← Back
Special Inspection Agency
MANHATTAN SKYLINE INSPECT
Special Inspection Agency
4 projects with open permitsMANHATTAN · 21BRONX · 1
11 buildings
31
Total Filings
22
Projects on File
11
Buildings Worked
4
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Projects by first filing month22 projects all-time
0134May '21 · 1Oct '21 · 1Nov '21 · 2Feb '22 · 2May '22 · 1Sep '22 · 1Oct '22 · 2Mar '23 · 2Jun '23 · 1Jul '24 · 1Dec '24 · 1May '25 · 3Jun '25 · 1Feb '26 · 2Apr '26 · 120222023202420252026
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit418%
Signed off1882%
By project type
Alteration22
Most active buildings
All buildings →
166 EAST 34 STREETMANHATTAN · 2 open · latest 05/20/2026
4 projects
107 SULLIVAN STREETMANHATTAN · latest 10/16/2024
3 projects
1361 AVENUE OF THE AMERMANHATTAN · 2 open · latest 06/29/2026
3 projects
479 WEST BROADWAYMANHATTAN · latest 06/03/2026
2 projects
424 WEST END AVENUEMANHATTAN · latest 06/25/2026
2 projects
6 WEST 16 STREETMANHATTAN · latest 04/07/2022
2 projects
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01131240 ↗1361 AVENUE OF THE AMER
MANHATTAN
AlterationPermit Issued05/29/202506/29/2026REMOVE, REPLACE RELOCATE AND INSTALL NEW PLUMBING FIXTURES AT FIRST FLOOR, ALL IN CONJUNCTION WITH THE RENOVATION OF AN OFFICE SPACE ON THE …
M01130809 ↗1361 AVENUE OF THE AMER
MANHATTAN
AlterationPermit Issued05/01/202506/25/2026Renovation to existing office space on the CONST. 1ST FLOOR (tenant 2nd floor), Remove and construct new non -bearing partitions, ceiling a…
M01354796 ↗424 WEST END AVENUE
MANHATTAN
AlterationSigned-off02/24/202606/25/2026REPLACEMENT OF AC HANDLER UNIT IN BASEMENT AND IN THE BASEMENT ROOF LEVEL , ALL AS PER PLAN FILED HEREWITH , NO CHANGE IN USE EGRESS OR OCC…
M01329353 ↗479 WEST BROADWAY
MANHATTAN
AlterationSigned-off04/07/202606/03/2026REPLACEMENT OF AC EQUIPMENT IN THE ROOF LEVEL. NEW AC UNITS TO BE RECONNECT TO EXISTING PIPING AND ELCTRIC. PROTECT ROOFING SYSTEM. ALL AS P…
M01358522 ↗166 EAST 34 STREET
MANHATTAN
AlterationPermit Issued02/24/202605/20/2026REMOVE AND INSTALL NEW PLUMBING FIXTURES , IM CONJUNCTION WITH RE LOCATION OF AN ADA BATHROOM IN BASEMENT LEVEL, ALL AS PER PLAN. NO CHANGE …
M01165040 ↗166 EAST 34 STREET
MANHATTAN
AlterationPermit Issued06/05/202510/30/2025Upgrading plumbing work type in privately owned public space in the open space, work included relocation of drain, replace plumbing where re…
Counts cover all 22 projects (22 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
MANHATTAN SKYLINE MANAGEMENT CO.1404/07/2026
ETTINGER ENGINEERING ASSOCIATES406/05/2025
G. MASUCCI ARCHITECTS, LLC106/14/2022
HLW INTERNATIONAL105/01/2025
STRUCTURAL WORKSHOP LLC107/03/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
BSM MAINTENANCE CORP605/27/2025
MANTECH MECHANICAL LLC604/07/2026
A.W. & S. CONSTRUCTION CO205/29/2025
AMK MECHANICAL LTD209/21/2022
ARDEL CONSTRUCTION & DESI211/29/2022
SUPERB PLUMBING & HEATING202/24/2026
2323 DEVELOPMENT CORP107/03/2024
BLIZZARD COOLING INC106/07/2023
DIKER A & V CONTRACTING C106/14/2022
M.A.C. PLUMBING, INC112/20/2021
WILLIAM C. GERAKARIS P&H105/29/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
MANHATTAN SKYLINE803/06/2024
MANHATTAN SKYLINE MANAGEMENT CORP704/07/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
I & L CONSULTING, INC.1604/07/2026
NAGAN EX CONSULTANTS INC.106/14/2022
22 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 22Open permit 4Signed off 18
22 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01131240 ↗1361 AVENUE OF THE AMER
MANHATTAN
AlterationPermit Issued05/29/202506/29/2026REMOVE, REPLACE RELOCATE AND INSTALL NEW PLUMBING FIXTURES AT FIRST FLOOR, ALL IN CONJUNCTION WITH THE RENOVATION OF AN OFFICE SPACE ON THE …
M01130809 ↗1361 AVENUE OF THE AMER
MANHATTAN
AlterationPermit Issued05/01/202506/25/2026Renovation to existing office space on the CONST. 1ST FLOOR (tenant 2nd floor), Remove and construct new non -bearing partitions, ceiling a…
M01354796 ↗424 WEST END AVENUE
MANHATTAN
AlterationSigned-off02/24/202606/25/2026REPLACEMENT OF AC HANDLER UNIT IN BASEMENT AND IN THE BASEMENT ROOF LEVEL , ALL AS PER PLAN FILED HEREWITH , NO CHANGE IN USE EGRESS OR OCC…
M01329353 ↗479 WEST BROADWAY
MANHATTAN
AlterationSigned-off04/07/202606/03/2026REPLACEMENT OF AC EQUIPMENT IN THE ROOF LEVEL. NEW AC UNITS TO BE RECONNECT TO EXISTING PIPING AND ELCTRIC. PROTECT ROOFING SYSTEM. ALL AS P…
M01358522 ↗166 EAST 34 STREET
MANHATTAN
AlterationPermit Issued02/24/202605/20/2026REMOVE AND INSTALL NEW PLUMBING FIXTURES , IM CONJUNCTION WITH RE LOCATION OF AN ADA BATHROOM IN BASEMENT LEVEL, ALL AS PER PLAN. NO CHANGE …
M01165040 ↗166 EAST 34 STREET
MANHATTAN
AlterationPermit Issued06/05/202510/30/2025Upgrading plumbing work type in privately owned public space in the open space, work included relocation of drain, replace plumbing where re…
M01217094 ↗166 EAST 34 STREET
MANHATTAN
AlterationSigned-off05/27/202506/26/2025
Contractor BSM MAINTENANCE
Minor partitions work, convert powder room to full bathroom #2 at apt Apartment 16K, ,and relocated front doors at apartments 16k & 16J . a…
M01146244 ↗166 EAST 34 STREET
MANHATTAN
AlterationSigned-off12/02/202401/03/2025
Contractor BSM MAINTENANCE
ALTERATION WORK AT DOCTOR'S OFFICE ON THE BASEMENT FLOOR. UNITS 500 & 502 . INSTALLATION OF NEW STOREFRONT , MINOR PARTITIONS WORK AND ASSOC…
M01066695 ↗107 SULLIVAN STREET
MANHATTAN
AlterationSigned-off07/03/202410/16/2024REMOVE AND REPLACE DAMAGE FLOOR APARTMENTS 27 & 28 ON THE 4TH FLOOR , REPLACE DAMAGE BEAMS WERE REQUIRED, CEILING AT APARTMENTS 20 AND 21 ON…
M08006061 ↗336 BROADWAY
MANHATTAN
AlterationSigned-off10/10/202203/07/2024INTALL NEW HVAC UNITS IN EXISTING RETAIL STORES . AND ADDING A FAN TO A NEW CONSTRUCT BATHROOM , AL;L AS PER PLAN NO CHANGE IN USE RGRESS OR…
M00819005 ↗107 SULLIVAN STREET
MANHATTAN
AlterationSigned-off03/06/202303/05/2024
Contractor BSM MAINTENANCE
INTERIOR RENOVATION TO EXISTING APARTMENT #19 ON THE 4TH FLOOR , REMOVE AND CONSTRUCT NEW PARTITIONS , MODIFY LIGHTING . ALL AS PER PLAN . N…
M00871256 ↗424 WEST END AVENUE
MANHATTAN
AlterationSigned-off06/07/202302/01/2024REPLACE AND INSTALL NEW SPLIT HVAC UNITS IN EXISTING LOCATION ROOF OVER BASEMENT, FLOOR, AND REPLACE AIR HANDLER UNIT AT ,MECHANICAL BASE…
M07994579 ↗336 BROADWAY
MANHATTAN
AlterationSigned-off10/10/202204/24/2023INSTALL NEW AIR CONDITION AND HEATING SYSTEM AT STORE LOCATED AT 342 BROADWAY AND OBTAIN EQUIPMENT USE PERMIT. ALL AS PER PLAN , NO CHANGE …
M08053190 ↗127 EAST 34 STREET
MANHATTAN
AlterationSigned-off03/15/202303/28/2023REPLACEMENT OF EXISTING CONDENSING UNIT AND AIR HANDLER UNIT OF EXISTING MECHANICAL SYSTEM, AND OBTAINING EQUIPMENT USE PERMIT. AS PER PLAN…
M00698012 ↗1361 AVENUE OF THE AMER
MANHATTAN
AlterationSigned-off05/02/202201/06/2023Replace existing Air Conditioning Units . connection to existing duct work. obtain equipment use permit. all as per plans submitted herewith…
M07998783 ↗363 WEST 30 STREET
MANHATTAN
AlterationSigned-off09/21/202212/16/2022REPLACEMENT OF EXISTING AIR CONDENSER AND AIR HANDLING UNIT AS PER PLANS SUBMITTED HEREWITH.
M00513964 ↗111 SULLIVAN STREET
MANHATTAN
AlterationSigned-off05/17/202108/25/2022APPLICATION FILED TO RESTORE APARTMENTS TO EXISTING CONDITIONS, APT#1BR AND 2BR ON 1ST AND 2ND FLOOR. REMOVE AND CONSTRUCT PARTITIONS AND FI…
M00597797 ↗107 SULLIVAN STREET
MANHATTAN
AlterationSigned-off10/11/202108/25/2022MINOR PARTITION WORK IN APT#1 ON THE 2ND FLOOR. ALL AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00485210 ↗111 EAST 210 STREET
BRONX
AlterationSigned-off02/17/202206/27/2022Subsequent filing to correct serial number on Unit #2
M00641433 ↗479 WEST BROADWAY
MANHATTAN
AlterationSigned-off02/10/202206/22/2022REPLACEMENT OF TWO MECHANICAL EQUIPMENT UNITS AND OBTAINING EQUIPMENT USE PERMIT , ALL AS PER PLAN.
M00621443 ↗6 WEST 16 STREET
MANHATTAN
AlterationSigned-off11/12/202104/07/2022INSTALL AND REPLACE PLUMING FIXTURES IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APT 12KS ON THE 12 FLOOR FILED UNDER APPLICATION M006206…
M00620636 ↗6 WEST 16 STREET
MANHATTAN
AlterationSigned-off11/12/202101/03/2022
Contractor BSM MAINTENANCE
MINOR PARTITION WORK AND FINISHES IN APT#12-KS ON 12TH FLOOR, ALL AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. (P…
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
479 WEST BROADWAY ↗304/07/2026
166 EAST 34 STREET ↗502/24/2026
424 WEST END AVENUE ↗202/24/2026
1361 AVENUE OF THE AMER ↗305/29/2025
107 SULLIVAN STREET ↗507/03/2024
336 BROADWAY ↗401/29/2024
127 EAST 34 STREET ↗209/21/2023
363 WEST 30 STREET ↗109/21/2022
111 EAST 210 STREET ↗206/14/2022
6 WEST 16 STREET ↗312/20/2021
111 SULLIVAN STREET ↗105/17/2021
▾Special Inspection Requirements — 92
DateRequirementBuildingInspectorRole
02/20/2026Energy Code Compliance Inspections166 EAST 34 STREETRobert Esnardprogress
02/20/2026HVAC-R and service water piping design and insulation166 EAST 34 STREETRobert Esnardenergy_progress
02/11/2026Tenant Protection Plan Compliance166 EAST 34 STREETJohn Nucatolaspecial
02/11/2026Fire-Resistant Penetrations and Joints166 EAST 34 STREETRobert Esnardspecial
06/05/2025Fire-Resistance Rated Construction166 EAST 34 STREETRobert Esnardprogress
05/27/2025Lighting in dwelling units166 EAST 34 STREETRobert Esnardenergy_progress
05/27/2025Tenant Protection Plan Compliance166 EAST 34 STREETJohn Nucatolaspecial
05/27/2025Fire-Resistant Penetrations and Joints166 EAST 34 STREETRobert Esnardspecial
05/27/2025Energy Code Compliance Inspections166 EAST 34 STREETRobert Esnardprogress
04/30/2025Fire-Resistant Penetrations and Joints1361 AVENUE OF THE AMERRobert Esnardspecial
04/28/2025Final166 EAST 34 STREETRobert Esnardprogress
11/21/2024Lighting controls166 EAST 34 STREETRobert Esnardenergy_progress
11/21/2024Fenestration air leakage166 EAST 34 STREETRobert Esnardenergy_progress
11/21/2024Fenestration and door U-factor and product ratings166 EAST 34 STREETRobert Esnardenergy_progress
11/21/2024Final166 EAST 34 STREETRobert Esnardprogress
11/21/2024Energy Code Compliance Inspections166 EAST 34 STREETRobert Esnardprogress
11/21/2024Fire-Resistant Penetrations and Joints166 EAST 34 STREETRobert Esnardspecial
10/23/2024Lighting controls1361 AVENUE OF THE AMERRobert Esnardenergy_progress
10/23/2024Interior lighting power1361 AVENUE OF THE AMERRobert Esnardenergy_progress
10/23/2024Energy Code Compliance Inspections1361 AVENUE OF THE AMERRobert Esnardprogress
10/23/2024Tenant Protection Plan Compliance1361 AVENUE OF THE AMERJohn Nucatolaspecial
10/22/2024Final1361 AVENUE OF THE AMERRobert Esnardprogress
05/08/2024Fire-Resistant Penetrations and Joints107 SULLIVAN STREETRobert Esnardspecial
05/08/2024Energy Code Compliance Inspections107 SULLIVAN STREETRobert Esnardprogress
05/08/2024Final107 SULLIVAN STREETRobert Esnardprogress
05/08/2024Lighting in dwelling units107 SULLIVAN STREETRobert Esnardenergy_progress
02/20/2024Mechanical Systems336 BROADWAYRobert Esnardspecial
02/20/2024Energy Code Compliance Inspections336 BROADWAYRobert Esnardprogress
02/20/2024Final336 BROADWAYRobert Esnardprogress
02/20/2024Maintenance information336 BROADWAYRobert Esnardenergy_progress
02/20/2024HVAC-R and service water heating equipment336 BROADWAYRobert Esnardenergy_progress
02/20/2024HVAC-R and service water heating system controls336 BROADWAYRobert Esnardenergy_progress
01/29/2024HVAC-R and service water heating system controls336 BROADWAYRobert Esnardenergy_progress
01/29/2024HVAC-R and service water heating equipment336 BROADWAYRobert Esnardenergy_progress
01/29/2024Maintenance information336 BROADWAYRobert Esnardenergy_progress
01/29/2024Final336 BROADWAYRobert Esnardprogress
01/29/2024Energy Code Compliance Inspections336 BROADWAYRobert Esnardprogress
01/29/2024Mechanical Systems336 BROADWAYRobert Esnardspecial
09/25/2023Maintenance information127 EAST 34 STREETRobert Esnardenergy_progress
09/25/2023Final127 EAST 34 STREETRobert Esnardprogress
09/25/2023Energy Code Compliance Inspections127 EAST 34 STREETRobert Esnardprogress
09/25/2023Mechanical Systems127 EAST 34 STREETRobert Esnardspecial
09/13/2023Maintenance information127 EAST 34 STREETRobert Esnardenergy_progress
09/13/2023Energy Code Compliance Inspections127 EAST 34 STREETRobert Esnardprogress
09/13/2023Final127 EAST 34 STREETRobert Esnardprogress
09/13/2023Mechanical Systems127 EAST 34 STREETRobert Esnardspecial
05/08/2023Mechanical Systems336 BROADWAYRobert Esnardspecial
05/08/2023Energy Code Compliance Inspections336 BROADWAYRobert Esnardprogress
05/08/2023Final336 BROADWAYRobert Esnardprogress
05/08/2023HVAC-R and service water heating system controls336 BROADWAYRobert Esnardenergy_progress
Latest 50 of 92.
▾Documents — 204 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch33
09/03/2026M00620636-I1 · 6 WEST 16 STREETRequest digital key ↗
09/03/2026M00620636-P1 · 6 WEST 16 STREETRequest digital key ↗
Showing 3 of 33 on file for this type
▸Applications & Permits11
▸DOB NOWLPC Approval/Permit11
09/03/2026M00513964-I1 · 111 SULLIVAN STREETOpen ↗
09/02/2026M00641433-P1 · 479 WEST BROADWAYOpen ↗
09/02/2026M00641433-I1 · 479 WEST BROADWAYOpen ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications128
▸DOB NOWProgress Inspector Seal & Signature70
09/17/2026M08053190-I1 · 127 EAST 34 STREETOpen ↗
09/17/2026M08053190-I1 · 127 EAST 34 STREETOpen ↗
09/17/2026M08053190-I1 · 127 EAST 34 STREETOpen ↗
Showing 3 of 70 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature33
09/03/2026M00513964-I1 · 111 SULLIVAN STREETOpen ↗
09/03/2026M00620636-I1 · 6 WEST 16 STREETOpen ↗
09/03/2026M00620636-P1 · 6 WEST 16 STREETOpen ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/17/2026M08053190-I1 · 127 EAST 34 STREETOpen ↗
09/01/2026M00698012-I1 · 1361 AVENUE OF THE AMEROpen ↗
09/01/2026M07994579-I1 · 336 BROADWAYOpen ↗
Showing 3 of 25 on file for this type
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
09/02/2026M00641433-P1 · 479 WEST BROADWAYOpen ↗
09/02/2026M00641433-I1 · 479 WEST BROADWAYOpen ↗
09/01/2026M00597797-I1 · 107 SULLIVAN STREETOpen ↗
Showing 3 of 21 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/03/2026M00513964-I1 · 111 SULLIVAN STREETOpen ↗
09/03/2026M00620636-I1 · 6 WEST 16 STREETOpen ↗
08/23/2026M01165040-I1 · 166 EAST 34 STREETOpen ↗
Showing 3 of 4 on file for this type
▸Energy Compliance5
▸DOB NOWEN2: As Built Energy Analysis.5
09/03/2026M00513964-I1 · 111 SULLIVAN STREETOpen ↗
09/03/2026M00620636-I1 · 6 WEST 16 STREETOpen ↗
08/13/2026X00485210-I1 · 111 EAST 210 STREETOpen ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026X00485210-S1 · 111 EAST 210 STREETOpen ↗
08/13/2026X00485210-I1 · 111 EAST 210 STREETOpen ↗