| B01449715 ↗ | 61 GRAHAM AVENUE BROOKLYN | Alteration CO | Filed — no permit on record | 09/16/2026 | — | — |
| M01434597 ↗ | 410 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 07/29/2026 | 09/10/2026 | MINOR RENOVATION OF UNIT #3S, INCLUDING COSMETIC FINISH WORK. NO CHANGE TO USE, EGRESS OR OCCUPANC |
| B01122246 ↗ | 96 STERLING PLACE BROOKLYN | Alteration | Permit Issued | 11/21/2024 | 08/10/2026 | Filing herewith to relocate existing HVAC along the roof. No change in use, egress or occupancy. |
| M01409813 ↗ | 412 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 06/04/2026 | 08/10/2026 | MIINOR RENOVATION OF UNIT #3S, INCLUDING COSMETIC FINISH WORK ONLY. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M01416144 ↗ | 176 7 AVENUE MANHATTAN | Alteration | Permit Issued | 06/18/2026 | 08/06/2026 | RENOVATION OF UNIT #1B ON 2ND FLR, #2A, 2B ON 3RD FLR, #3A, 3B ON 4TH FR, CELLAR AND COMMON HALLWAYS, INCLUDING REMOVING INTERIOR PARTITIONS… |
| M01409809 ↗ | 202 WEST 80 STREET MANHATTAN | Alteration | Permit Issued | 06/04/2026 | 08/05/2026 | MINOR RENOVATION OF UNIT #1W, INCLUDING LIGHTING AND FINISH WORK. NO CHANGE TO USE, EGRESS, OR OCCUPANCY |
| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| B01449715 ↗ | 61 GRAHAM AVENUE BROOKLYN | Alteration CO | Filed — no permit on record | 09/16/2026 | — | — |
| M01434597 ↗ | 410 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 07/29/2026 | 09/10/2026 | MINOR RENOVATION OF UNIT #3S, INCLUDING COSMETIC FINISH WORK. NO CHANGE TO USE, EGRESS OR OCCUPANC |
| B01122246 ↗ | 96 STERLING PLACE BROOKLYN | Alteration | Permit Issued | 11/21/2024 | 08/10/2026 | Filing herewith to relocate existing HVAC along the roof. No change in use, egress or occupancy. |
| M01409813 ↗ | 412 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 06/04/2026 | 08/10/2026 | MIINOR RENOVATION OF UNIT #3S, INCLUDING COSMETIC FINISH WORK ONLY. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M01416144 ↗ | 176 7 AVENUE MANHATTAN | Alteration | Permit Issued | 06/18/2026 | 08/06/2026 | RENOVATION OF UNIT #1B ON 2ND FLR, #2A, 2B ON 3RD FLR, #3A, 3B ON 4TH FR, CELLAR AND COMMON HALLWAYS, INCLUDING REMOVING INTERIOR PARTITIONS… |
| M01409809 ↗ | 202 WEST 80 STREET MANHATTAN | Alteration | Permit Issued | 06/04/2026 | 08/05/2026 | MINOR RENOVATION OF UNIT #1W, INCLUDING LIGHTING AND FINISH WORK. NO CHANGE TO USE, EGRESS, OR OCCUPANCY |
| Q01435159 ↗ | 30-88 CRESCENT STREET QUEENS | New Building | Filed — no permit on record | 08/04/2026 | — | — |
| M01379950 ↗ | 208 EAST 64 STREET MANHATTAN | Alteration | Permit Issued | 04/22/2026 | 07/23/2026 | Subsequent filing mech work for the 7th floor OPHTHALMOLOGY CLINIC renovation , new HVACs , duct work as per plans , no change in use, egres… |
| B01393211 ↗ | 292 ATLANTIC AVENUE BROOKLYN | Alteration | Permit Issued | 05/20/2026 | 07/22/2026 | RENOVATE APT UNITS #S1, A2 & S3 ON 2ND, 3RD & 4TH FLOOR,INCLUDING REMOVAL & INSTALLATION NEW INTERIOR PARTITIONS,LIGHTING & FINISH. NO CHAN… |
| Q01312065 ↗ | 709 WOODWARD AVENUE QUEENS | Alteration | Signed-off | 11/18/2025 | 07/06/2026 | RENOVATE UNITS #1L,1R,2L,2R & COMMON HALLWAY FROM CELLAR TO 2ND FLOOR, INCLUDING REMOVAL & INSTALLATION NEW INTERIOR PARTITIONS, LIGHTING & … |
| B00982183 ↗ | 56 PIERREPONT STREET BROOKLYN | Alteration CO | Permit Issued | 02/01/2024 | 06/05/2026 | Sprinkler work filed in conjunction with Alt-CO application. Work is only limited to the stair |
| B01407147 ↗ | 444 15 STREET BROOKLYN | Alteration | Filed — no permit on record | 06/04/2026 | — | — |
| B01372391 ↗ | 315 COURT STREET BROOKLYN | Alteration | Signed-off | 03/16/2026 | 05/18/2026 | INSTALL ROOF DECK AT EXIST'G 3RD FL ROOF AT 20'X25' IN SIZE & METAL GUARDRAIL AROUND THE ROOF DECK AS REQ'D TO CURE ECB VIOLATION #39179177L… |
| M01376862 ↗ | 303 E. 93RD ST. MANHATTAN | Alteration CO | Filed — no permit on record | 05/01/2026 | — | — |
| B01370754 ↗ | 144 NORTH 10 STREET BROOKLYN | Alteration | Permit Issued | 03/16/2026 | 04/30/2026 | RENOVATE UNIT #4E & HALLWAY ON 4TH FLOOR INCLUDING INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS, LIGHTING AND FINISH WORK. NO CHANGE … |
| M01299611 ↗ | 303 WEST 74 STREET MANHATTAN | Alteration | Permit Issued | 12/30/2025 | 04/17/2026 | RENOVATE UNITS # 3F, 4F AND COMMON HALLWAY FROM 1ST FLOOR TO 5TH FLOOR, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTIT… |
| X01143109 ↗ | 2021 GRAND CONCOURSE BRONX | Alteration | Permit Issued | 10/08/2025 | 04/16/2026 | RENOVATE EXISTING DOCTOR'S OFFICES AND NURSES RESTROOMS AT 4TH FLOOR INCLUDING REMOVING AND INSTALLING NEW INTERIOR NON-BEARING PARTITIONS, … |
| B01006074 ↗ | 37 FROST STREET BROOKLYN | Alteration | Signed-off | 02/15/2024 | 04/09/2026 | RENOVATE UNITS #1B, 1D, 2A, 2B, 2C, 2D, 3A, 3B, 3C, 3D & COMMON HALLWAY FROM 2ND FL TO ROOF, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NO… |
| M01364476 ↗ | 303 WEST 116 STREET MANHATTAN | Alteration | Signed-off | 03/10/2026 | 04/03/2026 | RENOVATION OF UNIT# 2, 3, 4, 5, FROM 2ND FLOOR TO 5TH FLOOR, CELLAR AND FIRST FLOOR HALLWAY, INCLUDING REMOVING INTERIOR PARTITIONS, LIGHTIN… |
| M01353510 ↗ | 44 EAST 32 STREET MANHATTAN | Alteration | Signed-off | 03/03/2026 | 04/01/2026 | CREATE A NEW FLOOR OPENING ONLY BETWEEN 4TH AND 5TH FLOOR IN CONJUNCTION WITH JOB #M01359221. NO CHANGE IN USE EGRESS OR OCCUPANCY |
| B00835202 ↗ | 444 15 STREET BROOKLYN | Alteration | Permit Issued | 03/03/2023 | 03/02/2026 | PLUMBING WORK TO RENOVATE UNITS #1L and 1R @ 1ST FLOOR, 3L and 3R @ 3RDFLOOR & CELLAR .NO CHANGE TO USE, EGRESS OR OCCUPANR |
| M01338753 ↗ | 342 EAST 49 STREET MANHATTAN | Alteration | Signed-off | 01/09/2026 | 03/02/2026 | PLUMBING WORK FOR DENTAL OFFICE AT 1ST FLOOR & CELLAR; NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M01278210 ↗ | 1 BLEECKER STREET MANHATTAN | Alteration | Signed-off | 09/22/2025 | 02/24/2026 | RENOVATE UNIT #3 @3RD FLOOR, INCLUDE REMOVING AND INSTALLING NEWINTERIOR NON-LOAD BEARING PARTITIONS, LIGHTNING AND FINISH WORK.NO CHANGE TO… |
| B01017889 ↗ | 444 15 STREET BROOKLYN | Alteration | Permit Issued | 03/25/2024 | 02/20/2026 | PLUMBING WORK TO RENOVATE UNIT #2R and 2L & CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B01077653 ↗ | 444 15 STREET BROOKLYN | Alteration | Permit Issued | 07/26/2024 | 02/20/2026 | PLUMBING WORK TO RENOVATE UNIT #4L& 4R . CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00803921 ↗ | 251 NORTH 8 STREET BROOKLYN | Alteration | Signed-off | 01/04/2023 | 02/17/2026 | RENOVATE UNITS 1L, 2L, 4L, 4R & COMMON HALLWAY FROM CELLAR TO ROOF, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS… |
| B01227437 ↗ | 444 15 STREET BROOKLYN | Alteration | Permit Issued | 05/29/2025 | 02/17/2026 | MECHANICAL WORK TO RENOVATE UNITS #1R, 1L, 2R, 2L, 3R, 3L, 4R, 4L &ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M01270089 ↗ | 1260 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 08/20/2025 | 02/17/2026 | PLUMBING WORK FOR EXIST'G DENTAL OFFICE AT UNIT #1807 ON 18TH FLOOR ; NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| B01332483 ↗ | 292 ATLANTIC AVENUE BROOKLYN | Alteration | Signed-off | 12/19/2025 | 02/02/2026 | RENOVATE APT UNITS #S2 & #A3 ON 3RD & 4TH FLOOR AND COMMON HALLWAY FROM CELLAR TO ROOF, INCLUDING REMOVAL & INSTALLATION NEW INTERIOR PARTIT… |
| M01304190 ↗ | 410 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 10/20/2025 | 01/23/2026 | PLUMBING WORK TO RENOVATE UNIT #3N AT 3RD FLOOR. NO CHANGE TOUSE, EGRESS OR OCCUPANCY |
| B00959422 ↗ | 182 NORMAN AVENUE BROOKLYN | Alteration | Signed-off | 01/25/2024 | 01/07/2026 | RENOVATE UNITS #2L, 2R, 3L, 3R & COMMON HALLWAY FROM 2ND FLOOR TO ROOF, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTIT… |
| B01283739 ↗ | 306 COURT STREET BROOKLYN | Alteration | Signed-off | 09/17/2025 | 12/19/2025 | RENOVATE APT UNITS #1, #2 & 3 ON 2ND, 3RD AND 4TH FLOOR, COMMON HALLWAY FROM 1ST FLOOR TO 4TH FLOOR, INCLUDING REMOVAL & INSTALLATION NEW IN… |
| B01022548 ↗ | 182 NORMAN AVENUE BROOKLYN | Alteration CO | Permit Issued | 04/10/2024 | 12/18/2025 | PLUMBING WORKS FOR UNITS #1R,1L & CELLAR. |
| M01264342 ↗ | 308 EAST 78 STREET MANHATTAN | Alteration | Signed-off | 08/06/2025 | 12/11/2025 | PLUMBING WORK AT UNITS #8, 13. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q01320344 ↗ | 37-08 GREENPOINT AVENUE QUEENS | Alteration | Filed — no permit on record | 12/10/2025 | — | — |
| M01305320 ↗ | 414 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 10/21/2025 | 12/02/2025 | PLUMBING WORK TO RENOVATE UNIT 3S AT 3RD FLOOR. NO CHANGE TOUSE, EGRESS OR OCCUPANCY |
| B01291864 ↗ | 313 SOUTH 4 STREET BROOKLYN | Alteration | Signed-off | 09/30/2025 | 12/01/2025 | Plumbing modifications to remove kitchenette sink. No change to use, egress, or occupancy. |
| B01316233 ↗ | 443 WARREN STREET BROOKLYN | Alteration | Filed — no permit on record | 11/18/2025 | — | — |
| Q01239544 ↗ | 45-42 VERNON BOULEVARD QUEENS | Alteration | Signed-off | 07/16/2025 | 11/07/2025 | INSTALL STEEL DUNNAGE TO ACCOMMODATE EXISTING CONDENSERS TO CURE ECB VIOLATION #039143781N. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B01206939 ↗ | 250 UNION AVENUE BROOKLYN | Alteration | Signed-off | 04/23/2025 | 09/08/2025 | STRUCTURAL MODIFICATIONS AS PER PLANS. REPLACING ROOF AND INSTALLATION OF NEW STAIR BULKHEADS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01244108 ↗ | 243 EAST 13 STREET MANHATTAN | Alteration | Signed-off | 07/11/2025 | 09/03/2025 | PLUMBING WORK TO RENOVATE UNITS #1, #2, #7, #10, #15, #18. NO CHANGE TO USE, EGRESS OR O |
| B01241241 ↗ | 144 EVERGREEN AVENUE BROOKLYN | Alteration | Signed-off | 06/24/2025 | 08/26/2025 | RENOVATE APARTMENT UNITS #1, 2L, 2R, 3L, 3R & COMMON HALLWAY FROM 1ST FLOOR TO 3RD FLOOR, INCLUDING REMOVAL & INSTALLATION NEW INTERIOR PART… |
| Q01148686 ↗ | 48-15 43 AVENUE QUEENS | Alteration | Signed-off | 12/18/2024 | 08/25/2025 | RENOVATE UNIT 1, COMMON LOBBY AND CELLAR STORAGE AREA, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS, LIGHTING AN… |
| M01255151 ↗ | 245 EAST 13 STREET MANHATTAN | Alteration | Signed-off | 07/17/2025 | 08/14/2025 | PLUMBING WORK TO RENOVATE UNITS #1,#4,#10, #12,#16, #17, #21, #23, #24. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00943715 ↗ | 120 EAST 56 STREET MANHATTAN | Alteration | Permit Issued | 11/01/2023 | 06/16/2025 | Plumbing and Sprinkler renovation for a medical office. No change in egress, use or occupancy. |
| M01176894 ↗ | 120 EAST 37 STREET MANHATTAN | Alteration CO | Permit Issued | 02/07/2025 | 06/16/2025 | Plumbing works to renovate cellar. No change to use, egress or occupancy. |
| M01205487 ↗ | 308 EAST 78 STREET MANHATTAN | Alteration | Signed-off | 04/29/2025 | 06/16/2025 | PLUMBING WORK AT UNITS #5, 16, 18, 19, 20, 21, 22, 24, 26, 28, 34, 35 & 38. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01198124 ↗ | 161 EAST 89 STREET MANHATTAN | Alteration | Signed-off | 04/16/2025 | 06/12/2025 | RENOVATE UNIT #5A, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS, LIGHTING AND FINISH WORK. NO CHANGE TO USE, EGR… |
| M01210068 ↗ | 333 EAST 9 STREET MANHATTAN | Alteration | Signed-off | 04/16/2025 | 06/04/2025 | RENOVATE RESIDENTIAL UNIT #7, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS, LIGHTING AND FINISH WORK ,NO CHANGE … |
| M01137058 ↗ | 18 EAST 48 STREET MANHATTAN | Alteration | Signed-off | 11/13/2024 | 05/14/2025 | PL work fir INTERIOR RENOVATIONS FOR DENTAL OFFICE AT 7TH FLOOR ; NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| B01192755 ↗ | 319 COURT STREET BROOKLYN | Alteration | Signed-off | 03/24/2025 | 04/18/2025 | RENOVATION FOR RESIDENTIAL UNIT OF 2ND, 3RD FLOOR & COMMON AREA, INCLUDING REMOVAL & INSTALLATION NEW INTERIOR PARTITIONS, LIGHTING & FINISH… |
| M01181543 ↗ | 535 PARK AVENUE MANHATTAN | Alteration | Signed-off | 03/03/2025 | 04/14/2025 | INTERIOR RENOVATIONS FOR DENTAL OFFICE AT BASEMENT & CELLAR; NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| Q00713376 ↗ | 98-27 101 STREET QUEENS | Alteration | Signed-off | 04/28/2022 | 04/02/2025 | file PL work for DENTAL OFFICE AT 1ST FLOOR & CELLAR ; NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M01158399 ↗ | 308 EAST 78 STREET MANHATTAN | Alteration | Signed-off | 02/04/2025 | 03/31/2025 | PLUMBING WORK OF UNITS #7, 10, 12,17, 23, 25, 29, 30, 31, 32, 33, 36, 37 & RENOVATECOMMON HALLWAY FROM 2ND TO 6TH FLR. NO CHANGE TO USE, EGR… |
| M01164968 ↗ | 410 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 02/13/2025 | 03/31/2025 | PL worek for units 1R, 2S, 4R, 5S and 5N at 001 , 002 , 4th and 5th floor , no change to use, egress or occupany |
| B01163673 ↗ | 19 COLUMBIA PLACE BROOKLYN | Alteration | Signed-off | 01/09/2025 | 03/28/2025 | REPLACEMENT OF WINDOWS, NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B01170947 ↗ | 21 COLUMBIA PLACE BROOKLYN | Alteration | Signed-off | 01/23/2025 | 03/28/2025 | REPLACEMENT OF WINDOWS, NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01169303 ↗ | 349 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 02/03/2025 | 03/27/2025 | PL work for dental office renovation at penhouse as per plans , no change to use, egress or occupancy |
| M01110701 ↗ | 183 GRAND STREET MANHATTAN | Alteration | Signed-off | 09/26/2024 | 03/25/2025 | PLUMBING WORK FOR RETAIL STORE. |
| M01164115 ↗ | 414 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 01/22/2025 | 03/17/2025 | PL work to renovate unit 3R and 4R at 3rd and 4th floor , no change in use, egress or occupancy |
| M01182208 ↗ | 120 EAST 37 STREET MANHATTAN | Alteration | Signed-off | 02/21/2025 | 03/14/2025 | REPLACEMENT OF THE WINDOWS; NO CHANGE TO USE, EGRESSOR OCCUPANCY. |
| M01168492 ↗ | 416 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 02/13/2025 | 03/11/2025 | PL work to renovate units 2S, 2N, 4N, 4W, 5N,5S at 2nd , 4th , 5th floor, no change to use, egress or occupancy |
| M01119295 ↗ | 212 8 AVENUE MANHATTAN | Alteration | Signed-off | 10/09/2024 | 03/10/2025 | PLUMBING WORK TO RENOVATE UNITS #1E, 1W, 2E, 2W, 3E, 3W, 4W FROM 1ST TO 4TH FLOOR AND CURE VIOLATION #39133407Y. NO CHANGE TO USE, EGRESS OR… |
| M01152411 ↗ | 202 WEST 80 STREET MANHATTAN | Alteration | Signed-off | 02/14/2025 | 03/07/2025 | PL work to renovation units #2W, #3E , #3W, 4W , 5E at 2nd , 3rd and 4th and 5th floor , no change to use , egress or occupancy |
| M01123043 ↗ | 212 8 AVENUE MANHATTAN | Alteration | Signed-off | 10/15/2024 | 03/03/2025 | PLUMBING WORK TO RENOVATE UNITS #2E, 3E, 4W FROM 2ND TO 4TH FLOOR AND CURE VIOLATION #39133440X. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01152946 ↗ | 204 WEST 80 STREET MANHATTAN | Alteration | Signed-off | 01/22/2025 | 03/03/2025 | PL work to renovate units #3W , 5E at 3rde and 5th floor , no change to use, egress or occupancy |
| M01164112 ↗ | 412 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 01/21/2025 | 03/03/2025 | PL work to renovate unit 2s and 4R at 2nd and 4th floor , no change in use, egress or occuapancy |
| M01125820 ↗ | 212 8 AVENUE MANHATTAN | Alteration | Signed-off | 10/16/2024 | 02/26/2025 | PLUMBING WORK TO RENOVATE UNITS #2, UNIT #3, UNIT #4 FROM 2ND TO 4TH FLOOR AND CURE ECB VIOLATION #39133375Z. NO CHANGE TO USE, EGRESS OR OC… |
| B01175508 ↗ | 319 COURT STREET BROOKLYN | Alteration | Signed-off | 02/04/2025 | 02/24/2025 | RENOVATION FOR COMMERCIAL SPACE ON 1ST FLOOR & COMMON AREA, INCLUDING REMOVAL & INSTALLATION NEW INTERIOR PARTITIONS, LIGHTING & FINISH. NO … |
| Q01114705 ↗ | 5-33 48TH AVENUE QUEENS | Alteration | Signed-off | 09/27/2024 | 02/12/2025 | PL work for dental office renovation at 001 floor , no change in use, egress or occupancy |
| M01123371 ↗ | 233 EAST 10 STREET MANHATTAN | Alteration | Signed-off | 10/29/2024 | 02/06/2025 | RENOVATE UNITS 1A,1B,1C,1D,1E,1G,1H,2A,2B,2D,2E,2F,2G,3A,3C,3E,3F,3G,3H,4A,4C,4E,4G,4H,&COMMON HALLWAY FROM CELLAR TO ROOF, INCLUDE REMOVING… |
| B01162448 ↗ | 131 GREENPOINT AVENUE BROOKLYN | Alteration | Signed-off | 01/06/2025 | 02/03/2025 | REMOVE A TEMPORARY FENCE SCREEN AT REAR OF BLDG TO CURE ECB VIOLATION #35013623R |
| M01128071 ↗ | 495 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 11/18/2024 | 01/22/2025 | RENOVATE RETAIL STORE #1 AT FIRST FLOOR, INCLUDE FINISH WORK & REMOVING EXIST'G NON-LOAD BEARING PARTITIONS. NO CHANGE TO USE, EGRESS OR OCC… |
| M01163044 ↗ | 233 EAST 10 STREET MANHATTAN | Alteration | Signed-off | 01/07/2025 | 01/21/2025 | RENOVATE UNITS #A, B, C, D, E, F, G IN BASEMENT, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS, LIGHTING AND FINI… |
| B01091180 ↗ | 19 COLUMBIA PLACE BROOKLYN | Alteration | Signed-off | 09/10/2024 | 01/10/2025 | RENOVATE UNITS #1F, 1R, 2F, 2R, 3F, 3R, 4F, 4R AND COMMON HALLWAY FROM CELLAR TO ROOF, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD… |
| B01066127 ↗ | 463 CLINTON AVENUE BROOKLYN | Alteration | Signed-off | 07/01/2024 | 01/09/2025 | RENOVATE UNIT #3, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS, LIGHTING AND FINISH WORK. NO CHANGE TO USE, EGRE… |
| B01124927 ↗ | 819 8 AVENUE BROOKLYN | Alteration | Signed-off | 10/14/2024 | 12/19/2024 | PLUMBING WORK FOR (4) RESIDENTIAL UNITS 1, 2, 3, 4 & 5. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B01141246 ↗ | 84 1 PLACE BROOKLYN | Alteration | Signed-off | 12/02/2024 | 12/17/2024 | RENOVATE UNITS #2, 3, 4, 5 AND COMMON HALLWAY FROM CELLAR TO ROOF, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS,… |
| B01127350 ↗ | 131 GREENPOINT AVENUE BROOKLYN | Alteration | Signed-off | 11/13/2024 | 12/10/2024 | PL work for apt unit 3F, no change in use, egress or occupancy |
| B01111672 ↗ | 21 COLUMBIA PLACE BROOKLYN | Alteration | Signed-off | 09/23/2024 | 12/09/2024 | RENOVATE UNITS #1F, 1R, 2F, 2R, 3F, 3R, 4F, 4R AND COMMON HALLWAY FROM CELLAR TO ROOF, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD… |
| B01070979 ↗ | 96 ECKFORD STREET BROOKLYN | Alteration | Signed-off | 07/01/2024 | 12/03/2024 | PLUMBING WORKS TO RENOVATE UNITS #1R, 1L, 2R, 2L, 3R, 3L AND CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B01121840 ↗ | 819 8 AVENUE BROOKLYN | Alteration | Signed-off | 11/18/2024 | 11/22/2024 | RENOVATE UNITS 1, 2, 3, 4, 5 & COMMON HALLWAY FROM 1ST FL. TO 4TH FL., INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITI… |
| M01107661 ↗ | 245 EAST 30 STREET MANHATTAN | Alteration | Signed-off | 09/13/2024 | 11/22/2024 | RENOVATE UNIT 31 AT 3RD FLOOR. INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS LIGHTING AND FINISH WORK and to addr… |
| B01029912 ↗ | 1501 BROADWAY BROOKLYN | Alteration | Signed-off | 04/04/2024 | 11/15/2024 | REMOVE EXISTING ILLEGAL ELEVATED ROOM AT 1ST FLR TO CURE ECB VIOLATION #35411051Y & REMOVE EXISTING ILLEGAL PARTITIONS AT CELLAR TO CURE ECB… |
| B01117729 ↗ | 211 DEKALB AVENUE BROOKLYN | Alteration | Signed-off | 09/26/2024 | 10/15/2024 | OBTAIN PERMIT FOR INSTALLATION OF AWNINGS ON ADELPHI STREET FACADE TO RESOLVE LPC VIOLATION (VIOLATION NUMBER: VIO-19-0267). AND INSTALL NEW… |
| Q00646507 ↗ | 97-16 METROPOLITAN AVENUE QUEENS | Alteration | Permit Issued | 12/15/2021 | 08/08/2024 | Installation of Boiler as shown on plans. |
| B00922561 ↗ | 51 5 AVENUE BROOKLYN | Alteration | Signed-off | 05/08/2024 | 07/29/2024 | RENOVATE RESIDENTIAL UNITS #2R, 2L, 3R, 4R, 4L & COMMON AREA/HALLWAY FROM CELLAR TO ROOF, INCLUDING REMOVING AND INSTALLING NEW INTERIOR NON… |
| B00814591 ↗ | 360 9 STREET BROOKLYN | Alteration | Permit Issued | 01/25/2023 | 07/15/2024 | RENOVATION AND ADDITION FOR EXISTING MEDICAL OFFICE ON FIRST FL. WORK INCLUDES REMOVING & INSTALLING NEW INTERIOR PARTITIONS, LIGHTING & FIN… |
| M01019636 ↗ | 333 EAST 52 STREET MANHATTAN | Alteration | Signed-off | 03/25/2024 | 07/10/2024 | RENOVATE UNITS #1, 2, 3A, 3B, 4A, 4B, 5 AND COMMON HALLWAY FROM CELLAR TO ROOF, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARIN… |
| B01031649 ↗ | 814 MANHATTAN AVENUE BROOKLYN | Alteration | Signed-off | 04/09/2024 | 06/26/2024 | RENOVATE UNITS #1, 2, 3A, 3B, 4A, 4B, 5 AND COMMON HALLWAY FROM CELLAR TO ROOF, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARIN… |
| M00994618 ↗ | 75 THOMPSON STREET MANHATTAN | Alteration | Signed-off | 01/31/2024 | 06/26/2024 | RENOVATION TO UNITS #1,2,3,4,6,7,8,9,10,11,12,15,19,21,22 AND COMMON HALLWAY; WORKS INCLUDE REMOVING NON-LOAD BEARING PARTITIONS, INSTALLING… |
| M01041397 ↗ | 120 EAST 37 STREET MANHATTAN | Alteration | Signed-off | 05/01/2024 | 06/26/2024 | RENOVATE UNITS #1, 2, 3F, 3R, 4F, 4R, 5 AND COMMON HALLWAY FROM CELLAR TO ROOF, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARIN… |
| M00814345 ↗ | 112 4 AVENUE MANHATTAN | Alteration CO | Permit Issued | 02/06/2023 | 06/21/2024 | INSTALL TEMPORARY CONSTRUCTION PLYWOOD FENCE FILED IN CONJ. WITH DOB NOW JOB # M00818345-I1, NO CHANGE IN USE, OCCUPANCY OR EGRESS |
| M00976693 ↗ | 112 4 AVENUE MANHATTAN | Alteration | Signed-off | 04/25/2024 | 06/21/2024 | Application filed herewith for the installation of new HVAC system. No change in use, egress or occupancy. |
| Q01044938 ↗ | 41-27 49 STREET QUEENS | Alteration | Signed-off | 05/07/2024 | 06/21/2024 | Renovate unit 3R, including removing and installing new interior non-load bearing partitions, mechanical, plumbing, lighting and finish work… |
| M00976996 ↗ | 112 4 AVENUE MANHATTAN | Alteration | Signed-off | 04/12/2024 | 05/23/2024 | Modification of existing storm and sanitary systems. Removing and installing new plumbing fixtures. No Change in use, egress or occupancy… |
| M00837428 ↗ | 236 WEST 10 STREET MANHATTAN | Alteration | Signed-off | 06/26/2023 | 05/22/2024 | Interior renovation to combine unit 11 & 12 as per TPPN 3/97. Partition changes. No change in use, egress and occupancy. |
| M01022859 ↗ | 60 EAST 12 STREET MANHATTAN | Alteration | Signed-off | 03/21/2024 | 05/14/2024 | RENOVATE UNIT 1L AT 1ST FLOOR, INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARING PARTIONS, PLUMBING, LIGHTING AND FINISH WORK. N… |
| M00983079 ↗ | 424 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 01/03/2024 | 05/13/2024 | PLUMBING WORKS FOR DENTAL OFFICE AT BASEMENT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00785631 ↗ | 473 UNION STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 08/28/2022 | 05/10/2024 | sprinkler work |
| Person | Filings | Most recent |
|---|---|---|
| Joon Ho Chai | 610 | 08/25/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| A & T ENGINEERING, P.C. | 3 | 08/04/2026 |
| AMINOV DESIGN ENGINEER, PC | 1 | 03/01/2024 |
| ASE PLLC | 1 | 02/11/2025 |
| ENGINEERING SOLUTIONS | 1 | 08/26/2026 |
| JOSEPH K. BLUM CO. LLP | 1 | 01/14/2026 |
| LIZARDOS ENGINEERING | 1 | 04/23/2026 |
| R.J. MCGEE ENGINEERING, PLLC | 1 | 11/02/2023 |
| RIGID STRUCTURAL DESIGN, LLC | 1 | 08/04/2026 |
| SA-DA ARCHITECTURE | 1 | 09/24/2025 |
| SY ENGINEERING PLLC | 1 | 03/06/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| T & T PLUMBING INC | 116 | 06/26/2026 |
| JKO CONSTRUCTION & CONSU* | 54 | 01/17/2023 |
| JKO USA MANAGEMENT INC | 47 | 12/02/2025 |
| BADGER MANAGEMENT INC | 30 | 06/26/2026 |
| REDIRECTING LIC INC | 30 | 04/23/2026 |
| CK PLUMBING & MECH INC | 15 | 01/09/2026 |
| DO N CONSTRUCTION CORP | 15 | 01/09/2026 |
| T.N.T PLBG & HTG, INC | 12 | 10/18/2023 |
| HARROW NY INC | 11 | 07/29/2026 |
| AMERICAN STANDARD P&H COR | 10 | 06/29/2026 |
| CITADEL PARTNERS LLC | 9 | 03/08/2023 |
| INNOVATION PLUMBING LLC | 9 | 11/29/2023 |
| METRO PROJECTS CONST INC | 9 | 09/26/2024 |
| CLEAN TECH MECHANICAL INC | 7 | 03/24/2021 |
| NIGHT HAWK PLMBNG & HTNG | 7 | 02/15/2022 |
| RRP PLUMBING CORP | 7 | 11/03/2025 |
| KG MANAGEMENT CNSLTNG INC | 5 | 02/16/2021 |
| LUVER PLBG & HTG INC | 5 | 01/04/2024 |
| NORTHBRIDGE CONTRACTING L | 5 | 09/24/2025 |
| PALLADIANA GROUP LLC | 5 | 09/26/2024 |
| A & M WARSHAW PLBG & HTG | 4 | 04/10/2024 |
| EBL CONTRACTING CORP | 4 | 06/02/2026 |
| MING MAI CONSTRUCTION INC | 4 | 05/20/2022 |
| TRI CITY MECHANICAL GROUP | 4 | 09/24/2025 |
| AQUA PLUMBING & HTNG CORP | 3 | 01/08/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| Apex Management Group | 159 | 07/29/2026 |
| PEAK CAPITAL ADVISORS 2 LLC | 22 | 11/03/2021 |
| HOLLISWOOD DEVELOPMENT | 8 | 08/26/2026 |
| MAE EQUITIES INC | 6 | 06/02/2026 |
| MGT PROPERTY MANAGEMENT | 5 | 09/30/2025 |
| Sollevare Group | 5 | 05/20/2026 |
| COLLIERS TRI-STATE | 3 | 10/21/2021 |
| 473 UNION OWNER LLC | 2 | 02/11/2025 |
| 500 WEST 37TH STREET CO., LLC | 2 | 07/16/2021 |
| BAM GO DEVELOPERS, LLC | 2 | 06/11/2021 |
| DR MEHTAS DENTAL LLC | 2 | 03/08/2023 |
| ESER REALTY LLC | 2 | 09/23/2022 |
| FOREST HILLS DENTAL PC | 2 | 02/09/2021 |
| Fultonex Management | 2 | 08/22/2022 |
| HALSTEAD MANAGEMENT | 2 | 08/03/2021 |
| HOFFMAN MANAGEMENT | 2 | 01/17/2024 |
| JAMAICA 98 LLC | 2 | 04/06/2026 |
| P&P CARE LLC | 2 | 03/01/2024 |
| RockSolid PM | 2 | 06/29/2026 |
| SLATE PROPERTY GROUP | 2 | 04/03/2024 |
| ZZZ 5TH AVE HOLDINGS LLC | 2 | 04/13/2022 |
| 256 W 125TH ST REALTY | 1 | 03/27/2023 |
| 27-35 JACKSON AVENUE LLC | 1 | 12/15/2021 |
| 4836 41 STREET OWNERS LLC | 1 | 09/19/2019 |
| 61 Graham Enterprise | 1 | 09/16/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| HTX BUILDING CONSULTING | 215 | 07/29/2026 |
| RICHARD WAINER ARCHITECT, PLLC | 37 | 06/26/2026 |
| JRK CREATIVE INC | 11 | 09/16/2026 |
| JM ZONING, LLC. | 9 | 03/06/2026 |
| NEXUS CONSULTING NYC, INC | 3 | 08/26/2026 |
| BIG ORANGE EXPEDITING, INC | 2 | 09/24/2025 |
| MICHAEL ZENREICH ARCHITECT, PC | 2 | 04/06/2025 |
| ONESS DESIGN & EXPEDITING INC | 2 | 09/08/2021 |
| QUICK FILING OF NY INC | 2 | 02/11/2025 |
| A & D BUILDING SOLUTIONS | 1 | 03/01/2024 |
| ARCHETYPE CONSULTANTS, INC. | 1 | 03/27/2023 |
| CONSTRUCTION PERMIT SERVICES | 1 | 11/21/2024 |
| Rigid Structural Design, LLC | 1 | 08/04/2026 |
| SITE SAFETY BSD | 1 | 08/04/2026 |