← Back
Design Firm
STADT ARCHITECTURE
Design
3 projects with open permitsMANHATTAN · 6BROOKLYN · 2
8 buildings
13
Total Filings
8
Projects on File
8
Buildings Worked
3
Projects w/ Open Permits
Design
Role
Activity
Projects by first filing month8 projects all-time
0112Aug '19 · 1Jun '21 · 1Jul '21 · 1Jan '22 · 1May '22 · 1Apr '23 · 1May '23 · 1Aug '23 · 12020202120222023
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit338%
Signed off562%
By project type
Alteration8
Most active buildings
All buildings →
468 BROOME STREETMANHATTAN · latest 07/01/2021
1 projects
419 BLEECKER STREETMANHATTAN · latest 01/07/2022
1 projects
781 5 AVENUEMANHATTAN · 1 open · latest 07/07/2023
1 projects
177 EAST 74 STREETMANHATTAN · 1 open · latest 02/04/2026
1 projects
1623 3 AVENUEMANHATTAN · 1 open · latest 05/18/2023
1 projects
7 HUBERT STREETMANHATTAN · latest 07/11/2023
1 projects
Key relationships
Everyone →
Design firms
Filing representatives
Owners
CHRISTOPHER KITTERMANlatest 08/09/2023
9 filings
Filed under
STADT ARCHITECTURE13
Identified by the contact ids of the people who file for the firm and by its email domain (stadtarchitecture.com), not by matching names.
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00871009 ↗177 EAST 74 STREET
MANHATTAN
AlterationPermit Issued05/22/202302/04/2026
Filer RPO INC.
REPLACE PLUMBING FIXTURES AS PER PLANS.
B00917123 ↗555 WASHINGTON AVENUE
BROOKLYN
AlterationSigned-off08/14/202304/26/2024
Filer RPO INC.
REPLACE PLUMBING FIXTURES RELATED TO INTERIOR RENOVATIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00723646 ↗7 HUBERT STREET
MANHATTAN
AlterationSigned-off05/09/202207/11/2023
Filer RPO INC.
Renovation to existing family dwelling. No change to use, egress or occupancy.
M00645801 ↗781 5 AVENUE
MANHATTAN
AlterationPermit Issued01/04/202207/07/2023
Filer RPO INC.
Herewith filing for interior renovation in apt 101. No change to use, egress or occupancy.
M00854482 ↗1623 3 AVENUE
MANHATTAN
AlterationPermit Issued04/10/202305/18/2023REPLACE PLUMBING FIXTURES FOR EXISTING APARTMENT. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00563467 ↗419 BLEECKER STREET
MANHATTAN
AlterationSigned-off07/29/202101/07/2022PLUMBING FIXTURES IN APT 5P ON THE 5TH FLOOR FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Counts cover all 8 projects (8 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Every person filing for this firm, identified by their DOB NOW contact id (one id is one person). A person is listed under the firm they file for most.
PersonFilingsMost recent
CHRISTOPHER KITTERMAN908/09/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ALNOUR CONSULTING110/04/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
JOHN HUMMEL CUSTOM BLD IN304/13/2023
ORCHESTER MANAGEMENT CO310/04/2023
GOLDS PLUMBING CORP205/22/2023
L&J PLG & HTG CO OF NY IN210/04/2023
JOHN FITZGERALD PLBG &HTG105/22/2023
ROGAN CONS. GROUP LLC106/22/2021
STANLEY LEWIS CONTR, CORP108/15/2019
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
712 HUBERT, LLC105/09/2022
Building Equity Management LLC108/01/2021
KINHOUSE106/22/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
RPO INC.410/04/2023
CLARKE CONSTRUCTION CONSULTANTS208/01/2021
8 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 8Open permit 3Signed off 5
8 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00871009 ↗177 EAST 74 STREET
MANHATTAN
AlterationPermit Issued05/22/202302/04/2026
Filer RPO INC.
REPLACE PLUMBING FIXTURES AS PER PLANS.
B00917123 ↗555 WASHINGTON AVENUE
BROOKLYN
AlterationSigned-off08/14/202304/26/2024
Filer RPO INC.
REPLACE PLUMBING FIXTURES RELATED TO INTERIOR RENOVATIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00723646 ↗7 HUBERT STREET
MANHATTAN
AlterationSigned-off05/09/202207/11/2023
Filer RPO INC.
Renovation to existing family dwelling. No change to use, egress or occupancy.
M00645801 ↗781 5 AVENUE
MANHATTAN
AlterationPermit Issued01/04/202207/07/2023
Filer RPO INC.
Herewith filing for interior renovation in apt 101. No change to use, egress or occupancy.
M00854482 ↗1623 3 AVENUE
MANHATTAN
AlterationPermit Issued04/10/202305/18/2023REPLACE PLUMBING FIXTURES FOR EXISTING APARTMENT. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00563467 ↗419 BLEECKER STREET
MANHATTAN
AlterationSigned-off07/29/202101/07/2022PLUMBING FIXTURES IN APT 5P ON THE 5TH FLOOR FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00532168 ↗468 BROOME STREET
MANHATTAN
AlterationSigned-off06/22/202107/01/2021
Owner KINHOUSE
INTERIOR DEMO ON THE 2ND FL. NO CHANGE TO USE, OCCUPANCY OR EGRESS
B00196659 ↗100 REMSEN STREET
BROOKLYN
AlterationSigned-off08/15/201905/03/2021PLUMBING WORK. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
Scope of Work
Plumbing — 1 project · most recent 05/22/2023
Gas Water/Sanitary
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
555 WASHINGTON AVENUE ↗308/09/2023
177 EAST 74 STREET ↗205/05/2023
7 HUBERT STREET ↗104/21/2022
781 5 AVENUE ↗112/10/2021
419 BLEECKER STREET ↗207/29/2021
468 BROOME STREET ↗106/01/2021
1623 3 AVENUE ↗2—
100 REMSEN STREET ↗1—
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch12
09/02/2026M00723646-I1 · 7 HUBERT STREETRequest digital key ↗
08/31/2026M00854482-I1 · 1623 3 AVENUERequest digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
08/13/2026M00563467-S1 · 419 BLEECKER STREETOpen ↗
08/13/2026M00645801-I1 · 781 5 AVENUEOpen ↗
08/13/2026M00723646-I1 · 7 HUBERT STREETOpen ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications32
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/03/2026M00645801-I1 · 781 5 AVENUEOpen ↗
08/27/2026B00917123-I1 · 555 WASHINGTON AVENUEOpen ↗
08/27/2026B00917123-S1 · 555 WASHINGTON AVENUEOpen ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/28/2026M00723646-I1 · 7 HUBERT STREETOpen ↗
09/01/2026B00917123-I1 · 555 WASHINGTON AVENUEOpen ↗
09/01/2026B00917123-I1 · 555 WASHINGTON AVENUEOpen ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B00917123-I1 · 555 WASHINGTON AVENUEOpen ↗
09/01/2026B00917123-I1 · 555 WASHINGTON AVENUEOpen ↗
08/31/2026M00645801-I1 · 781 5 AVENUEOpen ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist1
08/13/2026M00645801-I1 · 781 5 AVENUEOpen ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00196659-I1 · 100 REMSEN STREETOpen ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/27/2026B00917123-S1 · 555 WASHINGTON AVENUEOpen ↗
08/15/2026B00917123-I1 · 555 WASHINGTON AVENUEOpen ↗
08/15/2026M00645801-I1 · 781 5 AVENUEOpen ↗
Showing 3 of 13 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00563467-I1 · 419 BLEECKER STREETOpen ↗
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026M00645801-I1 · 781 5 AVENUEOpen ↗