← Back
Walk-up cooperative
371 WEST STREET
MANHATTAN · BIN 1083164
💬 Discuss this project
1960Year Built
5Stories
C6Building Class
C1-6AZoning
215,890 sfGross Floor Area
184Units
LL97 CoveredRent Stabilized62 Open Violations 61 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up cooperative · Owner of record: WVH HOUSING CORPORATION · 66,825 sf lot · 3.23 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 2 docs
Floor 20Under Construction1p · 1 filing · 18 docs
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5Under Construction4p · 1 filing · 2 docs
Floor 4
Floor 3
Floor 2
Floor 1
BasementUnder Construction2p · 1 filing · 18 docs
Sub-BasementUnder Construction9p · 1 filing · 18 docs
2 jobs · most recent 08/12/2026
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/12/2026Permit IssuedMR. AIR NYC CORPAir Conditioning Systems
Cooling
Mitsubishi Electric MSZ-EX09NLW 9,000 BTU · Fan Coil Indoor ×2
MSZ-EX15NLW 14,000 BTU ×1
MXZ-3D30NLHZ 28,400 BTU · Condensing Unit ×1
01/12/2026Permit IssuedGAUDIOSO CONTRACTING INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-3C-30NA3 36,000 BTU · Split System ×1
3 jobs · most recent 07/28/2026
General Wiring
FiledStatusContractorScope
07/28/2026Permit IssuedCRESCO ELECTRICAL CORPGeneral Wiring
05/06/2025Permit IssuedCREGGAN ELECTRIAL CORPGeneral Wiring
02/17/2024Permit IssuedRICHARD NEU—
1 job · most recent 01/12/2026
Steel Masonry
FiledStatusContractorScope
01/12/2026Permit IssuedGAUDIOSO CONTRACTING INCSteel, Masonry
1 job · most recent 02/16/2024
Sidewalk Shed
FiledStatusContractorScope
02/16/2024Permit IssuedTOPLINE NYC INCSidewalk Shed
Building Lifecycle
All (69)Filed (9)Permit Issued (8)Signed Off (4)Violation (12)Objection (6)Special Inspection (30)
08/19/2026
Permit issued — Mechanical Systems
M01440388-I1-MS
08/12/2026
Filed — Alteration
INSTALL NEW MINI-SPLIT AIR-CONDITIONING SYSTEM AT APT# 5A OF EXISTING 5-STORY BUILDING WITH MECHANICAL WORK ONLY AS PER PLANS FILED HERE WITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M01440388-I1
04/27/2026
Signed off — Alteration
Structural work type in conjunction with i1 alteration to upgrade structural members as per the plans filed herewith
M01142206-I1
04/13/2026
Signed off — Alteration
Structural work type in conjunction with i1 alteration to upgrade structural members as per the plans filed herewith
M01142206-S1
01/12/2026
Filed — Alteration
Structural work type in conjunction with i1 alteration to upgrade structural members as per the plans filed herewith
M01142206-P1
12/10/2025
Special inspection requirement — Masonry
SAHAND AINECHI
12/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAHAND AINECHI
12/10/2025
Special inspection requirement — Structural Steel - Details
SAHAND AINECHI
12/10/2025
Special inspection requirement — Final
SAHAND AINECHI
06/12/2025
Violation issued (HPD, closed)
A
05/05/2025
Permit issued — Support of Excavation
M01142206-S2-SE
05/05/2025
Permit issued — Structural
M01142206-S1-ST
04/09/2025
Permit issued — Mechanical Systems
M01142206-I1-GC-CX
03/24/2025
Permit issued — General Construction
M01142206-I1-GC-CX
03/04/2025
Objection resolved — Addressed
03/03/2025
Objection resolved — Addressed
02/28/2025
Objection resolved — Addressed
02/26/2025
Objection raised — Admin
02/11/2025
Objection raised — Scope
02/11/2025
Objection raised — Zoning
02/03/2025
Filed — Alteration
Structural work type in conjunction with i1 alteration to upgrade structural members as per the plans filed herewith
M01142206-I1
02/03/2025
Filed — Alteration
Structural work type in conjunction with i1 alteration to upgrade structural members as per the plans filed herewith
M01142206-S1
02/03/2025
Filed — Alteration
Structural work type in conjunction with i1 alteration to upgrade structural members as per the plans filed herewith
M01142206-S2
11/22/2024
Violation issued (HPD, closed)
I
11/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Guy Lagomarsino
11/14/2024
Special inspection requirement — Energy Code Compliance Inspections
Jock deBoer
11/14/2024
Special inspection requirement — Fire-Resistance Rated Construction
Jock deBoer
11/14/2024
Special inspection requirement — Air barrier — testing
Jock deBoer
11/14/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Jock deBoer
11/14/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jock deBoer
11/14/2024
Special inspection requirement — Fenestration air leakage
Jock deBoer
11/14/2024
Special inspection requirement — Insulation placement and R values
Jock deBoer
11/14/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jock deBoer
11/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Jock deBoer
11/14/2024
Special inspection requirement — Lighting controls
Jock deBoer
11/14/2024
Special inspection requirement — Mechanical Systems
Jock deBoer
11/14/2024
Special inspection requirement — Lighting in dwelling units
Jock deBoer
11/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jock deBoer
11/14/2024
Special inspection requirement — Heating Systems
Jock deBoer
11/14/2024
Special inspection requirement — Masonry
SAHAND AINECHI
11/14/2024
Special inspection requirement — Final
Jock deBoer
09/11/2024
Signed off — Alteration
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
M00886394-I1
02/27/2024
Special inspection requirement — Post-installed Anchors
Eric Cowley
02/27/2024
Special inspection requirement — Masonry
Eric Cowley
02/27/2024
Special inspection requirement — Tenant Protection Plan Compliance
Eric Cowley
02/27/2024
Special inspection requirement — Final
Eric Cowley
02/27/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Cowley
02/23/2024
Filed — Alteration
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
M00886394-P1
02/23/2024
Special inspection requirement — Masonry
Eric Cowley
02/23/2024
Special inspection requirement — Post-installed Anchors
Eric Cowley
02/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Cowley
02/23/2024
Special inspection requirement — Final
Eric Cowley
02/22/2024
Permit issued — General Construction
M00886394-I1-GC
02/16/2024
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01004684-I1
02/16/2024
Permit issued — Sidewalk Shed
M01004684-I1-SH
01/26/2024
Filed — Alteration
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
M00886394-I1
12/02/2020
Signed off — Alteration
M00343956-I1
06/25/2020
Permit issued — Plumbing
M00343956-I1-PL
04/24/2020
Filed — Alteration
M00343956-I1
11/23/2016
Violation issued (HPD, closed)
I
Latest 60 of 69 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES2104/09/2026
TOPLINE NYC INC.503/22/2026
WVH HOUSING CORPORATION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
H&J BUILDING CONSULTING INC108/12/2026
ALMA ENGINEERING, PC301/12/2026
JOCK DEBOER, AIA102/03/2025
COWLEY ENGINEERING, PC202/23/2024
ASR ENGINEERING PC102/16/2024
AUDRA MANZANO ARCHITECT PLLC104/24/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A+ EXPEDITING803/21/2026
THERESA VOLTAGGIO203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
SYNCHRON EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GAUDIOSO CONTRACTING INCGeneral Contractor604/09/2026
MASON CONSTRUCTION SERVICGeneral Contractor303/21/2026
TOPLINE NYC INCGeneral Contractor303/21/2026
MR. AIR NYC CORPGeneral Contractor108/20/2026
NEW YORK STANDARD MECH CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010108/12/2026
ALMA ENGINEERING, P.C.7833301/12/2026
JOCK DEBOER, AIA - SIA7008102/03/2025
OPTIMIZED ENGINEERING ASS2449102/03/2025
COWLEY ENGINEERING186202/23/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMR. AIR NYC CORP08/19/2026
DOB NOWSupport of ExcavationPermit IssuedGAUDIOSO CONTRACTING05/05/2025
DOB NOWStructuralSigned-offGAUDIOSO CONTRACTING05/05/2025
DOB NOWMechanical SystemsSigned-offGAUDIOSO CONTRACTING04/09/2025
DOB NOWGeneral ConstructionSigned-offGAUDIOSO CONTRACTING03/24/2025
DOB NOWGeneral ConstructionSigned-offMASON CONSTRUCTION SERVIC02/22/2024
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC INC02/16/2024
DOB NOWPlumbingSigned-offNEW YORK STANDARD MECH CORP06/25/2020
BISOTISSUEDNY CONSTRUCTION&STONE INC06/12/2020
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
12/10/2025MasonrySAHAND AINECHIspecial
12/10/2025Structural Stability – Alterations of existing buildingsSAHAND AINECHIspecial
12/10/2025Structural Steel - DetailsSAHAND AINECHIspecial
12/10/2025FinalSAHAND AINECHIprogress
11/20/2024Structural Stability – Alterations of existing buildingsGuy Lagomarsinospecial
11/14/2024Energy Code Compliance InspectionsJock deBoerprogress
11/14/2024Fire-Resistance Rated ConstructionJock deBoerprogress
11/14/2024Air barrier — testing Jock deBoerenergy_progress
11/14/2024Fenestration and door U-factor and product ratingsJock deBoerenergy_progress
11/14/2024HVAC-R and service water heating system controlsJock deBoerenergy_progress
11/14/2024Fenestration air leakageJock deBoerenergy_progress
11/14/2024Insulation placement and R valuesJock deBoerenergy_progress
11/14/2024HVAC-R and service water heating equipmentJock deBoerenergy_progress
11/14/2024HVAC-R and service water piping design and insulationJock deBoerenergy_progress
11/14/2024Lighting controlsJock deBoerenergy_progress
11/14/2024Mechanical SystemsJock deBoerspecial
11/14/2024Lighting in dwelling unitsJock deBoerenergy_progress
11/14/2024Fire-Resistant Penetrations and JointsJock deBoerspecial
11/14/2024Heating SystemsJock deBoerspecial
11/14/2024MasonrySAHAND AINECHIspecial
11/14/2024FinalJock deBoerprogress
02/27/2024Post-installed AnchorsEric Cowleyspecial
02/27/2024MasonryEric Cowleyspecial
02/27/2024Tenant Protection Plan ComplianceEric Cowleyspecial
02/27/2024FinalEric Cowleyprogress
Latest 25 of 31.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
08/28/2026M01004684-I1Request digital key ↗
08/27/2026M00886394-I1Request digital key ↗
08/27/2026M00886394-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00343956-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
04/30/2020140896626Open ↗
04/28/2020140896626Open ↗
▸BISWORK PERMIT APPLICATION1
06/12/2020140896626Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/05/2026M00343956-I1Open ↗
08/28/2026M01004684-I1Open ↗
08/27/2026M00886394-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026M01142206-I1Open ↗
09/23/2026M01142206-I1Open ↗
09/23/2026M01142206-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026M01142206-I1Open ↗
09/23/2026M01142206-I1Open ↗
09/02/2026M00886394-P1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/28/2020140896626Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
04/28/2020140896626Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00343956-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/05/2026M00343956-I1Open ↗
08/27/2026M00886394-P1Open ↗
08/27/2026M00886394-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/30/2020140896626Open ↗
04/28/2020140896626Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/30/2020140896626Open ↗
04/28/2020140896626Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/30/2020140896626Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/30/2020140896626Open ↗
04/28/2020140896626Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/30/2020140896626Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
11/30/2020140896626Open ↗
04/28/2020140896626Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
07/18/2020140896626Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
04/28/2020140896626Open ↗
▸BISADDITIONAL INFORMATION1
05/05/2020140896626Open ↗