| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q07994943 ↗ | 79-06 35 AVENUE QUEENS | Alteration | Permit Issued | 10/04/2022 | 11/04/2022 | Contractor M A NATIONWIDE GEN. CONS | Remove 1144 linear ft of metal cladding at the roof parapet. Repoint and repair masonry behind cladding as required. |
| M00737598 ↗ | 210 WEST 29 STREET MANHATTAN | Alteration | Signed-off | 05/17/2022 | 09/24/2022 | Contractor G.P. MECHANICAL CORP | Relocating pantry and creating an additional W.C. |
| M00575818 ↗ | 36 EAST 23 STREET MANHATTAN | Alteration | Signed-off | 01/25/2022 | 05/26/2022 | Contractor ATLAS CONSTRUCTION OF NY | Facade repairs including terracotta patching and crack repair, masonry repointing and replacement, and window frame repainting |
| Q00519626 ↗ | 87-07 35 AVENUE QUEENS | Alteration | Signed-off | 09/14/2021 | 09/28/2021 | Owner QUEENS CHADWICK CORP Contractor M A NATIONWIDE GEN. CONS Filer NEW CODE CONSULTING LLC | Replacement of existing steel lintels and existing brick at the window header per plans. Inner wythe of brick and interior wall plaster shal… |
| Q00532196 ↗ | 143-10 HOOVER AVENUE QUEENS | Alteration | Signed-off | 06/16/2021 | 07/01/2021 | Owner QUEENS CHADWICK CORP Contractor J&R RESTORATION Filer NEW CODE CONSULTING LLC | Replacement of existing steel lintels and existing brick at the window header on the sixth-floor facade as per plans. Inner wythe of brick a… |
| Person | Filings | Most recent |
|---|---|---|
| HARRY MELTZER | 3 | 05/13/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| PAKNIA ENGINEERING, PC | 1 | 06/03/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| M A NATIONWIDE GEN. CONS | 2 | 10/04/2022 |
| ATLAS CONSTRUCTION OF NY | 1 | 01/25/2022 |
| AV BRAD CONSTRUCTION LLC | 1 | 06/03/2022 |
| J&R RESTORATION | 1 | 06/16/2021 |
| VERTEX PLUMBING & HTG COR | 1 | 06/03/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| QUEENS CHADWICK CORP | 2 | 09/14/2021 |
| 45 West 21st St Assoc, LLC | 1 | 06/03/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| NEW CODE CONSULTING LLC | 2 | 09/14/2021 |
| PAKNIA ENGINEERING & ARCHITECTURE, | 1 | 06/03/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q07994943 ↗ | 79-06 35 AVENUE QUEENS | Alteration | Permit Issued | 10/04/2022 | 11/04/2022 | Contractor M A NATIONWIDE GEN. CONS | Remove 1144 linear ft of metal cladding at the roof parapet. Repoint and repair masonry behind cladding as required. |
| M00737598 ↗ | 210 WEST 29 STREET MANHATTAN | Alteration | Signed-off | 05/17/2022 | 09/24/2022 | Contractor G.P. MECHANICAL CORP | Relocating pantry and creating an additional W.C. |
| M00575818 ↗ | 36 EAST 23 STREET MANHATTAN | Alteration | Signed-off | 01/25/2022 | 05/26/2022 | Contractor ATLAS CONSTRUCTION OF NY | Facade repairs including terracotta patching and crack repair, masonry repointing and replacement, and window frame repainting |
| Q00519626 ↗ | 87-07 35 AVENUE QUEENS | Alteration | Signed-off | 09/14/2021 | 09/28/2021 | Owner QUEENS CHADWICK CORP Contractor M A NATIONWIDE GEN. CONS Filer NEW CODE CONSULTING LLC | Replacement of existing steel lintels and existing brick at the window header per plans. Inner wythe of brick and interior wall plaster shal… |
| Q00532196 ↗ | 143-10 HOOVER AVENUE QUEENS | Alteration | Signed-off | 06/16/2021 | 07/01/2021 | Owner QUEENS CHADWICK CORP Contractor J&R RESTORATION Filer NEW CODE CONSULTING LLC | Replacement of existing steel lintels and existing brick at the window header on the sixth-floor facade as per plans. Inner wythe of brick a… |
| Building | Filings | Most Recent |
|---|---|---|
| 210 WEST 29 STREET ↗ | 1 | 05/13/2022 |
| 143-10 HOOVER AVENUE ↗ | 1 | 06/01/2021 |
| 87-07 35 AVENUE ↗ | 1 | 05/10/2021 |
| 36 EAST 23 STREET ↗ | 1 | — |
| 79-06 35 AVENUE ↗ | 1 | — |