← Back
Design Firm
EPOC DESIGN + ARCHITECTURE
Design
BROOKLYN · 1MANHATTAN · 1
2 buildings
4
Total Filings
2
Projects on File
2
Buildings Worked
0
Projects w/ Open Permits
Design
Role
Activity
Projects by first filing month2 projects all-time
0112Jun '21 · 1Sep '21 · 1Jun '21Jul '21Aug '21Sep '21
Portfolio status
Browse projects →
Signed off2100%
By project type
Alteration2
Most active buildings
All buildings →
185 PARK ROWMANHATTAN · latest 10/13/2021
1 projects
354 6 STREETBROOKLYN · latest 07/06/2022
1 projects
Key relationships
Everyone →
Filing representatives
2 projects
Contractors
David Ennislatest 04/25/2023
3 filings
Filed under
EPOC DESIGN + ARCHITECTURE4
Identified by the contact ids of the people who file for the firm and by its email domain (epoc-da.com), not by matching names.
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B00505170 ↗354 6 STREET
BROOKLYN
AlterationSigned-off06/24/202107/06/2022
Contractor ICP
Kitchen renovation and expansion at first floor rear as shown on plans. No change in use, egress or occupancy.
M00575195 ↗185 PARK ROW
MANHATTAN
AlterationSigned-off09/24/202110/13/2021INTERIOR RENOVATION OF EXISTING GROUND FLOOR SPACE AS SHOWN ON PLANS. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
Counts cover all 2 projects (2 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Every person filing for this firm, identified by their DOB NOW contact id (one id is one person). A person is listed under the firm they file for most.
PersonFilingsMost recent
David Ennis304/25/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ALCO STORE DEVELOPMENT CO109/24/2021
I.C.P CORP110/31/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
THE FINEST FEDERAL CREDIT UNION109/24/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
S&M EXPEDITING210/31/2023
2 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 2Signed off 2
2 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B00505170 ↗354 6 STREET
BROOKLYN
AlterationSigned-off06/24/202107/06/2022
Contractor ICP
Kitchen renovation and expansion at first floor rear as shown on plans. No change in use, egress or occupancy.
M00575195 ↗185 PARK ROW
MANHATTAN
AlterationSigned-off09/24/202110/13/2021INTERIOR RENOVATION OF EXISTING GROUND FLOOR SPACE AS SHOWN ON PLANS. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
354 6 STREET ↗304/25/2023
185 PARK ROW ↗108/11/2021
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026M00575195-I1 · 185 PARK ROWRequest digital key ↗
09/01/2026B00505170-P1 · 354 6 STREETRequest digital key ↗
Showing 2 of 4 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZoning Exhibit form (1-5)3
09/01/2026B00505170-P1 · 354 6 STREETOpen ↗
Showing 1 of 3 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
09/01/2026B00505170-P1 · 354 6 STREETOpen ↗
Showing 1 of 3 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature7
08/27/2026B00505170-P1 · 354 6 STREETOpen ↗
08/27/2026B00505170-P1 · 354 6 STREETOpen ↗
08/27/2026B00505170-P1 · 354 6 STREETOpen ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026M00575195-I1 · 185 PARK ROWOpen ↗
09/01/2026B00505170-I1 · 354 6 STREETOpen ↗
09/01/2026B00505170-P2 · 354 6 STREETOpen ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026B00505170-P1 · 354 6 STREETOpen ↗
08/27/2026B00505170-P1 · 354 6 STREETOpen ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/03/2026M00575195-I1 · 185 PARK ROWOpen ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00575195-I1 · 185 PARK ROWOpen ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCertification by Insurance Broker or Agency1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents9
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
09/01/2026B00505170-P1 · 354 6 STREETOpen ↗
Showing 1 of 3 on file for this type
▸DOB NOWPlot Diagram3
09/01/2026B00505170-P1 · 354 6 STREETOpen ↗
Showing 1 of 3 on file for this type
▸DOB NOWSite Survey: Initial2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAdditional Insured Authorizations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type