← Back
Design Firm
KIMOY STUDIOS ARCHITECTURE DPC
Design · filed under 3 names
14 jobs with open permitsMANHATTAN · 30BROOKLYN · 7QUEENS · 5
33 buildings
86
Total Filings
43
Jobs on File
33
Buildings Worked
14
Jobs w/ Open Permits
Design
Role
Activity
Jobs by first filing month43 jobs all-time
0246Feb '19 · 1Mar '19 · 1Jul '19 · 1Mar '20 · 1May '20 · 1Mar '21 · 5Jun '21 · 1Aug '21 · 2Sep '21 · 2Oct '21 · 1Nov '21 · 1Feb '22 · 2Mar '22 · 2May '22 · 1Jun '22 · 1Jul '22 · 2Aug '22 · 1Oct '22 · 1Dec '22 · 3Jun '23 · 1Jul '23 · 1Nov '23 · 1Jan '24 · 1Mar '24 · 2Jul '24 · 1Dec '24 · 1Jan '25 · 1Jun '25 · 1Aug '25 · 2Jan '26 · 12020202120222023202420252026
bars = month · line = 3-mo average
Portfolio status
Browse jobs →
Open permit1433%
Signed off2456%
Filed only512%
By job type
Alteration42
No Work1
Most active buildings
All buildings →
84 HUDSON STREETMANHATTAN · latest 04/28/2021
2 jobs
350 BLEECKER STREETMANHATTAN · latest 10/25/2022
2 jobs
151 WEST 30 STREETMANHATTAN · latest 05/14/2024
2 jobs
20 WEST 72 STREETMANHATTAN · latest 12/20/2023
2 jobs
301 EAST 48 STREETMANHATTAN · latest 09/25/2024
2 jobs
100 OVERLOOK TERRACEMANHATTAN · latest 05/17/2023
2 jobs
John Kimlatest 05/22/2026
51 filings
Filed under
KIMOY STUDIOS ARCHITECTURE DPC67KIMOY STUDIOS17KIMOY ARCHITECTURE & DESIGN2
Identified by the contact ids of the people who file for the firm and by its email domain (kmystudios.com), not by matching names.
Most recent jobs
All jobs →
JobAddressTypeStatusFiledLatest permitDescription
M01248407 ↗543 WEST 122ND STREET
MANHATTAN
AlterationPermit Issued08/05/202509/15/2026REPLACEMENT OF A VERTICAL WATER-COOLED UNIT WITH A HORIZONTAL WATER-COOLED UNIT CONNECTED TO EXISTING PIPING. NEW SUPPLY DUCTWORK AND NEW EX…
Q01223825 ↗25-02 DITMARS BOULEVARD
QUEENS
AlterationPermit Issued06/12/202504/27/2026Plumbing scope associated with the interior renovation of the existing 2-family house. No change of use, egress or occupancy.
B01337878 ↗117 ADAMS STREET
BROOKLYN
AlterationPermit Issued01/16/202604/02/2026Plumbing and Sprinkler scope associated with the restaurant renovation on the 002FL (Ground floor) , no change of use, egress or occupancy.
M01250534 ↗120 CABRINI BOULEVARD
MANHATTAN
AlterationPermit Issued08/01/202510/21/2025PLUMBING SCOPE ASSOCIATED WITH INTERIOR RENOVATION AND COMBINATION OF UNITS 84 AND 85 IN COMPLIANCE WITH TPPN 03/97 AS PER PLANS SUBMITTED H…
M01074022 ↗120 CABRINI BOULEVARD
MANHATTAN
AlterationPermit Issued07/03/202405/20/2025This application is filed for the Architectural scope associated with the apt.78 interior renovation. No change in use, egress, or occupancy…
M01106608 ↗35 WEST 90 STREET
MANHATTAN
AlterationPermit Issued12/20/202401/27/2025Plumbing scope associated with the apt.7DF interior renovation. No change of use, egress or occupancy.
Counts cover all 43 jobs (43 DOB NOW). Dated by first filing; BIS jobs by first permit issuance.
43 DOB NOW jobs, anchored the same way as Buildings Worked. Status is the job's permit state today: open = at least one permit currently issued. BIS jobs show their raw permit status and are not counted as open.
All 43Open permit 14Signed off 24Filed only 5
Any typeAlteration 42No Work 1
43 jobs
JobAddressTypeStatusFiledLatest permitDescription
M01248407 ↗543 WEST 122ND STREET
MANHATTAN
AlterationPermit Issued08/05/202509/15/2026REPLACEMENT OF A VERTICAL WATER-COOLED UNIT WITH A HORIZONTAL WATER-COOLED UNIT CONNECTED TO EXISTING PIPING. NEW SUPPLY DUCTWORK AND NEW EX…
Q01223825 ↗25-02 DITMARS BOULEVARD
QUEENS
AlterationPermit Issued06/12/202504/27/2026Plumbing scope associated with the interior renovation of the existing 2-family house. No change of use, egress or occupancy.
B01337878 ↗117 ADAMS STREET
BROOKLYN
AlterationPermit Issued01/16/202604/02/2026Plumbing and Sprinkler scope associated with the restaurant renovation on the 002FL (Ground floor) , no change of use, egress or occupancy.
M01250534 ↗120 CABRINI BOULEVARD
MANHATTAN
AlterationPermit Issued08/01/202510/21/2025PLUMBING SCOPE ASSOCIATED WITH INTERIOR RENOVATION AND COMBINATION OF UNITS 84 AND 85 IN COMPLIANCE WITH TPPN 03/97 AS PER PLANS SUBMITTED H…
M01074022 ↗120 CABRINI BOULEVARD
MANHATTAN
AlterationPermit Issued07/03/202405/20/2025This application is filed for the Architectural scope associated with the apt.78 interior renovation. No change in use, egress, or occupancy…
M01106608 ↗35 WEST 90 STREET
MANHATTAN
AlterationPermit Issued12/20/202401/27/2025Plumbing scope associated with the apt.7DF interior renovation. No change of use, egress or occupancy.
M01159834 ↗1223 LEXINGTON AVENUE
MANHATTAN
AlterationFiled — no permit on record01/08/2025——
M00486057 ↗301 EAST 48 STREET
MANHATTAN
AlterationSigned-off03/22/202109/25/2024HEREBY FILING APARTMENT COMBINATION PER PROVISIONS OF TPPN 3/1997. NO CHANGE IN USE EGRESS OR OCCUPANCY. PLUMBING APPLICATION BEING FILED IN…
M00888132 ↗25 HARRISON STREET
MANHATTAN
AlterationSigned-off06/22/202309/25/2024Interior demo and installation of partitions & finishes on the ground floor of the existing Retail 1 and 2 spaces as per plans. No change of…
B00952166 ↗135 PLYMOUTH STREET
BROOKLYN
AlterationPermit Issued11/21/202308/01/2024THIS APPLICATION IS FOR INTERIOR WORK ONLY ON THE GROUND FLOOR OF 11 ADAMS STREET INCLUDING THE INSTALLATION OF PARTITIONS AND FINISHES. NO …
M01004122 ↗120 CABRINI BOULEVARD
MANHATTAN
AlterationSigned-off03/04/202405/15/2024This application is filed for the Combination and Interior Renovation of apartments 65/65 associated with the PL scope of work. No change i…
M00495036 ↗151 WEST 30 STREET
MANHATTAN
AlterationSigned-off08/08/202205/14/2024Structural scope renovation of the cellar and 001Floor levels associated with the new restaurant. The change of use, and occupancy is filed …
Q00328563 ↗102-07 ALSTYNE AVENUE
QUEENS
AlterationSigned-off05/27/202004/23/2024APPLICATION IS FILED TO LEGALIZE THE EXISTING PLUMBING WORK CONDITIONS AND TO RESOLVE THE ECB VIOLATION#035406587X (DOB VIOLATION#05302019C0…
X00972893 ↗3935 BLACKSTONE AVENUE
BRONX
AlterationSigned-off01/11/202403/26/2024This application is filed for the Combination and Interior renovation of apartments 1E and 1 F associated with the GC scope of work. No cha…
M01000346 ↗74 READE STREET
MANHATTAN
AlterationFiled — no permit on record03/21/2024——
M00750415 ↗86 BEDFORD STREET
MANHATTAN
AlterationPermit Issued06/16/202203/14/2024PLUMBING WORK ON THE GROUND AND CELLAR FLOORS OF THE EXISTING RESTAURANT INCLUDING THE NEW GAS-FIRED EQUIPMENT CONNECTED TO EXISTING GAS PIP…
M00891934 ↗120 CABRINI BOULEVARD
MANHATTAN
AlterationSigned-off07/24/202303/08/2024PLUMBING SCOPE ASSOCIATED WITH INTERIOR RENOVATION OF APT.51, INCLUDING BATHROOMS RENOVATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00680525 ↗438 WEST 37 STREET
MANHATTAN
AlterationSigned-off03/01/202201/03/2024Plumbing and sprinkler work associated with apt.12D. No change of use, egress, or occupancy.
M08041708 ↗20 WEST 72 STREET
MANHATTAN
AlterationSigned-off12/07/202212/20/2023PROPOSE TO COMBINE TWO APARTMENTS 303 AND 304 PURSUANT TO TPPN 3/97 MINOR REMOVALS AND DISPOSAL OF PARTITIONS, GENERAL CONSTRUCTION AS PER P…
M00584093 ↗301 EAST 48 STREET
MANHATTAN
AlterationSigned-off10/12/202110/31/2023Cap and remove one gas range. Installation of 4 new plumbing fixtures. Tub, Shower, Lavatory, Toilet.
Q00193868 ↗56-11 197 STREET
QUEENS
AlterationSigned-off07/22/201910/27/2023New sprinkler on cellar floor, first floor, second floor and attic space.
M08029400 ↗20 WEST 72 STREET
MANHATTAN
AlterationSigned-off12/14/202207/19/2023Installation of new bathroom fixtures and new kitchen sink with piping in apartments 303 and 304.
M00561002 ↗100 OVERLOOK TERRACE
MANHATTAN
AlterationSigned-off08/25/202105/17/2023Minor Plumbing, cap and remove kitchen fixtures, replacement and Installation of bathroom fixtures, in conjunction with apartment combinati…
M00649569 ↗871 WEST END AVENUE
MANHATTAN
AlterationSigned-off02/25/202204/05/2023Plumbing work associated with apt.5G renovation, including but not limited: relocate: 1 DW, 1 SINK; replace: 2 WC, 2 LAV, 1 TUB. The archite…
B08009604 ↗1351 PACIFIC STREET
BROOKLYN
AlterationSigned-off10/04/202202/09/2023PLUMBING WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF THE EXISTING SINGLE-FAMILY DWELLING, INCL. REPLACEMENT OF SOME PL FIXTURES, REMOVAL…
M00682867 ↗4 COLUMBUS CIRCLE
MANHATTAN
AlterationPermit Issued03/11/202202/06/2023General construction on the 5th floor (New Hope Fertility Center) as indicated on drawings
M00726155 ↗120 CABRINI BOULEVARD
MANHATTAN
AlterationPermit Issued05/20/202201/11/2023PLUMBING WORK ASSOCIATED WITH THE INTERIOR RENOVATION AND COMBINATION OF UNITS 21 AND 29 AS PER PLANS SUBMITTED HEREWITH.
M00780168 ↗151 WEST 30 STREET
MANHATTAN
No WorkFiled — no permit on record12/20/2022——
M00749957 ↗350 BLEECKER STREET
MANHATTAN
AlterationSigned-off07/18/202210/25/2022Interior renovation only in the existing apartment #1M including the installation of partitions and finishes. No change in use, egress, or o…
M00749961 ↗350 BLEECKER STREET
MANHATTAN
AlterationSigned-off07/18/202210/21/2022Plumbing work associated with apartment 1M renovation, including but not limited to: relocate 1 DW and 1 SINK; replace 1 GAS RANGE and 1 LAV…
B00469069 ↗333 3 STREET
BROOKLYN
AlterationSigned-off03/29/202105/18/2022HEREBY FILING INTERIOR RENOVATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. The application is filed in conjunction with DOB NOW plumbing app…
B00672304 ↗652 KENT AVENUE
BROOKLYN
AlterationPermit Issued02/15/202203/10/2022Herewith filing tenant fit out interior renovation of suite 602. Installation of non-loading bearing partitions and finishes. No change in…
Q00107482 ↗56-11 197 STREET
QUEENS
AlterationPermit Issued03/13/201903/09/2022Installation of an 8' tall plywood construction fence.
M00618456 ↗238 EAST 62 STREET
MANHATTAN
AlterationFiled — no permit on record11/02/2021——
M00559256 ↗100 OVERLOOK TERRACE
MANHATTAN
AlterationSigned-off08/25/202110/21/2021HEREBY FILING APARTMENT COMBINATION PER PROVISIONS OF TPPN 3/1997. NO CHANGE IN USE EGRESS OR OCCUPANCY. PLUMBING APPLICATION BEING FILED IN…
Q00580220 ↗56-11 197 STREET
QUEENS
AlterationFiled — no permit on record09/24/2021——
B00584888 ↗652 KENT AVENUE
BROOKLYN
AlterationPermit Issued09/01/202109/15/2021Proposal work includes construction of new non-bearing partition walls, painting, plaster and glazing to accommodate tenant fit out. No chan…
M00533917 ↗25-00 FDR DRIVE
MANHATTAN
AlterationPermit Issued06/18/202107/28/2021Interior renovation of the existing offices, including removal of non-bearing partitions and installation of new non-bearing partitions, new…
B00471961 ↗333 3 STREET
BROOKLYN
AlterationSigned-off03/29/202107/21/2021HEREBY FILING PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. APPLICATION IS FILED ALONGSIDE GENERAL CONSTRUCTION APPLIC…
M00472008 ↗84 HUDSON STREET
MANHATTAN
AlterationSigned-off03/26/202104/28/2021HEREBY FILING PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. APPLICATION IS BEING FILED IN CONJUNCTION WITH GENERAL CON…
M00470194 ↗84 HUDSON STREET
MANHATTAN
AlterationSigned-off03/26/202104/16/2021HEREBY FILING INTERIOR RENOVATION AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. APPLICATION IS BEING FILED IN CONJUNCTION WITH PLUMB…
M00296153 ↗61 WEST 9 STREET
MANHATTAN
AlterationSigned-off03/20/202011/05/2020Minor plumbing to be completed in apartment 4A, as per plans. No change in use, egress occupancy.
M00122008 ↗251 EAST 33 STREET
MANHATTAN
AlterationSigned-off02/04/201902/06/2019Installation of a plywood construction fence. No change of egress, use or occupancy
Scope of Work
HVAC — 2 jobs · most recent 11/13/2025
Heating and Air Conditioning Systems Ventilation Systems
Sprinkler / Standpipe — 3 jobs · most recent 02/09/2026
No specific sub-scope on file — job count only.
Plumbing — 8 jobs · most recent 02/09/2026
Water/Sanitary Gas
Structural — 1 job · most recent 09/24/2021
Concrete Masonry
Earthwork — 1 job · most recent 08/21/2025
Tenant Protection Plan 72 Hour
Every person filing for this firm, identified by their DOB NOW contact id (one id is one person). A person is listed under the firm they file for most.
PersonFilingsMost recent
John Kim5105/22/2026
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
M.A. RUBIANO, P.E., P.C.502/09/2026
GABOR SZAKAL CONSULTING ENGINEERS107/28/2021
KENDALL ENGINEERING PC108/08/2023
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
CASTLE VILLAGE OWNERS308/01/2025
FIRST SERVICE RESIDENTIAL201/06/2025
102 EAST 30TH STREET LLC102/04/2019
333 Third Street Corp103/29/2021
AKAM ASSOCIATES, INC.110/15/2024
DOM BEN REALTY CORP.111/13/2025
FLUSHING COMMONS PROPERTY OWNER LLC108/22/2022
FORTITUDE CAPITAL LLC108/08/2023
HUDSON STREET OWNERS CORP.103/26/2021
NGKF103/11/2022
ORSID REALTY CORP101/22/2021
RFR REALTY LLC102/09/2026
SMD CONSTRUCTION GROUP INC.109/24/2021
WATERSIDE PLAZA LLC107/28/2021
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
NYCCODE LLC1902/09/2026
CORNERSTONE CONSULTING301/04/2022
ARCHETYPE CONSULTANTS, INC.103/11/2022
▾Documents — 478 on file (BIS + DOB NOW)
▸Plans & Drawings97
▸DOB NOWPlans/Sketch81
09/04/2026M00486057-P1Request digital key ↗
09/04/2026M00486057-I1Request digital key ↗
09/04/2026M00486057-P2Request digital key ↗
Showing 3 of 81 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/04/2026M00296153-I1Request digital key ↗
09/04/2026M00472008-I1Request digital key ↗
09/01/2026B00471961-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/23/2026Q00193868-P2Request digital key ↗
08/23/2026Q00193868-I1Request digital key ↗
08/15/2026Q00193868-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly3
09/01/2026M00780168-I1Request digital key ↗
08/14/2026M00780168-P1Request digital key ↗
09/01/2026M00780168-I1Open ↗
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00470194-I1Request digital key ↗
09/01/2026B00469069-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing Legalization1
08/24/2026Q00328563-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00122008-I1Request digital key ↗
▸Applications & Permits25
▸DOB NOWLPC Approval/Permit25
08/13/2026M00749957-I1Open ↗
08/13/2026M01000346-I1Open ↗
08/13/2026M00649569-S1Open ↗
Showing 3 of 25 on file for this type
▸Seals & Professional Certifications245
▸DOB NOWDPL-1: Design Professional Seal & Signature90
09/05/2026M00122008-I1Open ↗
09/04/2026M00296153-P1Open ↗
09/04/2026M00296153-P3Open ↗
Showing 3 of 90 on file for this type
▸DOB NOWProgress Inspector Seal & Signature80
09/27/2026B00952166-S1Open ↗
09/12/2026M00495036-I1Open ↗
09/12/2026M00495036-I1Open ↗
Showing 3 of 80 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature75
09/27/2026B00952166-S1Open ↗
09/27/2026B00952166-S1Open ↗
09/27/2026B00952166-S1Open ↗
Showing 3 of 75 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWTenant Protection Plan5
08/13/2026Q00328563-I1Open ↗
08/13/2026M00296153-P3Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWHPD-1: Anti-Harassment Area Checklist3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos78
▸DOB NOWDEP ACP-5: Asbestos Assessment Report73
09/04/2026M00470194-I1Open ↗
09/03/2026M00584093-I1Open ↗
09/03/2026M00618456-I1Open ↗
Showing 3 of 73 on file for this type
▸DOB NOWOER: Notice of Satisfaction2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWOER: Notice to Proceed2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/04/2026M00296153-I1Open ↗
▸Energy Compliance7
▸DOB NOWEN2: As Built Energy Analysis.6
08/24/2026Q00328563-S2Open ↗
08/13/2026B00469069-I1Open ↗
08/13/2026M00486057-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs2
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/13/2026B00672304-I1Open ↗
08/13/2026B00584888-I1Open ↗
▸Other Documents16
▸DOB NOWProof of Historic Building12
08/13/2026M01000346-I1Open ↗
08/13/2026M00649569-I1Open ↗
08/13/2026M01106608-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWLoft Board Certificate4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type