| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01260501 ↗ | 530 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 08/26/2025 | 02/25/2026 | Design M.A. RUBIANO, P.E., P.C. | Renovation of an existing apartment #8BB on the 8th Floor. Work include non-structural demolition and general construction as per plans file… |
| M01082434 ↗ | 644 GREENWICH STREET MANHATTAN | Alteration | Signed-off | 07/25/2024 | 01/28/2026 | Design STUDIO VURAL | PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH. DESIGN #M01082434-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01084719 ↗ | 177 9 AVENUE MANHATTAN | Alteration | Signed-off | 09/27/2024 | 01/28/2026 | Design M.A. RUBIANO, P.E., P.C. Owner LAKA Corp | REMOVE AND REPLACE AT NEW LOCATION DUCTWORK OF AN EXISTING AC UNIT |
| M01154257 ↗ | 249 EAST 61 STREET MANHATTAN | Alteration | Signed-off | 12/23/2024 | 08/07/2025 | Design STUDIO VURAL Owner Boutique John Paul Corp. | PROPOSE PLUMBING WORKS IN CONJUNCTION WITH GENERAL CONSTRUCTION #M01154257-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01179045 ↗ | 80 GOLD STREET MANHATTAN | Alteration | Signed-off | 04/17/2025 | 05/05/2025 | Design JIAN ENGINEERING PLLC | MINOR INTERIOR RENOVATION ON 27TH FLOOR FOR APT#27F.TO INSTALL VINYL PLANK FLOORING OVER EXIST.HARDWOOD FLOOR, AND ENLARGE BATHROOM WALL,TO … |
| M01153718 ↗ | 409 GRAND STREET MANHATTAN | Alteration | Signed-off | 12/11/2024 | 03/18/2025 | Design ARC CONSULTING ENGINEERS Filer JRK CREATIVE INC | INTERIOR RENOVATION OF APT#C1605 ON 16TH FLOOR,REMOVE NON LOAD BEARING WALL AND REFINISH EXIST.HARDWOOD FLOOR.PLUMBING WORK WILL BE FILED SE… |
| Name | Projects together | Most recent |
|---|---|---|
| ALLEN SHINFELD, P.E. PLLC | 3 | 02/26/2024 |
| JIAN ENGINEERING PLLC | 3 | 02/06/2026 |
| ARC CONSULTING ENGINEERS | 2 | 12/11/2024 |
| BRIAN MESSANA ARCHITECT, PLLC | 2 | 08/04/2026 |
| DHD ARCHITECTURE DESIGN PLLC | 2 | 04/06/2021 |
| M.A. RUBIANO, P.E., P.C. | 2 | 08/04/2026 |
| STUDIO VURAL | 2 | 04/22/2026 |
| CHRISTINA HALATSIS DESIGN | 1 | 05/24/2022 |
| GEA CONSULTING ENGINEERS | 1 | 05/24/2022 |
| IP GROUP | 1 | 09/17/2020 |
| LINEA LLP | 1 | 06/23/2025 |
| PAUL SCOTT, ARCHITECT PC | 1 | 01/15/2025 |
| PROJECT TACTICAL SOLUTIONS, LLC | 1 | 06/03/2021 |
| SEAL ENGINEERING PC | 1 | 06/10/2024 |
| ST ENGINEERING SERVICES LLP | 1 | 04/05/2023 |
| TSF ENGINEERING, PC | 1 | 01/09/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| LG ELITE PLUMBING INC | 3 | 03/25/2026 |
| ALL PRO PLBG & HTG INC | 1 | 04/22/2026 |
| MKNK WASTE REMOVAL INC | 1 | 04/22/2026 |
| NEW YORK PARK PLBG&HTG CO | 1 | 08/04/2026 |
| PEAK FIRE PROTECTION LLC | 1 | 05/24/2022 |
| PEAK MECHANICAL SOLUTION* | 1 | 05/24/2022 |
| PEAK PLUMBING SOLUTIONS L | 1 | 05/24/2022 |
| RRP PLUMBING CORP | 1 | 03/25/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| 14 EAST 75TH STREET, INC. | 1 | 12/03/2024 |
| Boutique John Paul Corp. | 1 | 04/22/2026 |
| CALENDULA REALTY | 1 | 02/26/2024 |
| LAKA Corp | 1 | 03/25/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| JRK CREATIVE INC | 5 | 12/11/2024 |
| WILLIAM VITACCO ASSOCIATES | 3 | 06/23/2025 |
| AGOUTI CONSTRUCTION CONSULTING | 2 | 08/04/2026 |
| BMB BUILDING CONSULTING INC. | 2 | 04/22/2026 |
| CLARKE CONSTRUCTION CONSULTANTS | 1 | 01/15/2025 |
| DHD ARCHITECTURE, PC | 1 | 02/17/2021 |
| EPAC BUILDING CONSULTING INC | 1 | 05/24/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01260501 ↗ | 530 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 08/26/2025 | 02/25/2026 | Design M.A. RUBIANO, P.E., P.C. | Renovation of an existing apartment #8BB on the 8th Floor. Work include non-structural demolition and general construction as per plans file… |
| M01082434 ↗ | 644 GREENWICH STREET MANHATTAN | Alteration | Signed-off | 07/25/2024 | 01/28/2026 | Design STUDIO VURAL | PROPOSE PLUMBING WORK IN CONJUNCTION WITH ARCH. DESIGN #M01082434-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01084719 ↗ | 177 9 AVENUE MANHATTAN | Alteration | Signed-off | 09/27/2024 | 01/28/2026 | Design M.A. RUBIANO, P.E., P.C. Owner LAKA Corp | REMOVE AND REPLACE AT NEW LOCATION DUCTWORK OF AN EXISTING AC UNIT |
| M01154257 ↗ | 249 EAST 61 STREET MANHATTAN | Alteration | Signed-off | 12/23/2024 | 08/07/2025 | Design STUDIO VURAL Owner Boutique John Paul Corp. | PROPOSE PLUMBING WORKS IN CONJUNCTION WITH GENERAL CONSTRUCTION #M01154257-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01179045 ↗ | 80 GOLD STREET MANHATTAN | Alteration | Signed-off | 04/17/2025 | 05/05/2025 | Design JIAN ENGINEERING PLLC | MINOR INTERIOR RENOVATION ON 27TH FLOOR FOR APT#27F.TO INSTALL VINYL PLANK FLOORING OVER EXIST.HARDWOOD FLOOR, AND ENLARGE BATHROOM WALL,TO … |
| M01153718 ↗ | 409 GRAND STREET MANHATTAN | Alteration | Signed-off | 12/11/2024 | 03/18/2025 | Design ARC CONSULTING ENGINEERS Filer JRK CREATIVE INC | INTERIOR RENOVATION OF APT#C1605 ON 16TH FLOOR,REMOVE NON LOAD BEARING WALL AND REFINISH EXIST.HARDWOOD FLOOR.PLUMBING WORK WILL BE FILED SE… |
| M01146790 ↗ | 950 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 12/03/2024 | 01/27/2025 | Design JIAN ENGINEERING PLLC Filer JRK CREATIVE INC | INTERIOR RENOVATION FOR APT #7C ON 7TH FLOOR .PARTITION ELECRICAL AND PLUMBING WORK ARE INVOLVED.NO CHANGE TO USE,EGRESS & OCCUPANCY. |
| M01089894 ↗ | 205 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 09/12/2024 | 01/09/2025 | Design PAUL SCOTT, ARCHITECT PC | PLUMBING WORK FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE OCCUPANCY OR EGRESS. |
| M01008293 ↗ | 306 EAST 81 STREET MANHATTAN | Alteration | Signed-off | 02/26/2024 | 03/13/2024 | Design ALLEN SHINFELD, P.E. PLLC Owner CALENDULA REALTY Filer JRK CREATIVE INC | INTERIOR RENOVATION FOR EATING & DRINKING ESTABLISHMENT ON BASEMENT.PARTITION AND MECHANICAL WORK INVOLVED.NO CHANGE IN USE.EGRESS OR OCCUPA… |
| M00844446 ↗ | 128 JANE STREET MANHATTAN | Alteration | Permit Issued | 04/05/2023 | 09/07/2023 | Design ST ENGINEERING SERVICES LLP | Mechanical work as shown on the plans. |
| M00848223 ↗ | 128 JANE STREET MANHATTAN | Alteration | Permit Issued | 04/10/2023 | 08/29/2023 | Design LINEA LLP | Interior buildout of existing apartment, as well as, replacement of stairs and installation of a small bulk head on the roof. No change to u… |
| M00850661 ↗ | 128 JANE STREET MANHATTAN | Alteration | Signed-off | 04/06/2023 | 08/29/2023 | Design SEAL ENGINEERING PC | Structural work as shown on plans. |
| 321791888BIS | 9302 4 AVENUE BROOKLYN | — | ISSUED | 08/06/2018 | 07/11/2023 | — | PL |
| M00780712 ↗ | 128 JANE STREET MANHATTAN | Alteration | Signed-off | 08/11/2022 | 05/25/2023 | Design ALLEN SHINFELD, P.E. PLLC Filer JRK CREATIVE INC | INTERIOR RENOVATION FOR APARTMENT #4B.NO CHANGE IN OCCUPANCY,USE,EGRESS OR BULK. |
| 340698016BIS | 9302 4 AVENUE BROOKLYN | — | ISSUED | 09/25/2019 | 05/18/2023 | — | OT |
| M00768611 ↗ | 28 BOWERY MANHATTAN | Alteration | Permit Issued | 07/21/2022 | 09/20/2022 | Design JIAN ENGINEERING PLLC | FILES APPLICATION TO MODIFY EX.MECHANICAL SYSTEM AND INSTALL NEW MECHANICAL SYSTEM,NO CHANGE IN USE,EGRESS OR OCCUPANCY. |
| M00420424 ↗ | 128 JANE STREET MANHATTAN | Alteration | Signed-off | 02/17/2021 | 08/25/2022 | Design DHD ARCHITECTURE DESIGN PLLC Filer DHD ARCHITECTURE, PC | Reinforcing existing wood joists and installing new header along with installation of temporary shoring on the 5th and 6th floor apt 5/6B. S… |
| M00733196 ↗ | 1471 3 AVENUE MANHATTAN | Alteration | Signed-off | 06/07/2022 | 07/27/2022 | Design ALLEN SHINFELD, P.E. PLLC | MINOR RENOVATION FOR APARTMENT #14F. NO CHANGE IN OCCUPANCY, USE, EGRESS OR BULK. |
| M00269183 ↗ | 128 JANE STREET MANHATTAN | Alteration | Permit Issued | 01/09/2020 | 03/30/2022 | Design TSF ENGINEERING, PC Filer REDCUT EXPEDITING | FILING FOR MECHANICAL WORK TYPE IN CONJUNCTION WITH ALTERATION 2 M0026972 AND ALT 2 FOR INTERIOR RENOVATION. |
| M00528808 ↗ | 28 BOWERY MANHATTAN | Alteration | Signed-off | 06/03/2021 | 02/25/2022 | Filer JRK CREATIVE INC | INTERIOR RENOVATION FOR EXISTING RESTAURANT.PARTITION WORK ONLY,NO CHANGE IN USE,EGRESS OR OCCUPANCY. |
| M00615591 ↗ | 324 PEARL STREET MANHATTAN | Alteration | Permit Issued | 10/25/2021 | 02/10/2022 | Design GEA CONSULTING ENGINEERS | Subsequent Filing for plumbing and sprinkler works. |
| B00661544 ↗ | 5718 5 AVENUE BROOKLYN | Alteration | Signed-off | 01/20/2022 | 01/31/2022 | Design ARC CONSULTING ENGINEERS | FILE APPLICATION FOR EXISTING COMMERCIAL STORE RENOVATION ON 1ST FLOOR ,MECHANICAL AND PARTITION WORK INVOLVED,PLUMBING WORK FILE UNDER SEPA… |
| M00458980 ↗ | 128 JANE STREET MANHATTAN | Alteration | Signed-off | 04/06/2021 | 01/11/2022 | Design DHD ARCHITECTURE DESIGN PLLC | Installation of bulkhead and renovation of existing apartment on the 6th floor and roof. General construction. No change in use, occupancy o… |
| 123847579BIS | 128 JANE STREET MANHATTAN | — | ISSUED | 02/10/2020 | 01/30/2021 | — | OT |
| 140923357BIS | 1 EAST 66 STREET MANHATTAN | — | ISSUED | 08/18/2020 | 01/30/2021 | — | OT |
| M00229406 ↗ | 500 WEST 53 STREET MANHATTAN | Alteration | Signed-off | 09/30/2019 | 01/25/2021 | Design IP GROUP | MODIFICATION OF MECHANICAL SYSTEM, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| 123880238BIS | 500 WEST 53 STREET MANHATTAN | — | ISSUED | 02/07/2020 | 01/13/2021 | — | OT |
| 140931455BIS | 305 EAST 45 STREET MANHATTAN | — | ISSUED | 08/28/2020 | 08/28/2020 | — | OT |
| Building | Filings | Most Recent |
|---|---|---|
| 128 JANE STREET ↗ | 16 | 07/08/2026 |
| 644 GREENWICH STREET ↗ | 5 | 07/08/2026 |
| 205 WEST 57 STREET ↗ | 3 | 07/08/2026 |
| 28 BOWERY ↗ | 3 | 07/08/2026 |
| 177 9 AVENUE ↗ | 6 | 07/08/2026 |
| 500 WEST 53 STREET ↗ | 3 | 07/08/2026 |
| 80 GOLD STREET ↗ | 1 | 04/09/2026 |
| 530 WEST END AVENUE ↗ | 3 | 04/09/2026 |
| 249 EAST 61 STREET ↗ | 1 | 04/09/2026 |
| 950 MADISON AVENUE ↗ | 1 | 04/09/2026 |
| 324 PEARL STREET ↗ | 2 | 03/21/2026 |
| 306 EAST 81 STREET ↗ | 2 | 03/21/2026 |
| 409 GRAND STREET ↗ | 4 | 03/21/2026 |
| 5718 5 AVENUE ↗ | 2 | 03/21/2026 |
| 1471 3 AVENUE ↗ | 2 | 03/21/2026 |