Condo, residential tower (mixed-use, multi-family elevator) [derived]
New York Dock Condominium
160 IMLAY STREET · BIN 3336460
💬 Discuss this project
2021Year Built
7Stories
RMBuilding Class
M2-1Zoning
172,199 sfGross Floor Area
82Units
LL97 CoveredRent Stabilized26 Open Violations 25 unresolved · 1 paperwork only ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: THE NEW YORK DOCK BUILDING CONDOMINIUM · 61,500 sf lot · 2.8 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof5p · 5 filings · 20 docs
BulkheadUnder Construction1p · 1 filing · 6 docs
Floor 6Under Construction48p · 8 filings · 20 docs
Floor 55p · 3 filings · 19 docs
Floor 4
Floor 3
Floor 21p · 1 filing · 2 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MIKSPACE HOLDINGS108/28/2026
BUILDING EQUITY MGMT408/08/2026
FIRSTSERVICE RESIDENTIAL1007/08/2026
OWNERS REP1204/09/2026
HKS CONSTRUCTION CORP503/22/2026
TO THE OWNER OF 160 IMLAY103/22/2026
HAILEY DEVELOPMENT GROUP1403/22/2026
XIA GENERAL CONTRACTING I403/22/2026
BOROUGH CONSTRUCTION203/22/2026
110 INDUSTRY ASSOCIATES203/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN LIGHT EXPEDITING LLC803/21/2026
ELCHERBINI ARCHITECTS P.C.2003/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
BMB BUILDING CONSULTING803/21/2026
J A EXPEDITING603/21/2026
MUNICIPAL BUILDING CONSULTANTS1603/21/2026
SPEEDY EXPEDITING803/21/2026
THE GREEN STUDIO203/21/2026
CODE803/21/2026
ANTHONY MORALI ARCHITECT PLLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L.V. REMODELING LLCGeneral Contractor1507/05/2026
UKI RENOVATION CORPGeneral Contractor707/08/2026
GOOD NEWS AUBURN SUN CORPGeneral Contractor607/08/2026
A.R.L. PLUMBING & HTG LLCPlumbing507/08/2026
R&S ELITE CONSTRUCTIONGeneral Contractor507/08/2026
GWT ENTERPRISES INCGeneral Contractor504/09/2026
H.K. MECHANICAL SVC CORPPlumbing307/08/2026
HKS CONSTRUCTION CORPGeneral Contractor303/21/2026
MANHATTAN D ENTERPRISESGeneral Contractor303/21/2026
PARK USA DESIGN & REMODELGeneral Contractor303/21/2026
RYSZARD & SON CONSTRUCTIOGeneral Contractor303/21/2026
AP PLUMBING & HVAC LLCPlumbing307/08/2026
PALONE BROTHERS AIRGeneral Contractor203/21/2026
I.D.K. ELECTRIC CO., INC.Electrical203/22/2026
DENNIS KENNELLYElectrical203/21/2026
GENESIS PLBG AND HTG CORPPlumbing207/08/2026
URIM SYLAElectrical203/21/2026
DDS MECHANICAL FPS CORPFire Protection207/08/2026
AG CONTRACTORS INCGeneral Contractor206/28/2026
PLATINUM SERVICES NY LLCGeneral Contractor104/09/2026
ROYAL HVAC SYSTEMS INCGeneral Contractor107/08/2026
DENMAR ELECTRIC CORPElectrical103/22/2026
A.M.N. CORPORATIONPlumbing108/27/2026
RE-CON ELECTRIC INCElectrical103/22/2026
ROBERT MARCHISOTTOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC SPECIAL INSPECTIONS83551008/23/2026
SONI ENGINEERING CONSULTI9819107/24/2026
ANZ CONSULTING ENGINEERIN3946711/11/2025
EP INSPECTIONS AND COMMIS7079409/16/2025
STEEL CORE ENGINEERING PL1098408/08/2024
LEO Y LEE ASSOCIATES2481403/02/2023
JON POWELL ARCHITECTURE P7806103/02/2023
SKYLINE ENGINEERING, PLLC267402/15/2023
KENDALL ENGINEERING PC4154111/15/2022
Building Lifecycle
All (300)Filed (55)Permit Issued (48)Signed Off (14)Violation (44)Inspection (31)Objection (78)Special Inspection (30)
09/11/2026
Signed off — Alteration
Mechanical work associated with apartment 5A3 interior renovation. No change in use, egress or occupancy.
B01171271-I1
08/26/2026
Permit issued — Plumbing
B01173426-S2-PL
08/26/2026
Violation issued (ECB, open)
Construction
08/23/2026
Filed — Alteration
Remove and install plumbing fixtures and install electric range as per plans for existing apartment 5A2. No change in egress, occupancy or use is involved under this application.
B01314615-P1
08/23/2026
Special inspection requirement — Final
ABDALLAH ELCHERBINI
08/23/2026
Special inspection requirement — Maintenance information
ABDALLAH ELCHERBINI
08/23/2026
Special inspection requirement — Mechanical Systems
ABDALLAH ELCHERBINI
08/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
ABDALLAH ELCHERBINI
08/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ABDALLAH ELCHERBINI
08/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
08/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
ABDALLAH ELCHERBINI
08/23/2026
Special inspection requirement — Duct leakage testing, insulation and design
ABDALLAH ELCHERBINI
08/23/2026
Special inspection requirement — Energy Code Compliance Inspections
ABDALLAH ELCHERBINI
08/14/2026
Objection resolved — Resolved
08/07/2026
Permit issued — Suspended Scaffold
B01435984-I1-SC
07/30/2026
Permit issued — Sidewalk Shed
B01415973-I1-SH
07/27/2026
Objection raised — Cost
07/24/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
B01435984-I1
07/24/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
07/24/2026
Special inspection requirement — Post-installed Anchors
nayan soni
07/23/2026
Filed — Alteration
INTERIOR REMODELING OF THE COMMERCIALSPACE ON 2ND FLOOR OF MIXED USE BUILDING.NO CHANGE TO BULK, USE AND EGRESS.
B01424288-I1
07/22/2026
Signed off — Alteration
Mechanical work associated with apartment 5A3 interior renovation. No change in use, egress or occupancy.
B01171271-S2
07/21/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01415973-I1
06/30/2026
Special inspection requirement — Lighting controls
Anton Tihonichev
06/30/2026
Special inspection requirement — Interior lighting power
Anton Tihonichev
06/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/29/2026
Special inspection requirement — Final
06/26/2026
Permit issued — Mechanical Systems
B01173426-S1-MS
06/25/2026
Permit issued — General Construction
B01173426-I1-GC
05/29/2026
Filed — Alteration
Mechanical work associated with apartment 5A3 interior renovation. No change in use, egress or occupancy.
B01171271-P7
05/08/2026
Permit issued — Plumbing
B01171271-S1-PL
04/24/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/01/2026
Filed — Alteration
Mechanical work associated with apartment 5A3 interior renovation. No change in use, egress or occupancy.
B01171271-P6
04/01/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/01/2026
Special inspection requirement — Post-installed Anchors
ABDALLAH ELCHERBINI
04/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
03/17/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/11/2026
Filed — Alteration
Mechanical work associated with apartment 5A3 interior renovation. No change in use, egress or occupancy.
B01171271-P4
01/13/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/08/2026
Objection resolved — Addressed
01/08/2026
Objection resolved — Addressed
01/07/2026
Objection resolved — Addressed
01/02/2026
Permit issued — Sidewalk Shed
B00921907-I1-SH
12/26/2025
Objection raised — Admin
12/11/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/05/2025
Objection resolved — Addressed
12/03/2025
Permit issued — Plumbing
B01314615-I1-PL
12/02/2025
Objection raised — Admin
11/24/2025
Permit issued — Mechanical Systems
B01314615-S1-MS
11/21/2025
Permit issued — General Construction
B01268553-I1-GC
11/18/2025
Permit issued — Sidewalk Shed
B00921907-I1-SH
11/14/2025
Filed — Alteration
Remove and install plumbing fixtures and install electric range as per plans for existing apartment 5A2. No change in egress, occupancy or use is involved under this application.
B01314615-S1
11/13/2025
Filed — Alteration
Remove and install plumbing fixtures and install electric range as per plans for existing apartment 5A2. No change in egress, occupancy or use is involved under this application.
B01314615-I1
11/12/2025
Signed off — Alteration
B01057563-I1
11/12/2025
Special inspection requirement — Heating Systems
ABDALLAH ELCHERBINI
11/12/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
ABDALLAH ELCHERBINI
11/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
ABDALLAH ELCHERBINI
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedA.M.N. CORPORATION08/26/2026
DOB NOWSuspended ScaffoldPermit IssuedDEMARI SERVICES INC08/07/2026
DOB NOWSidewalk ShedPermit IssuedEMPIRE NY INSTALLATIONS INC07/30/2026
DOB NOWMechanical SystemsPermit IssuedAG CONTRACTORS INC06/26/2026
DOB NOWGeneral ConstructionPermit IssuedAG CONTRACTORS INC06/25/2026
DOB NOWPlumbingSigned-offA.R.L. PLUMBING & HTG LLC05/08/2026
DOB NOWSidewalk ShedPermit IssuedGWT ENTERPRISES INC01/02/2026
DOB NOWPlumbingSigned-offA.R.L. PLUMBING & HTG LLC12/03/2025
DOB NOWMechanical SystemsSigned-offL.V. REMODELING LLC11/24/2025
DOB NOWGeneral ConstructionSigned-offL.V. REMODELING LLC11/21/2025
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC11/18/2025
DOB NOWMechanical SystemsSigned-offL.V. REMODELING LLC08/20/2025
DOB NOWGeneral ConstructionSigned-offL.V. REMODELING LLC08/20/2025
DOB NOWMechanical SystemsSigned-offROYAL HVAC SYSTEMS INC04/14/2025
DOB NOWPlumbingSigned-offA.R.L. PLUMBING & HTG LLC04/14/2025
DOB NOWMechanical SystemsSigned-offL.V. REMODELING LLC04/11/2025
DOB NOWMechanical SystemsSigned-offL.V. REMODELING LLC04/10/2025
DOB NOWGeneral ConstructionSigned-offL.V. REMODELING LLC04/07/2025
DOB NOWSidewalk ShedPermit IssuedGWT ENTERPRISES INC01/07/2025
DOB NOWPlumbingSigned-offH.K. MECHANICAL SVC CORP10/08/2024
DOB NOWGeneral ConstructionSigned-offUKI RENOVATION CORP08/08/2024
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG08/05/2024
DOB NOWGeneral ConstructionSigned-offR&S ELITE CONSTRUCTION07/01/2024
DOB NOWGeneral ConstructionSigned-offUKI RENOVATION CORP06/21/2024
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP05/30/2024
DOB NOWSprinklersSigned-offH.K. MECHANICAL SVC CORP04/18/2024
DOB NOWGeneral ConstructionSigned-offR&S ELITE CONSTRUCTION04/16/2024
DOB NOWMechanical SystemsSigned-offR&S ELITE CONSTRUCTION04/16/2024
DOB NOWPlumbingSigned-offGENESIS PLBG AND HTG CORP04/10/2024
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG03/22/2024
DOB NOWGeneral ConstructionSigned-offGOOD NEWS AUBURN SUN02/07/2024
DOB NOWSprinklersSigned-offDDS MECHANICAL FPS CORP01/26/2024
DOB NOWSidewalk ShedPermit IssuedGWT ENTERPRISES INC01/10/2024
DOB NOWSidewalk ShedPermit IssuedMANHATTAN D ENTERPRISES08/23/2023
DOB NOWCurb CutPermit IssuedPARK USA DESIGN & REMODEL07/06/2023
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG03/30/2023
DOB NOWMechanical SystemsSigned-offPALONE BROTHERS AIR03/24/2023
DOB NOWGeneral ConstructionSigned-offGOOD NEWS AUBURN SUN03/03/2023
DOB NOWGeneral ConstructionSigned-offGOOD NEWS AUBURN SUN03/03/2023
DOB NOWSprinklersSigned-offDDS MECHANICAL FPS CORP02/07/2023
+ 59 more permits on file
6 projects · most recent 08/23/2026
Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/23/2026Signed-offL.V. REMODELING LLCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PEFY-P36NMAU-E4 36,000 BTU · Vrf Indoor ×4
05/29/2026Signed-offL.V. REMODELING LLCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PEFY-P18NMAU-E4 18,000 BTU · Vrf Indoor ×2
PEFY-P24NMAU-E4 2 tons · Vrf Indoor ×2
PEFY-P36NMAU-E4 3 tons · Vrf Indoor ×2
PURY-EP96TNU-A 8 tons · Vrf Outdoor ×2
11/11/2025——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MUZ-GL12NA 12,000 BTU · Condensing Unit ×1
PUHY-EP96TNU-A 96,000 BTU · Vrf Outdoor ×1
Ventilation
Panasonic FV-05-11VK2 100 CFM · Exhaust Fan ×3
09/16/2025Permit IssuedAG CONTRACTORS INCAir Conditioning Systems
Cooling
Mitsubishi Electric PFFY-P24NRMU-E 25,500 BTU · Vrf Indoor ×1
02/15/2024——Heating and Air Conditioning Systems
Heat / Cool
Lg ARUN060GSS4 60,000 BTU · Vrf Outdoor ×1
08/19/2022Permit IssuedUKI RENOVATION CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-SM60NAM-U 60,000 BTU · Heat Pump Outdoor ×2
PEFY-P12NMAU-E4 12,000 BTU · Vrf Indoor ×1
PEFY-P15NMAU-E4 15,000 BTU · Vrf Indoor ×1
PEFY-P36NMAI-E4 36,000 BTU · Vrf Indoor ×1
Heating
Mitsubishi Electric MXZ-SM60NAM-U 600,000 BTU · Condensing Unit ×2
Ventilation
Panasonic FV-10NLF1E 100 CFM · Exhaust Fan ×6
2 projects · most recent 09/16/2025
Sprinkler System
FiledStatusContractorScope
09/16/2025——Sprinkler System
05/24/2023——112 heads
6 projects · most recent 08/23/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/23/2026Signed-offA.R.L. PLUMBING & HTG LLCGas, Water/Sanitary
05/29/2026Signed-offA.R.L. PLUMBING & HTG LLCGas, Water/Sanitary
09/16/2025Permit IssuedA.M.N. CORPORATIONWater/Sanitary
02/15/2024——Gas, Water/Sanitary
05/24/2023——Gas, Water/Sanitary
08/19/2022Permit IssuedAPOLLO PLBG & HTG INCGas, Water/Sanitary
19 projects · most recent 07/27/2026
General Wiring
FiledStatusContractorScope
07/27/2026Permit IssuedMEGA ELEC'L CONTR'G, INC—
01/19/2026Permit IssuedUS1 ELECTRIC CORPGeneral Wiring
06/16/2025Permit IssuedUS1 ELECTRIC CORPGeneral Wiring
01/31/2025CompleteEIS ELECTRIC CORP DBAGeneral Wiring
09/26/2024Permit IssuedI.D.K. ELECTRIC CO., INC.General Wiring
04/25/2024CompleteNAPSTAR ELECTRIC INCGeneral Wiring
08/22/2023Permit IssuedSOLAS ELECTRICAL CORP—
07/11/2023CompleteADD ELECTRICAL CONTRG INCGeneral Wiring
02/09/2023Permit IssuedI.D.K. ELECTRIC CO., INC.General Wiring
10/09/2022Permit IssuedI.D.K. ELECTRIC CO., INC.General Wiring
09/10/2022CompleteDENMAR ELECTRIC CORPGeneral Wiring
11/03/2020Permit IssuedRE-CON ELECTRIC INCGeneral Wiring
10/08/2020CompleteRE-CON ELECTRIC INCGeneral Wiring
10/05/2020CompleteRE-CON ELECTRIC INCGeneral Wiring
10/01/2020CompleteANTONIO CERIELLO ELEC INC—
1 project · most recent 07/24/2026
FiledStatusContractorScope
07/24/2026Permit IssuedTOWER SERVICES INC1 scope_items
2 projects · most recent 07/21/2026
Sidewalk Shed
FiledStatusContractorScope
07/21/2026Permit IssuedEMPIRE NY INSTALLATIONS ISidewalk Shed
06/05/2024Permit IssuedGWT ENTERPRISES INCSidewalk Shed
1 project · most recent 07/24/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/24/2026Permit IssuedTOWER SERVICES INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 31
DateTypeResultReport
04/24/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/17/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/13/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/19/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/25/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/04/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
06/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/14/2023Fail-Final CND-Occupancy InspectionFailView ↗
06/29/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/02/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
Latest 25 of 31.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/23/2026Mechanical SystemsABDALLAH ELCHERBINIspecial
08/23/2026Energy Code Compliance InspectionsABDALLAH ELCHERBINIprogress
08/23/2026Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
08/23/2026Duct leakage testing, insulation and designABDALLAH ELCHERBINIenergy_progress
08/23/2026HVAC-R and service water piping design and insulationABDALLAH ELCHERBINIenergy_progress
08/23/2026Maintenance informationABDALLAH ELCHERBINIenergy_progress
08/23/2026HVAC-R and service water heating system controlsABDALLAH ELCHERBINIenergy_progress
08/23/2026HVAC-R and service water heating equipmentABDALLAH ELCHERBINIenergy_progress
08/23/2026FinalABDALLAH ELCHERBINIprogress
07/24/2026Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
07/24/2026Post-installed Anchorsnayan sonispecial
06/30/2026Tenant Protection Plan Compliance—special
06/30/2026Interior lighting powerAnton Tihonichevenergy_progress
06/30/2026Lighting controlsAnton Tihonichevenergy_progress
06/29/2026Final—progress
04/01/2026Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
04/01/2026Post-installed AnchorsABDALLAH ELCHERBINIspecial
11/12/2025HVAC-R and service water heating equipmentABDALLAH ELCHERBINIenergy_progress
11/12/2025Post-installed AnchorsABDALLAH ELCHERBINIspecial
11/12/2025Duct leakage testing, insulation and designABDALLAH ELCHERBINIenergy_progress
11/12/2025Maintenance informationABDALLAH ELCHERBINIenergy_progress
11/12/2025Ventilation and air distribution systemABDALLAH ELCHERBINIenergy_progress
11/12/2025FinalABDALLAH ELCHERBINIprogress
11/12/2025Fire-Resistance Rated ConstructionABDALLAH ELCHERBINIprogress
11/12/2025Energy Code Compliance InspectionsABDALLAH ELCHERBINIprogress
Latest 25 of 150.
▾Documents — 867 on file (BIS + DOB NOW)
▸Plans & Drawings55
▸DOB NOWPlans/Sketch54
09/02/2026B00096852-I1Request digital key ↗
08/28/2026B00793166-I1Request digital key ↗
08/28/2026B00795512-I1Request digital key ↗
Showing 3 of 54 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
09/02/2026B00269179-I1Request digital key ↗
▸Applications & Permits195
▸BISPLAN / WORK APPROVAL APPLICATION116
06/20/2025320517124Open ↗
06/17/2025320517124Open ↗
03/21/2025320517124Open ↗
Showing 3 of 116 on file for this type
▸BISWORK PERMIT APPLICATION69
09/22/2021320517124Open ↗
01/12/2021320517124Open ↗
10/27/2020320517124Open ↗
Showing 3 of 69 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1132
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
11/19/2019322004479Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZONING EXHIBIT I- CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications249
▸DOB NOWProgress Inspector Seal & Signature64
09/23/2026B01314615-P1Open ↗
09/23/2026B01314615-P1Open ↗
09/23/2026B01173426-S1Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature55
09/02/2026B00096852-I1Open ↗
08/28/2026B00793166-I1Open ↗
08/28/2026B00793094-I1Open ↗
Showing 3 of 55 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION54
12/06/2019321159820Open ↗
12/06/2019321159820Open ↗
12/06/2019320959496Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature38
09/23/2026B01314615-P1Open ↗
09/23/2026B01173426-S1Open ↗
09/23/2026B01173426-S1Open ↗
Showing 3 of 38 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
05/06/2020340727477Open ↗
11/19/2019322004479Open ↗
08/20/2019322009875Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
11/19/2019322004479Open ↗
08/20/2019322009875Open ↗
Showing 2 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
05/06/2020340727477Open ↗
Showing 1 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
05/06/2020340727477Open ↗
Showing 1 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment24
▸BISSCHEDULE B - PLUMBING13
10/28/2019320517124Open ↗
Showing 1 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
03/01/2023320517124Open ↗
12/07/2022321262646Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/20/2019322009875Open ↗
▸Safety & Tenant Protection4
▸BISDS1-Demolition Submittal Certification Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos37
▸DOB NOWDEP ACP-5: Asbestos Assessment Report31
08/28/2026B08031500-I1Open ↗
08/28/2026B00800723-I1Open ↗
08/27/2026B07995774-P2Open ↗
Showing 3 of 31 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
11/21/2019320517124Open ↗
11/21/2019320517124Open ↗
08/20/2019322009875Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
09/09/2020322009875Open ↗
05/06/2020340727477Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
05/06/2020340727477Open ↗
Showing 1 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/25/2023340727477Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/25/2023340727477Open ↗
▸BISEXTERIOR LIGHTING POWER1
07/25/2023340727477Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/06/2019320959496Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports28
▸BISTECHNICAL REPORT: RESPONSIBILITY16
09/09/2020322009875Open ↗
09/09/2020322009875Open ↗
09/09/2020322009875Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER6
07/29/2021320517124Open ↗
11/21/2019320517124Open ↗
11/21/2019320517124Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
11/20/2019320517124Open ↗
Showing 1 of 3 on file for this type
▸BISCONCRETE DESIGN MIX (TR-3) 27-6051
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
09/15/2022320517124Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
11/20/2019320517124Open ↗
▸Approvals, Objections & Sign-offs95
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST30
07/26/2023340727477Open ↗
02/28/2023321262646Open ↗
02/24/2021322009875Open ↗
Showing 3 of 30 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE21
06/20/2025320517124Open ↗
06/17/2025320517124Open ↗
08/18/2022320517124Open ↗
Showing 3 of 21 on file for this type
▸BISSUPERSEDING LETTER16
09/22/2021320517124Open ↗
07/11/2019320517124Open ↗
07/03/2019320517124Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
09/10/2020320517124Open ↗
09/24/2019320517124Open ↗
Showing 2 of 10 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBSA-CPC APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT23
05/06/2020340727477Open ↗
04/30/2020321306608Open ↗
02/11/2020320959496Open ↗
Showing 3 of 23 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
09/11/2023320517124Open ↗
07/25/2023340727477Open ↗
02/27/2023321262646Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms97
▸BISADDITIONAL INFORMATION37
07/23/2025320517124Open ↗
08/07/2023320517124Open ↗
07/25/2023340727477Open ↗
Showing 3 of 37 on file for this type
▸BISBOROUGH INTAKE FORM32
09/22/2021320517124Open ↗
10/27/2020320517124Open ↗
10/22/2020320517124Open ↗
Showing 3 of 32 on file for this type
▸BISEFILING COVER SHEET19
11/15/2019322004479Open ↗
08/20/2019322009875Open ↗
Showing 2 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
05/06/2020340727477Open ↗
Showing 1 of 9 on file for this type
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
04/30/2020321306608Open ↗
Showing 1 of 5 on file for this type
▸BISPLOT DIAGRAM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISBSA VARIANCE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISUnknown1
02/04/2020320517124Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSP/SD DEVICE CERT : LTR-LIC ELECT1
04/30/2020321306608Open ↗
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type