Design Collective Arch and Eng P.C.
Design
MANHATTAN · 5
2 buildings
5
Total Filings
5
Projects on File
2
Buildings Worked
0
Projects w/ Open Permits
Design
Role
Activity
Projects by first filing month5 projects all-time
0134May '25 · 3Jul '25 · 2May '25Jun '25Jul '25
Portfolio status
Browse projects →
Signed off5100%
By project type
Alteration5
Most active buildings
All buildings →
1251 AVENUE OF THE AMERMANHATTAN · latest 05/20/2025
3 projects
452 5 AVENUEMANHATTAN · latest 08/19/2025
2 projects
Key relationships
Everyone →
Filing representatives
Yue Sunlatest 06/13/2025
5 filings
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01241184 ↗452 5 AVENUE
MANHATTAN
AlterationSigned-off07/10/202508/19/2025Installation of one sprinkler head, relocate one sprinkler head. no change in use occupancy or egress
M01241170 ↗452 5 AVENUE
MANHATTAN
AlterationSigned-off07/10/202507/14/2025Installation of new CRAC unit for the newly renovated MDF room. Installation of fire damper on existing Heat Pump in the room. No change in …
M01211584 ↗1251 AVENUE OF THE AMER
MANHATTAN
AlterationSigned-off05/13/202505/20/2025Modifications to the existing Sprinkler System: Relocate (8) sprinkler heads and associated sprinkler piping on the 43rd Floor as per plans …
M01211544 ↗1251 AVENUE OF THE AMER
MANHATTAN
AlterationSigned-off05/13/202505/16/2025Install (1) new dishwasher and replace tailpiece and install new 3-way stop valve for pantry sink on the 43rd Floor as per plan (Ascot Insur…
M01211516 ↗1251 AVENUE OF THE AMER
MANHATTAN
AlterationSigned-off05/14/202505/14/2025Modifications to the existing HVAC System: Retrofit existing Mechanical system, rebalance and relocate air outlets, remove and install new t…
Counts cover all 5 projects (5 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Every person filing for this firm, identified by their DOB NOW contact id (one id is one person). A person is listed under the firm they file for most.
PersonFilingsMost recent
Yue Sun506/13/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ABCO-PEERLESS SPRKLR CORP105/13/2025
BEDROCK MECHANICAL INC107/10/2025
CLUNE CONSTRUCTION CO LP105/14/2025
PAR PLUMBING CO., INC105/13/2025
STRUCTURE TONE, LLC107/10/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
1251 AMERICAS ASSOCIATES II, L.P.305/14/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
RIZZO GROUP305/14/2025
A1 EXPEDITING SERVICE CORP.207/10/2025
5 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 5Signed off 5
5 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01241184 ↗452 5 AVENUE
MANHATTAN
AlterationSigned-off07/10/202508/19/2025Installation of one sprinkler head, relocate one sprinkler head. no change in use occupancy or egress
M01241170 ↗452 5 AVENUE
MANHATTAN
AlterationSigned-off07/10/202507/14/2025Installation of new CRAC unit for the newly renovated MDF room. Installation of fire damper on existing Heat Pump in the room. No change in …
M01211584 ↗1251 AVENUE OF THE AMER
MANHATTAN
AlterationSigned-off05/13/202505/20/2025Modifications to the existing Sprinkler System: Relocate (8) sprinkler heads and associated sprinkler piping on the 43rd Floor as per plans …
M01211544 ↗1251 AVENUE OF THE AMER
MANHATTAN
AlterationSigned-off05/13/202505/16/2025Install (1) new dishwasher and replace tailpiece and install new 3-way stop valve for pantry sink on the 43rd Floor as per plan (Ascot Insur…
M01211516 ↗1251 AVENUE OF THE AMER
MANHATTAN
AlterationSigned-off05/14/202505/14/2025Modifications to the existing HVAC System: Retrofit existing Mechanical system, rebalance and relocate air outlets, remove and install new t…
Scope of Work
Sprinkler / Standpipe — 1 project · most recent 05/13/2025
No specific sub-scope on file — project count only.
Plumbing — 1 project · most recent 05/13/2025
Water/Sanitary
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
452 5 AVENUE ↗206/13/2025
1251 AVENUE OF THE AMER ↗304/16/2025
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026M01211584-I1 · 1251 AVENUE OF THE AMEROpen ↗
08/22/2026M01241184-I1 · 452 5 AVENUEOpen ↗
08/22/2026M01241170-I1 · 452 5 AVENUEOpen ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026M01241170-I1 · 452 5 AVENUEOpen ↗
09/23/2026M01241184-I1 · 452 5 AVENUEOpen ↗
09/01/2026M01211584-I1 · 1251 AVENUE OF THE AMEROpen ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026M01241170-I1 · 452 5 AVENUEOpen ↗
09/23/2026M01241170-I1 · 452 5 AVENUEOpen ↗
08/27/2026M01211516-I1 · 1251 AVENUE OF THE AMEROpen ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026M01211584-I1 · 1251 AVENUE OF THE AMEROpen ↗
08/22/2026M01241184-I1 · 452 5 AVENUEOpen ↗
08/22/2026M01241170-I1 · 452 5 AVENUEOpen ↗
Showing 3 of 5 on file for this type