| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01378005 ↗ | 283 7 AVENUE MANHATTAN | Alteration | Permit Issued | 06/16/2026 | 07/10/2026 | Design MARCY ENGINEERING, PLLC Contractor BERKSHIRE REFRIGERATION S | Heat Pump Retrofit - Remove gas furnaces with remote DX cooling. Installation of (1) new VRF heat pump system and (1) new makeup air system. |
| B01402352 ↗ | 208 FLATBUSH AVENUE BROOKLYN | Alteration | Permit Issued | 06/04/2026 | 06/10/2026 | Design MARCY ENGINEERING, PLLC Owner PINTCHIK Contractor DENAIR HVAC INC | Replacing existing split heat pump system serving sales area on ground floor. |
| X01337921 ↗ | 1852 BRONXDALE AVENUE BRONX | Alteration | Permit Issued | 03/25/2026 | 05/14/2026 | Design MARCY ENGINEERING, PLLC Contractor U-CONTROL ENERGY SOLUTION | Fitout of existing space for new meat market, involving the design/installation of ducted split heat pumps for space conditioning and toilet… |
| X01348418 ↗ | 1852 BRONXDALE AVENUE BRONX | Alteration | Permit Issued | 04/21/2026 | 04/27/2026 | Design MARCY ENGINEERING, PLLC Contractor V & M DRAIN CLEANING INC | Installing (1) slop sink, (1) floor sink, (1) floor drain, (1) 3-compartment sink with (1) grease trap, (2) drinking fountains, (1) ice mach… |
| B01374563 ↗ | 135 PIERREPONT STREET BROOKLYN | Alteration | Filed — no permit on record | 04/17/2026 | — | Design MARCY ENGINEERING, PLLC | — |
| M01345498 ↗ | 313 COLUMBUS AVENUE MANHATTAN | Alteration | Signed-off | 02/20/2026 | 03/10/2026 | Design MARCY ENGINEERING, PLLC Contractor WESTROCK MECHANICAL CORP | Installation of (1) new 2 ton heat pump ductless split system. |
| Name | Projects together | Most recent |
|---|---|---|
| MARCY ENGINEERING, PLLC | 14 | 06/16/2026 |
| JAMES CALLAHAN | 4 | 03/19/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| DENAIR HVAC INC | 4 | 06/12/2026 |
| BERKSHIRE REFRIGERATION S | 2 | 06/16/2026 |
| CARE MECHANICAL LLC | 2 | 01/09/2024 |
| WESTROCK MECHANICAL CORP | 2 | 04/02/2026 |
| HENICK-LANE SERVICE CORP | 1 | 06/28/2024 |
| PRISTINE CONSTRUCTION LLC | 1 | 01/08/2022 |
| STANDARD REFRIGERATORS IN | 1 | 01/29/2025 |
| U-CONTROL ENERGY SOLUTION | 1 | 03/25/2026 |
| V & M DRAIN CLEANING INC | 1 | 04/21/2026 |
| VEEBEE COOLING CORP | 1 | 03/19/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| AHL 2024 LLC | 1 | 04/01/2026 |
| BOULEVARD TOGETHER DEVELOPER LLC | 1 | 04/17/2026 |
| CARE MECHANICAL LLC | 1 | 01/09/2024 |
| EQUITY RESIDENTIAL | 1 | 06/12/2026 |
| PINNACLE STRATEGIC LLC | 1 | 06/28/2024 |
| PINTCHIK | 1 | 06/04/2026 |
| REALTY GROUP NORTH | 1 | 09/22/2025 |
| STONEHENGE MANAGEMENT LLC | 1 | 01/29/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01378005 ↗ | 283 7 AVENUE MANHATTAN | Alteration | Permit Issued | 06/16/2026 | 07/10/2026 | Design MARCY ENGINEERING, PLLC Contractor BERKSHIRE REFRIGERATION S | Heat Pump Retrofit - Remove gas furnaces with remote DX cooling. Installation of (1) new VRF heat pump system and (1) new makeup air system. |
| B01402352 ↗ | 208 FLATBUSH AVENUE BROOKLYN | Alteration | Permit Issued | 06/04/2026 | 06/10/2026 | Design MARCY ENGINEERING, PLLC Owner PINTCHIK Contractor DENAIR HVAC INC | Replacing existing split heat pump system serving sales area on ground floor. |
| X01337921 ↗ | 1852 BRONXDALE AVENUE BRONX | Alteration | Permit Issued | 03/25/2026 | 05/14/2026 | Design MARCY ENGINEERING, PLLC Contractor U-CONTROL ENERGY SOLUTION | Fitout of existing space for new meat market, involving the design/installation of ducted split heat pumps for space conditioning and toilet… |
| X01348418 ↗ | 1852 BRONXDALE AVENUE BRONX | Alteration | Permit Issued | 04/21/2026 | 04/27/2026 | Design MARCY ENGINEERING, PLLC Contractor V & M DRAIN CLEANING INC | Installing (1) slop sink, (1) floor sink, (1) floor drain, (1) 3-compartment sink with (1) grease trap, (2) drinking fountains, (1) ice mach… |
| B01374563 ↗ | 135 PIERREPONT STREET BROOKLYN | Alteration | Filed — no permit on record | 04/17/2026 | — | Design MARCY ENGINEERING, PLLC | — |
| M01345498 ↗ | 313 COLUMBUS AVENUE MANHATTAN | Alteration | Signed-off | 02/20/2026 | 03/10/2026 | Design MARCY ENGINEERING, PLLC Contractor WESTROCK MECHANICAL CORP | Installation of (1) new 2 ton heat pump ductless split system. |
| M01334117 ↗ | 224 WEST 18 STREET MANHATTAN | Alteration | Filed — no permit on record | 01/14/2026 | — | Design MARCY ENGINEERING, PLLC Owner AHL 2024 LLC | — |
| M01313498 ↗ | 228 WEST 71 STREET MANHATTAN | Alteration | Signed-off | 12/30/2025 | 01/08/2026 | Design MARCY ENGINEERING, PLLC Contractor DENAIR HVAC INC | New heat pump installation to include: (1) 5-Ton 1-to-1 ducted AHU to replace existing split system. (1) 3-Ton multi-zone system with (3) 1-… |
| M01320386 ↗ | 500 WEST 23 STREET MANHATTAN | Alteration | Signed-off | 12/16/2025 | 01/08/2026 | Design MARCY ENGINEERING, PLLC Contractor DENAIR HVAC INC | Replacement of (2) ducted heat pump systems. (1) for the Gym, (1) for the Lobby |
| M01324960 ↗ | 400 WEST 37 STREET MANHATTAN | Alteration | Signed-off | 12/12/2025 | 01/08/2026 | Design MARCY ENGINEERING, PLLC Owner EQUITY RESIDENTIAL Contractor DENAIR HVAC INC | Installation of (2) new ducted split heat pump systems to replace indoor packaged air cooled units for existing retail space (Step Soul Spa)… |
| M01187924 ↗ | 617 WEST 181 STREET MANHATTAN | Alteration | Signed-off | 03/19/2025 | 10/23/2025 | Design JAMES CALLAHAN Contractor VEEBEE COOLING CORP | INSTALLATION OF REPLACEMENT HVAC SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| M01253823 ↗ | 269 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 08/08/2025 | 08/27/2025 | Design MARCY ENGINEERING, PLLC Owner REALTY GROUP NORTH Contractor BERKSHIRE REFRIGERATION S | Direct replacement of (1) 10-ton packaged RTU and (1) 7.5-ton RTU. |
| M01109341 ↗ | 10 DOWNING STREET MANHATTAN | Alteration | Signed-off | 01/29/2025 | 02/06/2025 | Design MARCY ENGINEERING, PLLC Contractor STANDARD REFRIGERATORS IN | Installation of (1) new 6-ton heat pump condensing unit, and (1) 8-ton heat pump condensing unit on roof. |
| X01068498 ↗ | 3515 BRUCKNER BOULEVARD BRONX | Alteration | Signed-off | 06/28/2024 | 02/04/2025 | Design MARCY ENGINEERING, PLLC Owner PINNACLE STRATEGIC LLC Contractor HENICK-LANE SERVICE CORP | Installation of (7) split heat pump systems throughout apartments. |
| X01060017 ↗ | 3050 CORLEAR AVENUE BRONX | Alteration | Signed-off | 06/11/2024 | 06/17/2024 | Design MARCY ENGINEERING, PLLC Contractor WESTROCK MECHANICAL CORP | Direct replacement of (1) 20-ton air-cooled self-contained air conditioning unit. |
| M00655630 ↗ | 314 PLEASANT AVENUE MANHATTAN | Alteration | Signed-off | 01/08/2022 | 03/25/2024 | Design JAMES CALLAHAN Contractor PRISTINE CONSTRUCTION LLC | INSTALLATION OF ONE NEW NON EMERGENCY STANDBY GENERATOR LOCATED IN YARD. NO CHANGE IN USE, EGRESS, OCCUPANCY OR NUMBER OF STORIES |
| M00963656 ↗ | 118 EAST 125 STREET MANHATTAN | Alteration | Signed-off | 11/22/2023 | 12/05/2023 | Design JAMES CALLAHAN Owner CARE MECHANICAL LLC Contractor CARE MECHANICAL LLC | REPLACEMENT OF TWO EXISTING HVAC ROOFTOP AIR HANDLING UNITS AND MINOR MODIFICATION OF EXISTING ROOFTOP SHEETMETAL - THERE IS NO CHANGE OF US… |
| X00923523 ↗ | INDEPENDENCE AVENUE BRONX | Alteration | Signed-off | 10/03/2023 | 10/11/2023 | Design JAMES CALLAHAN Contractor CARE MECHANICAL LLC | REPLACEMENT IN KIND OF TWO (2) EXISTING MECHANICAL HEATING & AIR CONDITIONING ROOF TOP UNITS - NO CHANGE OF USE, EGRESS, OR OCCUPANCY |
| Building | Filings | Most Recent |
|---|---|---|
| 283 7 AVENUE ↗ | 1 | 06/16/2026 |
| 208 FLATBUSH AVENUE ↗ | 1 | 06/04/2026 |
| 1852 BRONXDALE AVENUE ↗ | 2 | 04/21/2026 |
| 135 PIERREPONT STREET ↗ | 1 | 04/17/2026 |
| 313 COLUMBUS AVENUE ↗ | 2 | 04/02/2026 |
| 224 WEST 18 STREET ↗ | 2 | 04/01/2026 |
| 228 WEST 71 STREET ↗ | 1 | 12/30/2025 |
| 500 WEST 23 STREET ↗ | 1 | 12/16/2025 |
| 400 WEST 37 STREET ↗ | 1 | 12/12/2025 |
| 269 AMSTERDAM AVENUE ↗ | 2 | 09/22/2025 |
| 617 WEST 181 STREET ↗ | 1 | 03/19/2025 |
| 10 DOWNING STREET ↗ | 1 | 01/29/2025 |
| 3515 BRUCKNER BOULEVARD ↗ | 1 | 06/28/2024 |
| 3050 CORLEAR AVENUE ↗ | 1 | 06/11/2024 |
| 118 EAST 125 STREET ↗ | 2 | 01/09/2024 |
| INDEPENDENCE AVENUE ↗ | 1 | 10/03/2023 |
| 314 PLEASANT AVENUE ↗ | 1 | 01/08/2022 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 06/12/2026 | Maintenance information | 400 WEST 37 STREET | Jacob Stone | energy_progress |
| 06/12/2026 | HVAC-R and service water piping design and insulation | 400 WEST 37 STREET | Jacob Stone | energy_progress |
| 06/12/2026 | HVAC-R and service water heating system controls | 400 WEST 37 STREET | Jacob Stone | energy_progress |
| 06/12/2026 | HVAC-R and service water heating equipment | 400 WEST 37 STREET | Jacob Stone | energy_progress |
| 06/12/2026 | Final | 400 WEST 37 STREET | Jacob Stone | progress |
| 06/12/2026 | Energy Code Compliance Inspections | 400 WEST 37 STREET | Jacob Stone | progress |
| 06/12/2026 | Tenant Protection Plan Compliance | 400 WEST 37 STREET | JAMES CALLAHAN | special |
| 06/12/2026 | Mechanical Systems | 400 WEST 37 STREET | Jacob Stone | special |
| 06/08/2026 | Energy Code Compliance Inspections | 283 7 AVENUE | Jacob Stone | progress |
| 06/03/2026 | Tenant Protection Plan Compliance | 208 FLATBUSH AVENUE | JAMES CALLAHAN | special |
| 06/03/2026 | Energy Code Compliance Inspections | 208 FLATBUSH AVENUE | Jacob Stone | progress |
| 06/03/2026 | HVAC-R and service water heating equipment | 208 FLATBUSH AVENUE | Jacob Stone | energy_progress |
| 06/03/2026 | Maintenance information | 208 FLATBUSH AVENUE | Jacob Stone | energy_progress |
| 06/03/2026 | HVAC-R and service water piping design and insulation | 208 FLATBUSH AVENUE | Jacob Stone | energy_progress |
| 06/03/2026 | HVAC-R and service water heating system controls | 208 FLATBUSH AVENUE | Jacob Stone | energy_progress |
| 05/14/2026 | Mechanical Systems | 208 FLATBUSH AVENUE | Jacob Stone | special |
| 05/14/2026 | Final | 208 FLATBUSH AVENUE | Jacob Stone | progress |
| 04/06/2026 | HVAC-R and service water heating equipment | 283 7 AVENUE | Jacob Stone | energy_progress |
| 04/06/2026 | HVAC-R and service water heating system controls | 283 7 AVENUE | Jacob Stone | energy_progress |
| 04/06/2026 | HVAC-R and service water piping design and insulation | 283 7 AVENUE | Jacob Stone | energy_progress |
| 04/06/2026 | Maintenance information | 283 7 AVENUE | Jacob Stone | energy_progress |
| 04/02/2026 | HVAC-R and service water piping design and insulation | 313 COLUMBUS AVENUE | Jacob Stone | energy_progress |
| 04/02/2026 | HVAC-R and service water heating system controls | 313 COLUMBUS AVENUE | Jacob Stone | energy_progress |
| 04/02/2026 | Maintenance information | 313 COLUMBUS AVENUE | Jacob Stone | energy_progress |
| 04/02/2026 | HVAC-R and service water heating equipment | 313 COLUMBUS AVENUE | Jacob Stone | energy_progress |
| 04/02/2026 | Final | 313 COLUMBUS AVENUE | Jacob Stone | progress |
| 04/02/2026 | Energy Code Compliance Inspections | 313 COLUMBUS AVENUE | Jacob Stone | progress |
| 04/02/2026 | Mechanical Systems | 313 COLUMBUS AVENUE | Jacob Stone | special |
| 04/02/2026 | Fire-Resistant Penetrations and Joints | 313 COLUMBUS AVENUE | Jacob Stone | special |
| 04/02/2026 | Tenant Protection Plan Compliance | 313 COLUMBUS AVENUE | JAMES CALLAHAN | special |
| 04/01/2026 | Fire-Resistant Penetrations and Joints | 224 WEST 18 STREET | Jacob Stone | special |
| 04/01/2026 | Mechanical Systems | 224 WEST 18 STREET | Jacob Stone | special |
| 04/01/2026 | Post-installed Anchors | 224 WEST 18 STREET | Jacob Stone | special |
| 04/01/2026 | Tenant Protection Plan Compliance | 224 WEST 18 STREET | JAMES CALLAHAN | special |
| 04/01/2026 | Maintenance information | 224 WEST 18 STREET | Jacob Stone | energy_progress |
| 04/01/2026 | HVAC-R and service water heating equipment | 224 WEST 18 STREET | Jacob Stone | energy_progress |
| 04/01/2026 | HVAC-R and service water piping design and insulation | 224 WEST 18 STREET | Jacob Stone | energy_progress |
| 04/01/2026 | HVAC-R and service water heating system controls | 224 WEST 18 STREET | Jacob Stone | energy_progress |
| 04/01/2026 | Final | 224 WEST 18 STREET | Jacob Stone | progress |
| 04/01/2026 | Energy Code Compliance Inspections | 224 WEST 18 STREET | Jacob Stone | progress |
| 03/30/2026 | Tenant Protection Plan Compliance | 135 PIERREPONT STREET | JAMES CALLAHAN | special |
| 03/30/2026 | Energy Code Compliance Inspections | 135 PIERREPONT STREET | Jacob Stone | progress |
| 03/30/2026 | HVAC-R and service water heating equipment | 135 PIERREPONT STREET | Jacob Stone | energy_progress |
| 03/30/2026 | Maintenance information | 135 PIERREPONT STREET | Jacob Stone | energy_progress |
| 03/30/2026 | Tenant Protection Plan Compliance | 283 7 AVENUE | JAMES CALLAHAN | special |
| 03/25/2026 | Final | 283 7 AVENUE | Jacob Stone | progress |
| 03/25/2026 | Mechanical Systems | 283 7 AVENUE | Jacob Stone | special |
| 03/23/2026 | Post-installed Anchors | 224 WEST 18 STREET | Jacob Stone | special |
| 03/23/2026 | Energy Code Compliance Inspections | 224 WEST 18 STREET | Jacob Stone | progress |
| 03/23/2026 | HVAC-R and service water heating equipment | 224 WEST 18 STREET | Jacob Stone | energy_progress |