← Back
Special Inspection Agency
ROBAK ARCHITECTURE, LLC
Special Inspection Agency
4 projects with open permitsMANHATTAN · 18BRONX · 15QUEENS · 12
24 buildings
60
Total Filings
45
Projects on File
24
Buildings Worked
4
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Projects by first filing month45 projects all-time
04711May '21 · 1Jun '21 · 1Oct '21 · 1Nov '21 · 1Dec '21 · 3Jan '22 · 1Mar '22 · 2Apr '22 · 2May '22 · 2Jul '22 · 10Oct '22 · 1Nov '22 · 2Feb '23 · 4Apr '23 · 2May '23 · 1Jun '23 · 2Oct '23 · 1Jan '24 · 1May '24 · 2Jun '25 · 1Mar '26 · 1May '26 · 1Jul '26 · 1Aug '26 · 120222023202420252026
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit49%
Signed off4089%
Filed only12%
By project type
Alteration45
Most active buildings
All buildings →
315 WEST 57 STREETMANHATTAN · latest 10/26/2023
7 projects
939 WOODYCREST AVENUEBRONX · latest 03/13/2023
5 projects
939 WOODYCREST AVENUEBRONX · latest 05/21/2024
4 projects
1160 5 AVENUEMANHATTAN · 2 open · latest 09/24/2026
3 projects
315 WEST 57 STREETMANHATTAN · latest 06/24/2025
3 projects
151 EAST 80 STREETMANHATTAN · latest 05/19/2023
2 projects
Key relationships
Everyone →
Filing representatives
Owners
1 projects
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01392669 ↗1160 5 AVENUE
MANHATTAN
AlterationPermit Issued05/20/202609/24/2026REPLACE AND RELOCATE KITCHEN AND BATHROOM FIXTURES. NEW SHOWER, LAVATORY AND WC. NEW BRANCHES HOT & COLD, NEW SHOWER BODY. REPLACE ANY ROTTE…
M01438337 ↗1160 5 AVENUE
MANHATTAN
AlterationPermit Issued08/21/202609/01/2026REPLACE AND RELOCATE KITCHEN AND BATHROOM FIXTURES. NEW SHOWER, LAVATORY AND WC. NEW BRANCHES HOT & COLD, NEW SHOWER BODY. REPLACE ANY ROTTE…
X01409053 ↗1780 GRAND CONCOURSE
BRONX
AlterationPermit Issued07/06/202608/24/2026
Contractor FREEDOM GS INC
Interior demolition of tenant space on the 5th floor. Remove non load bearing partitions, suspended ceilings, ductwork, flooring and finishe…
M01369669 ↗40 BOND STREET
MANHATTAN
AlterationSigned-off03/17/202604/27/2026Erect partition wall to create a bedroom that was previously removed, create desk niche and shelving.
X01038302 ↗1780 GRAND CONCOURSE
BRONX
AlterationPermit Issued05/09/202402/03/2026INTERIOR DEMOLITION OF NON-LOAD BEARING PARTITIONS AT EXISTING OFFICE SPACE ON THE 7TH & 8TH FLOORS. REMOVAL OF HVAC COMPONENTS, PARTITIONS …
M01239798 ↗315 WEST 57 STREET
MANHATTAN
AlterationSigned-off06/18/202506/24/2025Interior renovations. Demo existing non-bearing partitions and construct new non-bearing partition walls as specified on plans.
Counts cover all 45 projects (45 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
GERALD CALIENDO ARCHITECTS805/17/2023
HILLMAN & MILEY CONSULTING ENGINEER110/22/2024
ROJAS AP108/19/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
EXPRESS PL SWR & WTR A1908/21/2026
I & M CONSTRUCTION LLC1708/21/2026
ARON CONSTRUCTION INC805/17/2023
BROTHERS PRO CONSTRUCTION706/18/2025
COTTAM HEATING & AIR COND508/21/2026
A & E CONSTRUCTION OF NY206/13/2023
FREEDOM GS INC208/12/2026
CARDONE CONCRETE INC101/30/2023
EAGLE EMPIRE CONTRACTING101/08/2024
OVERALL RENOVATION INC105/05/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
PELICAN MANAGEMENT INC.3708/21/2026
SELECT105/05/2021
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
PELICAN MANAGEMENT INC.3008/21/2026
GERALD J. CALIENDO R.A., P.C.805/17/2023
45 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 45Open permit 4Signed off 40Filed only 1
45 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01392669 ↗1160 5 AVENUE
MANHATTAN
AlterationPermit Issued05/20/202609/24/2026REPLACE AND RELOCATE KITCHEN AND BATHROOM FIXTURES. NEW SHOWER, LAVATORY AND WC. NEW BRANCHES HOT & COLD, NEW SHOWER BODY. REPLACE ANY ROTTE…
M01438337 ↗1160 5 AVENUE
MANHATTAN
AlterationPermit Issued08/21/202609/01/2026REPLACE AND RELOCATE KITCHEN AND BATHROOM FIXTURES. NEW SHOWER, LAVATORY AND WC. NEW BRANCHES HOT & COLD, NEW SHOWER BODY. REPLACE ANY ROTTE…
X01409053 ↗1780 GRAND CONCOURSE
BRONX
AlterationPermit Issued07/06/202608/24/2026
Contractor FREEDOM GS INC
Interior demolition of tenant space on the 5th floor. Remove non load bearing partitions, suspended ceilings, ductwork, flooring and finishe…
M01369669 ↗40 BOND STREET
MANHATTAN
AlterationSigned-off03/17/202604/27/2026Erect partition wall to create a bedroom that was previously removed, create desk niche and shelving.
X01038302 ↗1780 GRAND CONCOURSE
BRONX
AlterationPermit Issued05/09/202402/03/2026INTERIOR DEMOLITION OF NON-LOAD BEARING PARTITIONS AT EXISTING OFFICE SPACE ON THE 7TH & 8TH FLOORS. REMOVAL OF HVAC COMPONENTS, PARTITIONS …
M01239798 ↗315 WEST 57 STREET
MANHATTAN
AlterationSigned-off06/18/202506/24/2025Interior renovations. Demo existing non-bearing partitions and construct new non-bearing partition walls as specified on plans.
X01040613 ↗939 WOODYCREST AVENUE
BRONX
AlterationSigned-off05/03/202405/21/2024Interior renovation of vestibule.
X00982107 ↗4445 POST ROAD
BRONX
AlterationSigned-off01/08/202401/16/2024Combination of Apt's 8A & 8B by removing an approx. 9' length of non-load-bearing partition between the units. Remove the kitchen and misc. …
M00953715 ↗315 WEST 57 STREET
MANHATTAN
AlterationFiled — no permit on record10/26/2023——
M00861063 ↗315 WEST 57 STREET
MANHATTAN
AlterationSigned-off05/30/202307/28/2023INTERIOR RENOVATION AND COMBINATION OF EAPARTMENTS 18B AND 18C. MINOR PARTITION ALTERATIONS. NO CHANGE IN EGRESS OR FIRE PROTECTION.
Q00887999 ↗20-02 SEAGIRT BOULEVARD
QUEENS
AlterationSigned-off06/13/202306/23/2023INTERIOR RENOVATION OF APARTMENT 5A. NO CHANGE IN EGRESS OR FIRE PROTECTION. NO CHANGE IN THE NUMBER OF BEDROOMS.
X00878088 ↗1700 GRAND CONCOURSE
BRONX
AlterationSigned-off06/05/202306/13/2023Remove existing fixtures & associated piping in apt. 11F & 11G. Install new & replacement fixtures and piping as shown on plans.
M00856913 ↗151 EAST 80 STREET
MANHATTAN
AlterationSigned-off04/18/202305/19/2023INTERIOR RENOVATION OF APARTMENT 10C, REMOVAL OF NON-LOAD BEARING PARTITIONS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00856850 ↗315 WEST 57 STREET
MANHATTAN
AlterationSigned-off04/17/202304/26/2023
Contractor FREEDOM GS
INTERIOR DEMOLOITION OF EXISTING COMMERCIAL SPACE (PARK WEST RADIOLOGY) IN THE CELLAR. REMOVING ALL MEP COMPONENTS, NON-LOAD BEARING PARTITI…
X00827974 ↗939 WOODYCREST AVENUE
BRONX
AlterationSigned-off02/13/202303/13/2023INTERIOR RENOVATION OF EXISTING APARTMENT 40. MINOR PARTITION ALTERATIONS. NO CHANGE IN EGRESS OR FIRE PROTECTION. NO CHANGE IN THE NUMBER O…
M00829623 ↗315 WEST 57 STREET
MANHATTAN
AlterationSigned-off02/28/202303/06/2023INTERIOR RENOVATION OF APARTMENTS 12N & 12P. MINOR PARTITION ALTERATIONS. NO CHANGE IN EGRESS OR FIRE PROTECTION. NO CHANGE IN THE NUMBER OF…
M08022409 ↗151 EAST 80 STREET
MANHATTAN
AlterationSigned-off10/26/202202/15/2023REMOVAL OF ALL INTERIOR NON-LOAD BEARING PARTITIONS AND FIXTURES. MAKE SITE READY FOR NEW RENOVATIONS UNDER SEPARATE APPLICATION. NO CHANGE …
Q00808569 ↗20-02 SEAGIRT BOULEVARD
QUEENS
AlterationSigned-off02/13/202302/15/2023INSTALLATION OF REPLACEMENT HVAC UNIT.
X00825758 ↗939 WOODYCREST AVENUE
BRONX
AlterationSigned-off02/08/202302/13/2023Lobby renovation. New drop ceiling, new stair treads, re-laminate and level walls. Install temporary wood structure all as per plans filed h…
Q08030996 ↗20-55 SEAGIRT BOULEVARD
QUEENS
AlterationSigned-off11/16/202212/27/2022INTERIOR ALTERATION/RENOVATION OF APARTMENTS 3C & 3D. REMOVAL OF NON-LOAD BEARING PARTION, FLOORS, DOORS, FINISHES. INSTALLATION OF PARTITIO…
M08023159 ↗315 WEST 57 STREET
MANHATTAN
AlterationSigned-off11/04/202211/10/2022Partial demo to non-load bearing partitions to combine units 16K and 16J. Minor alterations in unit 16A. Plumbing scope of work to be filed …
Q00761867 ↗20-20 SEAGIRT BOULEVARD
QUEENS
AlterationSigned-off07/19/202210/25/2022INSTALLATION OF NEW NON-LOAD BEARING INTERIOR PARTITIONS TO CREATE A LAUNDRY ROOM AT THE CELLAR LEVEL. PLUMBING & SPRINKLER TO BE FILED UNDE…
Q00749093 ↗20-55 SEAGIRT BOULEVARD
QUEENS
AlterationSigned-off07/19/202210/11/2022INSTALLATION OF NEW NON-LOAD BEARING INTERIOR PARTITIONS TO CREATE A LAUNDRY ROOM AT THE CELLAR LEVEL. PLUMBING & SPRINKLER TO BE FILED UNDE…
Q00761853 ↗20-20 SEAGIRT BOULEVARD
QUEENS
AlterationSigned-off07/19/202210/03/2022INSTALLATION OF NEW NON-LOAD BEARING INTERIOR PARTITIONS TO CREATE A LAUNDRY ROOM AT THE CELLAR LEVEL. PLUMBING FILED & SPRINKLER TO BE FILE…
Q00749003 ↗20-20 SEAGIRT BOULEVARD
QUEENS
AlterationSigned-off07/19/202208/20/2022INSTALLATION OF NEW NON-LOAD BEARING INTERIOR PARTITIONS TO CREATE A LAUNDRY ROOM AT THE CELLAR LEVEL. PLUMBING & SPRINKLER FILED UNDER SUBS…
Q00761846 ↗20-02 SEAGIRT BOULEVARD
QUEENS
AlterationSigned-off07/19/202208/19/2022Installation of new non-load bearing interior partitions to create a laundry room and storage room at the cellar level. Plumbing & Sprinkler…
Q00749052 ↗20-33 SEAGIRT BOULEVARD
QUEENS
AlterationSigned-off07/19/202208/18/2022INSTALLATION OF NEW NON-LOAD BEARING INTERIOR PARTITIONS TO CREATE A LAUNDRY ROOM AT THE CELLAR LEVEL. PLUMBING & SPRINKLER TO BE FILED UNDE…
Q00761884 ↗20-21 SEAGIRT BOULEVARD
QUEENS
AlterationSigned-off07/19/202208/18/2022INSTALLATION OF NEW NON-LOAD BEARING INTERIOR PARTITIONS TO CREATE A LAUNDRY ROOM AT THE CELLAR LEVEL. PLUMBING & SPRINKLER TO BE FILED UNDE…
Q00761888 ↗20-55 SEAGIRT BOULEVARD
QUEENS
AlterationSigned-off07/19/202208/18/2022INSTALLATION OF NEW NON-LOAD BEARING INTERIOR PARTITIONS TO CREATE A LAUNDRY ROOM AT THE CELLAR LEVEL. PLUMBING & SPRINKLER TO BE FILED UNDE…
X00775061 ↗2101 CEDAR AVENUE
BRONX
AlterationSigned-off07/27/202208/02/2022Replace and relocate kitchen and bathroom fixtures. Replace hot and cold water branches. Replace shower body and waste. Replace any galvaniz…
X00775580 ↗930 SHERIDAN AVENUE
BRONX
AlterationSigned-off07/18/202207/20/2022ALTERATION IN STORE #1, INSTALLATION OF PARTITIONS AND ACCESSIBLE BATH. INSTALL SUSPENDED CEILING AND NEW LIGHTING. INSTALL NEW HVAC SPLIC S…
M00515608 ↗420 EAST 51 STREET
MANHATTAN
AlterationSigned-off05/05/202106/14/2022Install 1 ton (12,000 BTU) Air Conditioning split system in the master bedroom of Apt 13D.
M00732579 ↗315 WEST 57 STREET
MANHATTAN
AlterationSigned-off05/06/202205/25/2022ALTERATION AND RENOVATION OF EXISTING APARTMENTS 17F AND 17G. NO CHANGE IN EGRESS OR FIRE PROTECTION. NO CHANGE IN OCCUPANCY OR USE.
M00726679 ↗618 WEST 151 STREET
MANHATTAN
AlterationSigned-off05/04/202205/18/2022INTERIOR RENOVATION OF EXISTING APARTMENT 5A. MINOR PARTION ALTERATIONS. NO CHANGE IN EGRESS OR FIRE PROTECTION. NO CHANGE IN THE NUMBER OF …
M00709939 ↗315 WEST 57 STREET
MANHATTAN
AlterationSigned-off04/12/202205/17/2022ALTERATION AND RENOVATION OF EXISTING APARTMENTS 17A. NO CHANGE IN EGRESS OR FIRE PROTECTION. NO CHANGE IN OCCUPANCY OR USE.
M00702441 ↗1160 5 AVENUE
MANHATTAN
AlterationSigned-off04/16/202204/20/2022PROPOSE TO RENOVATE EXISTING APARTMENT 508, INSTALL NEW NON LOAD BEARING PARTITIONS, RENOVATE EXISTING BATHROOMS AND KITCHEN ALL AS PER PLAN…
X00705541 ↗939 WOODYCREST AVENUE
BRONX
AlterationSigned-off03/25/202204/05/2022INTERIOR RENOVATION OF EXISTING APARTMENT 14. MINOR PARTITION ALTERATIONS. NO CHANGE IN EGRESS OR FIRE PROTECTION. NO CHANGE IN THE NUMBER O…
X00686936 ↗939 WOODYCREST AVENUE
BRONX
AlterationSigned-off03/02/202203/08/2022INTERIOR RENOVATION OF EXISTING APARTMENT 302. MINOR PARITION ALTERATIONS. NO CHANGE IN EGRESS OR FIRE PROTECTION. NO CHANGE IN THE NUMBER O…
Q00519926 ↗20-20 SEAGIRT BOULEVARD
QUEENS
AlterationSigned-off06/09/202103/02/2022
Design ROJAS AP
Plumbing and sprinkler work to accommodate new and relocated fixtures for renovated laundry room.
X00658396 ↗939 WOODYCREST AVENUE
BRONX
AlterationSigned-off01/06/202201/12/2022IN APT (64) NEW AND RELOCATED PLUMBING FIXTURES AND ASSOCIATED PIPING.
X00646968 ↗939 WOODYCREST AVENUE
BRONX
AlterationSigned-off12/15/202112/29/2021New & replacement plumbing fixtures as shown on plans ( units 406,407, 506 & 507).
X00649333 ↗939 WOODYCREST AVENUE
BRONX
AlterationSigned-off12/20/202112/28/2021INTERIOR RENOVATION OF EXISTING APARTMENT 64. MINOR PARTITION ALTERATIONS. NO CHANGE IN EGRESS OR FIRE PROTECTION. NO CHANGE IN THE NUNMBER …
X00636761 ↗939 WOODYCREST AVENUE
BRONX
AlterationSigned-off12/14/202112/16/2021RENOVATION & COMBINATION OF EXISTING APARTMENTS 406 & 407 INTO ONE UNIT. ALSO RENOVATION & COMBINATION OF APARTMENTS 506 & 507 INTO ONE UNIT…
M00624174 ↗315 WEST 57 STREET
MANHATTAN
AlterationSigned-off11/16/202111/27/2021INTERIOR RENOVATION & COMBINATION OF APARTMENTS 14J & 14K (13TH FLOOR). NEW AND REPLACEMENT PLUMBING FIXTURES AS SHOWN ON PLANS.
M00617989 ↗315 WEST 57 STREET
MANHATTAN
AlterationSigned-off10/27/202111/03/2021INTERIOR RENOVATION & COMBINATION OF APARTMENT 14J & 14K. MINOR PARTITION ALTERATIONS. NO CHANGE IN EGRESS OR FIRE PROTECTION. NO CHANGE IN …
▾Special Inspection Requirements — 150
DateRequirementBuildingInspectorRole
08/21/2026Maintenance information1160 5 AVENUEDavid Robakenergy_progress
08/21/2026HVAC-R and service water heating equipment1160 5 AVENUEDavid Robakenergy_progress
08/21/2026HVAC-R and service water piping design and insulation1160 5 AVENUEDavid Robakenergy_progress
08/21/2026HVAC-R and service water heating system controls1160 5 AVENUEDavid Robakenergy_progress
08/21/2026Energy Code Compliance Inspections1160 5 AVENUEDavid Robakprogress
08/11/2026Mechanical Systems1780 GRAND CONCOURSEDavid Robakspecial
08/11/2026Final1780 GRAND CONCOURSEDavid Robakprogress
07/31/2026Tenant Protection Plan Compliance1160 5 AVENUEOSAM GAYEDspecial
07/29/2026Mechanical Systems1160 5 AVENUEDavid Robakspecial
07/29/2026Final1160 5 AVENUEDavid Robakprogress
07/08/2026Final1780 GRAND CONCOURSEDavid Robakprogress
07/08/2026Fire-Resistant Penetrations and Joints1780 GRAND CONCOURSEDavid Robakspecial
07/07/2026Final1780 GRAND CONCOURSEDavid Robakprogress
07/07/2026Fire-Resistant Penetrations and Joints1780 GRAND CONCOURSEDavid Robakspecial
05/22/2026Tenant Protection Plan Compliance1160 5 AVENUEOSAM GAYEDspecial
05/22/2026Energy Code Compliance Inspections1160 5 AVENUEDavid Robakprogress
05/22/2026HVAC-R and service water heating system controls1160 5 AVENUEDavid Robakenergy_progress
05/22/2026HVAC-R and service water heating equipment1160 5 AVENUEDavid Robakenergy_progress
05/22/2026HVAC-R and service water piping design and insulation1160 5 AVENUEDavid Robakenergy_progress
05/22/2026Maintenance information1160 5 AVENUEDavid Robakenergy_progress
05/20/2026Final1160 5 AVENUEDavid Robakprogress
05/20/2026Mechanical Systems1160 5 AVENUEDavid Robakspecial
05/13/2026Tenant Protection Plan Compliance1160 5 AVENUEOSAM GAYEDspecial
05/13/2026Lighting in dwelling units1160 5 AVENUEDavid Robakenergy_progress
04/24/2026Final1160 5 AVENUEDavid Robakprogress
04/24/2026Energy Code Compliance Inspections1160 5 AVENUEDavid Robakprogress
04/24/2026Fire-Resistant Penetrations and Joints1160 5 AVENUEDavid Robakspecial
03/10/2026Energy Code Compliance Inspections40 BOND STREETDavid Robakprogress
03/10/2026Final40 BOND STREETDavid Robakprogress
03/10/2026Fire-Resistant Penetrations and Joints40 BOND STREETDavid Robakspecial
05/17/2024Final1780 GRAND CONCOURSEDavid Robakprogress
05/17/2024Fire-Resistant Penetrations and Joints1780 GRAND CONCOURSEDavid Robakspecial
05/15/2024Final1780 GRAND CONCOURSEDavid Robakprogress
05/15/2024Fire-Resistant Penetrations and Joints1780 GRAND CONCOURSEDavid Robakspecial
05/01/2024Tenant Protection Plan Compliance939 WOODYCREST AVENUEOSAM GAYEDspecial
04/23/2024Fire-Resistant Penetrations and Joints939 WOODYCREST AVENUEDavid Robakspecial
04/23/2024Final939 WOODYCREST AVENUEDavid Robakprogress
04/23/2024Interior lighting power939 WOODYCREST AVENUEDavid Robakenergy_progress
12/27/2023Fire-Resistant Penetrations and Joints4445 POST ROADDavid Robakspecial
12/26/2023Final4445 POST ROADDavid Robakprogress
10/26/2023Energy Code Compliance Inspections315 WEST 57 STREETDavid Robakprogress
10/26/2023Final315 WEST 57 STREETDavid Robakprogress
10/26/2023Fire-Resistance Rated Construction315 WEST 57 STREETDavid Robakprogress
10/26/2023Fire-Resistant Penetrations and Joints315 WEST 57 STREETDavid Robakspecial
10/26/2023Tenant Protection Plan Compliance315 WEST 57 STREET—special
07/10/2023Fire-Resistant Penetrations and Joints1700 GRAND CONCOURSEDavid Robakspecial
07/10/2023Lighting in dwelling units1700 GRAND CONCOURSEDavid Robakenergy_progress
07/10/2023Energy Code Compliance Inspections1700 GRAND CONCOURSEDavid Robakprogress
07/10/2023Fire-Resistance Rated Construction1700 GRAND CONCOURSEDavid Robakprogress
07/10/2023Final1700 GRAND CONCOURSEDavid Robakprogress
Latest 50 of 150.
▾Documents — 488 on file (BIS + DOB NOW)
▸Plans & Drawings86
▸DOB NOWPlans/Sketch86
09/02/2026M00702441-I1 · 1160 5 AVENUERequest digital key ↗
Showing 3 of 86 on file for this type
▸Applications & Permits11
▸DOB NOWLPC Approval/Permit8
08/22/2026M01438337-S1 · 1160 5 AVENUEOpen ↗
08/17/2026M01392669-P1 · 1160 5 AVENUEOpen ↗
08/13/2026M01369669-I1 · 40 BOND STREETOpen ↗
Showing 3 of 8 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit3
08/13/2026M01239798-I1 · 315 WEST 57 STREETOpen ↗
08/13/2026M00856850-I1 · 315 WEST 57 STREETOpen ↗
08/13/2026M00617989-I1 · 315 WEST 57 STREETOpen ↗
▸Seals & Professional Certifications275
▸DOB NOWProgress Inspector Seal & Signature110
09/25/2026X00649333-I1 · 939 WOODYCREST AVENUEOpen ↗
09/25/2026X00649333-I1 · 939 WOODYCREST AVENUEOpen ↗
09/23/2026M01438337-I1 · 1160 5 AVENUEOpen ↗
Showing 3 of 110 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature86
09/03/2026M00617989-I1 · 315 WEST 57 STREETOpen ↗
09/02/2026M00732579-S1 · 315 WEST 57 STREETOpen ↗
09/02/2026M00732579-I1 · 315 WEST 57 STREETOpen ↗
Showing 3 of 86 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature79
09/25/2026X00649333-I1 · 939 WOODYCREST AVENUEOpen ↗
09/23/2026M00624174-I1 · 315 WEST 57 STREETOpen ↗
09/23/2026Q00761884-S1 · 20-21 SEAGIRT BOULEVARDOpen ↗
Showing 3 of 79 on file for this type
▸Safety & Tenant Protection16
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist13
09/02/2026M00732579-I1 · 315 WEST 57 STREETOpen ↗
09/02/2026M00732579-S1 · 315 WEST 57 STREETOpen ↗
09/02/2026M00709939-I1 · 315 WEST 57 STREETOpen ↗
Showing 3 of 13 on file for this type
▸DOB NOWCertificate of No Harassment3
08/13/2026M01239798-I1 · 315 WEST 57 STREETOpen ↗
08/13/2026M00617989-I1 · 315 WEST 57 STREETOpen ↗
08/13/2026M00856850-I1 · 315 WEST 57 STREETOpen ↗
▸Environmental & Asbestos81
▸DOB NOWDEP ACP-5: Asbestos Assessment Report78
09/03/2026M00617989-I1 · 315 WEST 57 STREETOpen ↗
09/02/2026M00732579-S1 · 315 WEST 57 STREETOpen ↗
09/02/2026M00732579-I1 · 315 WEST 57 STREETOpen ↗
Showing 3 of 78 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/13/2026M08022409-S1 · 151 EAST 80 STREETOpen ↗
Showing 1 of 3 on file for this type
▸Energy Compliance16
▸DOB NOWEN2: As Built Energy Analysis16
09/02/2026M00732579-I1 · 315 WEST 57 STREETOpen ↗
09/02/2026M00709939-I1 · 315 WEST 57 STREETOpen ↗
08/13/2026X00705541-I1 · 939 WOODYCREST AVENUEOpen ↗
Showing 3 of 16 on file for this type
▸Inspections & Test Reports2
▸DOB NOWHydrant Flow Test Letter2
08/26/2026Q00761853-S1 · 20-20 SEAGIRT BOULEVARDOpen ↗
Showing 1 of 2 on file for this type
▸Other Documents1
▸DOB NOWHydraulic Calculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type