| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01333117 ↗ | 299 WEST 12 STREET MANHATTAN | Alteration | Signed-off | 12/19/2025 | 03/18/2026 | Design CHEUNG SHOWMAN ARCHITECTS | IN UNIT 2D2 ON 2ND FLOOR, REMOVAL AND INSTALLATION OF NON-LOADBEARING PARTITIONS AS SHOWN ON PLANS. ALL PLUMBING WORK FILED UNDER SEPARATE A… |
| M01267407 ↗ | 682 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 08/22/2025 | 01/15/2026 | Design CHEUNG SHOWMAN ARCHITECTS Owner Apt 7 | INTERIOR RENOVATION OF UNIT 7, AT 7TH FLOOR. REMOVE AND INSTALL NON-LOADBEARING PARTITIONS. NEW FINISHES, LIGHTING THROUGHOUT. MINOR MECHANI… |
| B01248261 ↗ | 295 ST JOHNS PLACE BROOKLYN | Alteration | Signed-off | 06/30/2025 | 09/04/2025 | Design SGUERA ARCHITECTURE PLLC Owner EBMG LLC Filer LSD GROUP | KITCHEN RENOVATION WITH REMOVAL OF NON-LOAD BEARING PARTITIONS BETWEEN FOYER & CORRIDOR. RELOCATE ONE (1) SINK, ONE (1) DISHWASHER AND ONE (… |
| B01056656 ↗ | 513 DECATUR STREET BROOKLYN | Alteration | Signed-off | 06/03/2024 | 12/12/2024 | Design DEMO ARCHITECTURE, PLLC | New Steel Deck at Rear Yard. Remove existing rear window and enlarge opening at the sill to accommodate a new door. |
| M01081685 ↗ | 1230 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 07/18/2024 | 11/21/2024 | Design CHEUNG SHOWMAN ARCHITECTS | INTERIOR RENOVATION OF SUITE 2219 ON THE 22ND FLOOR. REMOVE AND INSTALL NON-LOADBEARING PARTITIONS AS SHWON ON PLANS. NO CHANGE TO EGRESS, U… |
| M01136266 ↗ | 20 WEST 72 STREET MANHATTAN | Alteration | Signed-off | 11/05/2024 | 11/21/2024 | Design CHEUNG SHOWMAN ARCHITECTS | NEW NON-LOADBEARING PARTITIONS AS SHOWN ON PLANS. ALL PLUMBING WORK FILED UNDER SEPARATE APPLICATION. NO CHANGE TO EGRESS, USE, OR OCCUPANCY… |
| Name | Projects together | Most recent |
|---|---|---|
| CHEUNG SHOWMAN ARCHITECTS | 5 | 12/19/2025 |
| CHRISTOPHER TEETER | 2 | 05/13/2024 |
| COMBINED ARCHITECTURE DPC | 2 | 08/16/2024 |
| DEMO ARCHITECTURE, PLLC | 1 | 06/03/2024 |
| EARTH FIRST CONSULTING | 1 | 12/07/2019 |
| HUSTVEDT CUTLER ARCHITECTS | 1 | 07/12/2024 |
| JACK GREEN ASSOCIATES | 1 | 01/23/2026 |
| JAG ENGINEERING, LLC | 1 | 05/26/2022 |
| L. NAOUM, P.E., P. C. | 1 | 07/12/2024 |
| SGUERA ARCHITECTURE PLLC | 1 | 01/23/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| OTEC PLBNG & HTG SVCS INC | 2 | 01/23/2026 |
| NOBLE PLUMBING & HEATING | 1 | 12/19/2025 |
| PREMIER FLOW PLBG AND HTG | 1 | 01/20/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| ASTOR APIARIES, INC. | 1 | 01/20/2024 |
| Apt 7 | 1 | 08/22/2025 |
| BRICK PLUS MORTAR LLC DBA BEAM | 1 | 12/07/2019 |
| COJOT DESIGNS | 1 | 05/13/2024 |
| EBMG LLC | 1 | 01/23/2026 |
| Lala's House LLC | 1 | 08/16/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| CHRISTOPHER TEETER,RA | 2 | 05/13/2024 |
| COMBINED ARCHITECTURE DPC | 1 | 08/16/2024 |
| HUSTVEDT CUTLER ARCHITECTS | 1 | 07/12/2024 |
| LSD GROUP | 1 | 01/23/2026 |
| WILLIAM VITACCO ASSOCIATES | 1 | 08/22/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01333117 ↗ | 299 WEST 12 STREET MANHATTAN | Alteration | Signed-off | 12/19/2025 | 03/18/2026 | Design CHEUNG SHOWMAN ARCHITECTS | IN UNIT 2D2 ON 2ND FLOOR, REMOVAL AND INSTALLATION OF NON-LOADBEARING PARTITIONS AS SHOWN ON PLANS. ALL PLUMBING WORK FILED UNDER SEPARATE A… |
| M01267407 ↗ | 682 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 08/22/2025 | 01/15/2026 | Design CHEUNG SHOWMAN ARCHITECTS Owner Apt 7 | INTERIOR RENOVATION OF UNIT 7, AT 7TH FLOOR. REMOVE AND INSTALL NON-LOADBEARING PARTITIONS. NEW FINISHES, LIGHTING THROUGHOUT. MINOR MECHANI… |
| B01248261 ↗ | 295 ST JOHNS PLACE BROOKLYN | Alteration | Signed-off | 06/30/2025 | 09/04/2025 | Design SGUERA ARCHITECTURE PLLC Owner EBMG LLC Filer LSD GROUP | KITCHEN RENOVATION WITH REMOVAL OF NON-LOAD BEARING PARTITIONS BETWEEN FOYER & CORRIDOR. RELOCATE ONE (1) SINK, ONE (1) DISHWASHER AND ONE (… |
| B01056656 ↗ | 513 DECATUR STREET BROOKLYN | Alteration | Signed-off | 06/03/2024 | 12/12/2024 | Design DEMO ARCHITECTURE, PLLC | New Steel Deck at Rear Yard. Remove existing rear window and enlarge opening at the sill to accommodate a new door. |
| M01081685 ↗ | 1230 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 07/18/2024 | 11/21/2024 | Design CHEUNG SHOWMAN ARCHITECTS | INTERIOR RENOVATION OF SUITE 2219 ON THE 22ND FLOOR. REMOVE AND INSTALL NON-LOADBEARING PARTITIONS AS SHWON ON PLANS. NO CHANGE TO EGRESS, U… |
| M01136266 ↗ | 20 WEST 72 STREET MANHATTAN | Alteration | Signed-off | 11/05/2024 | 11/21/2024 | Design CHEUNG SHOWMAN ARCHITECTS | NEW NON-LOADBEARING PARTITIONS AS SHOWN ON PLANS. ALL PLUMBING WORK FILED UNDER SEPARATE APPLICATION. NO CHANGE TO EGRESS, USE, OR OCCUPANCY… |
| M01095431 ↗ | 437 EAST 84 STREET MANHATTAN | Alteration | Signed-off | 08/16/2024 | 08/28/2024 | Design COMBINED ARCHITECTURE DPC Owner Lala's House LLC | Replacement of existing concrete painted treads with new stone treads to match dimension and profile at stoop. |
| M00858545 ↗ | 1 MORTON SQUARE MANHATTAN | Alteration | Signed-off | 04/24/2023 | 04/18/2024 | Design L. NAOUM, P.E., P. C. | Remove four existing water sourced heat pumps and replace with two new vertical water sourced heat pumps. |
| Q00877727 ↗ | 33-22 23 AVENUE QUEENS | Alteration | Signed-off | 07/12/2023 | 12/08/2023 | Design CHRISTOPHER TEETER Owner ASTOR APIARIES, INC. Filer CHRISTOPHER TEETER,RA | PLUMBING WORK AS INDICATED ON THE DRAWINGS. |
| M00911830 ↗ | 34 HUDSON YARDS MANHATTAN | Alteration | Signed-off | 08/16/2023 | 08/24/2023 | Design CHEUNG SHOWMAN ARCHITECTS | New dropped GWB ceiling in two rooms. No change in use, egress, or occupancy. |
| M00775415 ↗ | 36 WEST 24 STREET MANHATTAN | Alteration | Signed-off | 12/07/2022 | 06/23/2023 | Design CHRISTOPHER TEETER Owner COJOT DESIGNS Filer CHRISTOPHER TEETER,RA | INTERIOR RENOVATION OF EXISTING DWELLING UNIT AS INDICATED ON THE DRAWINGS. |
| M00743674 ↗ | 147 WEST 15 STREET MANHATTAN | Alteration | Signed-off | 05/31/2022 | 02/27/2023 | Design COMBINED ARCHITECTURE DPC | Combine Apartments 3NS and Apartment 4N by adding a new convenience stair. New bathroom at 3rd floor. Install new window at rear facade wher… |
| M00743822 ↗ | 147 WEST 15 STREET MANHATTAN | Alteration | Signed-off | 05/26/2022 | 06/29/2022 | Design JAG ENGINEERING, LLC | Structural work related to new convenience stair |
| 123811991BIS | 1 MORTON SQUARE MANHATTAN | — | ISSUED | 11/18/2019 | 06/14/2022 | — | OT, PL |
| 321802475BIS | 78 1/2 NORMAN AVENUE BROOKLYN | — | ISSUED | 12/03/2020 | 03/30/2022 | — | PL |
| B00220996 ↗ | KENT AVENUE BROOKLYN | Alteration | Signed-off | 12/07/2019 | 04/29/2021 | Design EARTH FIRST CONSULTING Filer QUICK FILING OF NY INC | INTERIOR RENOVATIONS AT 001 FL TO EXISTING RETAIL 2- BEAM-MECHANICAL ONLY. PLUMBING TO BE FILED IN DOB NOW BUILD UNDER SEPERATE APPLICATIO… |
| 121416011BIS | 147 WEST 15 STREET MANHATTAN | — | ISSUED | 06/20/2013 | 03/11/2021 | — | OT, PL, SP |
| 321981600BIS | KENT AVENUE BROOKLYN | — | ISSUED | 02/26/2020 | 02/26/2020 | — | OT |
| Building | Filings | Most Recent |
|---|---|---|
| 33-22 23 AVENUE ↗ | 1 | 07/08/2026 |
| 147 WEST 15 STREET ↗ | 5 | 07/08/2026 |
| 437 EAST 84 STREET ↗ | 1 | 07/08/2026 |
| 36 WEST 24 STREET ↗ | 2 | 07/08/2026 |
| 1230 AVENUE OF THE AMER ↗ | 1 | 07/08/2026 |
| 513 DECATUR STREET ↗ | 2 | 07/08/2026 |
| 34 HUDSON YARDS ↗ | 1 | 07/08/2026 |
| 1 MORTON SQUARE ↗ | 7 | 07/08/2026 |
| 295 ST JOHNS PLACE ↗ | 1 | 07/08/2026 |
| KENT AVENUE ↗ | 1 | 04/09/2026 |
| 20 WEST 72 STREET ↗ | 1 | 04/09/2026 |
| 299 WEST 12 STREET ↗ | 1 | 04/09/2026 |
| 682 AVENUE OF THE AMER ↗ | 5 | 04/09/2026 |