelling. All work as … | |
| M00666445 ↗ | 170 DUANE STREET MANHATTAN | Alteration | Signed-off | 04/04/2022 | 03/07/2023 | Design ZIMMERMAN WORKSHOP | INTERIOR RENOVATION OF 5TH, 6TH, AND PENTHOUSE FLOORS INCLUDING REMOVAL AND INSTALLATION OF PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRES… |
| M08048981 ↗ | 106 CENTRAL PARK SOUTH MANHATTAN | Alteration | Signed-off | 12/06/2022 | 03/07/2023 | Design ZIMMERMAN WORKSHOP | INTERIOR RENOVATION OF UNIT 26A INCLUDING REMOVAL AND INSTALLATION OF PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B00670998 ↗ | 368 GATES AVE BROOKLYN | Alteration | Signed-off | 03/02/2022 | 04/22/2022 | NEW STORAGE ROOM ON CELLAR LEVEL. EXISTING POWDER ROOM ON CELLAR LEVEL INCLUDING MOP SINK. EXISTING SLOP SINK. NO CHANGE TO EGRESS, OCCUPANC… | |
| M00480253 ↗ | 2 5 AVENUE MANHATTAN | Alteration | Permit Issued | 08/27/2021 | 02/09/2022 | Design CHRISTOPHER TEETER Filer CHRISTOPHER TEETER,RA | INTERIOR RENOVATION, SEE PLANS. |
| B00555869 ↗ | 330 BOND STREET BROOKLYN | Alteration CO | Permit Issued | 08/11/2021 | 10/18/2021 | Design ZIMMERMAN WORKSHOP | FILING FOR CONVERSION FROM A TWO FAMILY HOME TO A ONE FAMILY HOME. DEMOLITION AND INSTALLATION OF INTERIOR NON-STRUCTURAL PARTITIONS AND ASS… |
| 321978650BIS | 61 GREEN STREET BROOKLYN | — | ISSUED | 10/27/2020 | 03/18/2021 | — | OT |
| 340764284BIS | 502 LORIMER STREET BROOKLYN | — | ISSUED | 09/23/2020 | 03/18/2021 | — | OT |
| 322008527BIS | 305 UNION AVNUE BROOKLYN | — | ISSUED | 08/19/2020 | 08/19/2020 | — | OT |
| 320593210BIS | 305 UNION AVNUE BROOKLYN | — | ISSUED | 04/23/2015 | 06/08/2020 | — | EQ, PL |
| B00260625 ↗ | 42 SEELEY STREET BROOKLYN | Alteration | Signed-off | 11/13/2019 | 12/05/2019 | Design HAMANN ENGINEERING, PLLC | INSTALLATION OF THE MECHANICAL SYSTEM IN CONJUNCTION WITH JOB #321700290 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY… |
| Building | Filings | Most Recent |
|---|---|---|
| 25 2 STREET ↗ | 22 | 07/08/2026 |
| 170 DUANE STREET ↗ | 12 | 07/08/2026 |
| 67-38 INGRAM STREET ↗ | 4 | 07/08/2026 |
| 106 CENTRAL PARK SOUTH ↗ | 4 | 07/08/2026 |
| 2 5 AVENUE ↗ | 5 | 07/08/2026 |
| 126 STRATFORD ROAD ↗ | 7 | 07/08/2026 |
| 368 GATES AVE ↗ | 1 | 07/08/2026 |
| 330 BOND STREET ↗ | 1 | 07/08/2026 |
| 42 SEELEY STREET ↗ | 3 | 03/21/2026 |