← Back
Design Firm
COLLABORATIVE ENGINEERING OFFICE
Design
2 projects with open permitsBROOKLYN · 5MANHATTAN · 1
4 buildings
9
Total Filings
6
Projects on File
4
Buildings Worked
2
Projects w/ Open Permits
Design
Role
Activity
Projects by first filing month6 projects all-time
0123Oct '23 · 1Mar '24 · 2Nov '24 · 1Apr '25 · 1Mar '26 · 1Oct '23Jan '24Apr '24Jul '24Oct '24Jan '25Apr '25Jul '25Oct '25Jan '26Mar '26
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit233%
Signed off350%
Filed only117%
By project type
Alteration5
Alteration CO1
Most active buildings
All buildings →
195 WAVERLY AVENUEBROOKLYN · 1 open · latest 08/06/2026
2 projects
160 IMLAY STREETBROOKLYN · latest 10/08/2024
2 projects
85 FRANKLIN STREETMANHATTAN · 1 open · latest 06/05/2025
1 projects
115 NORTH 5 STREETBROOKLYN · latest 12/05/2023
1 projects
Key relationships
Everyone →
Filing representatives
Owners
1 projects
SIMON LOOIlatest 02/09/2026
8 filings
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B01207912 ↗195 WAVERLY AVENUE
BROOKLYN
AlterationPermit Issued04/22/202508/06/2026
Contractor HARD SAFARI CORP
STRUCTURAL REPAIR OF 1ST FLOOR CONCRETE SLAB ANDELEVATOR RETROFIT. NO CHANGE OF USE OR OCCUPANCY.
B01357182 ↗195 WAVERLY AVENUE
BROOKLYN
Alteration COFiled — no permit on record03/19/2026——
M01099769 ↗85 FRANKLIN STREET
MANHATTAN
AlterationPermit Issued11/10/202406/05/2025
Contractor HARD SAFARI CORP
Plumbing work filed in conjunction with renovation of existing commercial space. No change in use, occupancy, or egress.
B01012730 ↗160 IMLAY STREET
BROOKLYN
AlterationSigned-off03/13/202410/08/2024PROPOSE PLUMBING & SPRINKLER WORK IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01012432 ↗160 IMLAY STREET
BROOKLYN
AlterationSigned-off03/13/202404/16/2024PROPOSE MECHANICAL WORK IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00939623 ↗115 NORTH 5 STREET
BROOKLYN
AlterationSigned-off10/18/202312/05/2023PROPOSE MECHANICAL WORK IN CONJUCNTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Counts cover all 6 projects (6 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Every person filing for this firm, identified by their DOB NOW contact id (one id is one person). A person is listed under the firm they file for most.
PersonFilingsMost recent
SIMON LOOI802/09/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
MC WORK ARCHITECTURE, PLLC203/19/2026
DAVID KEANE P.E., P.C.102/27/2026
NEIL LOGAN ARCHITECT PC111/10/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
HARD SAFARI CORP202/27/2026
K.O.S. PLUMBING&HEATING,I202/27/2026
212 RENOVATIONS GROUP LLC110/18/2023
H.K. MECHANICAL SVC CORP108/08/2024
ORBIT SPRINKLER CORP108/08/2024
R&S ELITE CONSTRUCTION103/13/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
85 FRANKLIN LLC111/10/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
BMB BUILDING CONSULTING INC.308/08/2024
ADAM MAISER203/19/2026
JM ZONING, LLC.111/10/2024
6 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 6Open permit 2Signed off 3Filed only 1
Any typeAlteration 5Alteration CO 1
6 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B01207912 ↗195 WAVERLY AVENUE
BROOKLYN
AlterationPermit Issued04/22/202508/06/2026
Contractor HARD SAFARI CORP
STRUCTURAL REPAIR OF 1ST FLOOR CONCRETE SLAB ANDELEVATOR RETROFIT. NO CHANGE OF USE OR OCCUPANCY.
B01357182 ↗195 WAVERLY AVENUE
BROOKLYN
Alteration COFiled — no permit on record03/19/2026——
M01099769 ↗85 FRANKLIN STREET
MANHATTAN
AlterationPermit Issued11/10/202406/05/2025
Contractor HARD SAFARI CORP
Plumbing work filed in conjunction with renovation of existing commercial space. No change in use, occupancy, or egress.
B01012730 ↗160 IMLAY STREET
BROOKLYN
AlterationSigned-off03/13/202410/08/2024PROPOSE PLUMBING & SPRINKLER WORK IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01012432 ↗160 IMLAY STREET
BROOKLYN
AlterationSigned-off03/13/202404/16/2024PROPOSE MECHANICAL WORK IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00939623 ↗115 NORTH 5 STREET
BROOKLYN
AlterationSigned-off10/18/202312/05/2023PROPOSE MECHANICAL WORK IN CONJUCNTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Scope of Work
Plumbing — 1 project · most recent 11/10/2024
Water/Sanitary
Electrical — 2 projects · most recent 05/10/2026
General Wiring
Structural — 1 project · most recent 02/27/2026
Steel Concrete Masonry
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
195 WAVERLY AVENUE ↗202/09/2026
85 FRANKLIN STREET ↗208/29/2024
160 IMLAY STREET ↗308/05/2024
115 NORTH 5 STREET ↗209/26/2023
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/25/2026B01012730-I1 · 160 IMLAY STREETRequest digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/13/2026M01099769-I1 · 85 FRANKLIN STREETOpen ↗
08/13/2026M01099769-S2 · 85 FRANKLIN STREETOpen ↗
08/13/2026M01099769-S1 · 85 FRANKLIN STREETOpen ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026B01357182-I1 · 195 WAVERLY AVENUEOpen ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026B01357182-I1 · 195 WAVERLY AVENUEOpen ↗
▸Seals & Professional Certifications45
▸DOB NOWSpecial Inspector Seal & Signature21
09/01/2026B01207912-S2 · 195 WAVERLY AVENUEOpen ↗
09/01/2026B01207912-S2 · 195 WAVERLY AVENUEOpen ↗
09/01/2026B01207912-S2 · 195 WAVERLY AVENUEOpen ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/03/2026B01357182-S1 · 195 WAVERLY AVENUEOpen ↗
08/25/2026B01012730-I1 · 160 IMLAY STREETOpen ↗
08/25/2026B01012432-I1 · 160 IMLAY STREETOpen ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B01207912-S2 · 195 WAVERLY AVENUEOpen ↗
09/01/2026B01207912-S2 · 195 WAVERLY AVENUEOpen ↗
09/01/2026B01207912-P1 · 195 WAVERLY AVENUEOpen ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/17/2026B01357182-I1 · 195 WAVERLY AVENUEOpen ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/25/2026B01012730-I1 · 160 IMLAY STREETOpen ↗
08/25/2026B01012432-I1 · 160 IMLAY STREETOpen ↗
08/13/2026M01099769-S2 · 85 FRANKLIN STREETOpen ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/03/2026B01357182-S1 · 195 WAVERLY AVENUEOpen ↗
08/17/2026B01357182-S1 · 195 WAVERLY AVENUEOpen ↗
Showing 2 of 3 on file for this type
▸Other Documents6
▸DOB NOWProof of Historic Building2
08/13/2026M01099769-I1 · 85 FRANKLIN STREETOpen ↗
Showing 1 of 2 on file for this type
▸DOB NOWProperty Ownership Certification1
08/17/2026B01357182-I1 · 195 WAVERLY AVENUEOpen ↗
▸DOB NOWPlot Diagram1
08/17/2026B01357182-I1 · 195 WAVERLY AVENUEOpen ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026B01357182-I1 · 195 WAVERLY AVENUEOpen ↗
▸DOB NOWSite Survey: Initial1
08/17/2026B01357182-I1 · 195 WAVERLY AVENUEOpen ↗