← Back
Special Inspection Agency
MARC DANIEL TECHNICAL SER
Special Inspection Agency
MANHATTAN · 3
2 buildings
3
Total Filings
3
Projects on File
2
Buildings Worked
0
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Projects by first filing month3 projects all-time
0123Nov '19 · 1Dec '19 · 2Nov '19Dec '19
Portfolio status
Browse projects →
Signed off3100%
By project type
Alteration3
Most active buildings
All buildings →
599 LEXINGTON AVENUEMANHATTAN · latest 12/17/2019
2 projects
498 7 AVENUEMANHATTAN · latest 11/14/2019
1 projects
Key relationships
Everyone →
Design firms
Owners
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00264357 ↗599 LEXINGTON AVENUE
MANHATTAN
AlterationSigned-off12/06/201912/17/2019Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
M00264405 ↗599 LEXINGTON AVENUE
MANHATTAN
AlterationSigned-off12/03/201912/11/2019Modification to existing Sprinkler system as per plans filed herewith. Modification to existing Plumbing fixtures as per plans filed herewit…
M00243363 ↗498 7 AVENUE
MANHATTAN
AlterationSigned-off11/12/201911/14/2019Installation of (119) sprinkler heads with piping on 13th Construction/14th Marketing and (280) sprinkler heads with piping on 14th Construc…
Counts cover all 3 projects (3 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
AMA CONSULTING ENGINEERS, PC212/06/2019
COSENTINI ASSOCIATES111/12/2019
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ASHLAR MECHANICAL CORP111/12/2019
PAR PLUMBING CO., INC112/03/2019
SIRINA FIRE PROT CORP112/03/2019
STRUCTURE TONE, LLC112/06/2019
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
BOSTON PROPERTIES112/03/2019
3 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 3Signed off 3
3 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00264357 ↗599 LEXINGTON AVENUE
MANHATTAN
AlterationSigned-off12/06/201912/17/2019Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
M00264405 ↗599 LEXINGTON AVENUE
MANHATTAN
AlterationSigned-off12/03/201912/11/2019Modification to existing Sprinkler system as per plans filed herewith. Modification to existing Plumbing fixtures as per plans filed herewit…
M00243363 ↗498 7 AVENUE
MANHATTAN
AlterationSigned-off11/12/201911/14/2019Installation of (119) sprinkler heads with piping on 13th Construction/14th Marketing and (280) sprinkler heads with piping on 14th Construc…
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
599 LEXINGTON AVENUE ↗212/06/2019
498 7 AVENUE ↗111/12/2019
▾Special Inspection Requirements — 9
DateRequirementBuildingInspectorRole
12/06/2019HVAC and service water heating equipment 599 LEXINGTON AVENUEMARC CHIAPPERINOenergy_progress
12/06/2019Electrical energy consumption599 LEXINGTON AVENUEMARC CHIAPPERINOenergy_progress
12/06/2019HVAC and service water heating system controls 599 LEXINGTON AVENUEMARC CHIAPPERINOenergy_progress
12/06/2019Duct leakage testing 599 LEXINGTON AVENUEMARC CHIAPPERINOenergy_progress
12/06/2019HVAC insulation and sealing 599 LEXINGTON AVENUEMARC CHIAPPERINOenergy_progress
12/06/2019Maintenance information599 LEXINGTON AVENUEMARC CHIAPPERINOenergy_progress
11/13/2019Final599 LEXINGTON AVENUEMARC CHIAPPERINOprogress
11/13/2019Mechanical Systems599 LEXINGTON AVENUEMARC CHIAPPERINOspecial
11/13/2019Sprinkler Systems599 LEXINGTON AVENUEMARC CHIAPPERINOspecial
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00243363-I1 · 498 7 AVENUERequest digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
▸DOB NOWPlans/Sketch - Mechanical Systems1
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature7
09/21/2026M00264357-I1 · 599 LEXINGTON AVENUEOpen ↗
09/21/2026M00264357-I1 · 599 LEXINGTON AVENUEOpen ↗
09/21/2026M00264357-I1 · 599 LEXINGTON AVENUEOpen ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/05/2026M00243363-I1 · 498 7 AVENUEOpen ↗
08/13/2026M00264357-I1 · 599 LEXINGTON AVENUEOpen ↗
08/13/2026M00264405-I1 · 599 LEXINGTON AVENUEOpen ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/21/2026M00264357-I1 · 599 LEXINGTON AVENUEOpen ↗
08/27/2026M00264405-I1 · 599 LEXINGTON AVENUEOpen ↗
▸Safety & Tenant Protection1
▸DOB NOWHPD-1: Anti-Harassment Area Checklist1
08/13/2026M00243363-I1 · 498 7 AVENUEOpen ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/05/2026M00243363-I1 · 498 7 AVENUEOpen ↗
08/13/2026M00264357-I1 · 599 LEXINGTON AVENUEOpen ↗
08/13/2026M00264405-I1 · 599 LEXINGTON AVENUEOpen ↗