← Back
Elevator apt, semi-fireproof without stores
20-20 SEAGIRT BOULEVARD
QUEENS · Far Rockaway-Bayswater · BIN 4440257
💬 Discuss this project
1952Year Built
6Stories
D1Building Class
R5Zoning
473,691 sfGross Floor Area
572Units
LL97 CoveredRent Stabilized22 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: ROCKAWAY ONE COMPANY, · 352,825 sf lot · 1.34 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalMechanicalPlumbingEquipmentLandscapeGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 1 filing · 9 docs
Floor 32p · 1 filing · 7 docs
Floor 2
Floor 14p · 1 filing · 2 docs
Cellar18p · 1 filing · 15 docs
Site & exterior5p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PELICAN MANAGEMENT2409/02/2026
ROCKAWAY ONE COMPANY1303/22/2026
TOPLINE NYC CONTRACTING303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN DESIGN206/04/2026
ASR ENGINEERING PC110/01/2023
FIRM ENGINEERING, P.C.107/27/2023
GERALD CALIENDO ARCHITECTS308/29/2022
ROBAK ARCHITECTURE, LLC104/16/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PELICAN MANAGEMENT603/21/2026
GERALD J CALIENDO ARCHITECT603/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARON CONSTRUCTION INCGeneral Contractor303/21/2026
A & E CONSTRUCTION OF NYGeneral Contractor303/21/2026
TOPLINE NYC CONTRACTINGGeneral Contractor303/21/2026
AL-ARSH CONSTRUCTION CORPGeneral Contractor203/21/2026
A J IANNI ELECL CONTS INCElectrical103/22/2026
EXPRESS PL SWR & WTR APlumbing107/08/2026
LUNA NYC ELECTRIC CORPElectrical103/22/2026
VLASHAVA ELEC CONTR'G CORElectrical103/22/2026
DMG GROUP NYC LTDGeneral Contractor106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUTTERFIELD & O'CONNOR4189206/04/2026
J C PROFESSIONALS LLC1431506/04/2026
BENAZZI ENGINEERING, PC5603107/27/2023
FIRM ENGINEERING, P.C.6012107/27/2023
ROBAK ARCHITECTURE, LLC7952108/09/2022
Building Lifecycle
All (101)Filed (8)Permit Issued (6)Signed Off (5)Facade (FISP) (3)Violation (49)Inspection (7)Objection (4)Special Inspection (19)
07/16/2026
Objection resolved — Resolved
07/07/2026
Objection raised — Scope
06/26/2026
Permit issued — General Construction
Q01293579-I1-GC
06/04/2026
Filed — Alteration
Install railings on parapet at the roof level to meet FISP requirements.
Q01293579-P1
06/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
OSAM GAYED
06/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN T. O'CONNOR
06/03/2026
Special inspection requirement — Final
BRIAN T. O'CONNOR
12/20/2025
Violation issued (HPD, closed)
B
12/20/2025
Violation issued (HPD, closed)
B
11/06/2025
Objection resolved — Addressed
10/21/2025
Objection raised — Inspections
10/03/2025
Filed — Alteration
Install railings on parapet at the roof level to meet FISP requirements.
Q01293579-I1
08/19/2024
Signed off — Alteration
FACADE REPAIR WORK TO COMPLY WITH LL11/1998. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00908767-I1
03/04/2024
Signed off — Alteration
Q00940718-I1
01/16/2024
Cycle 9 facade report submitted
01/13/2024
Cycle 9 facade inspection completed
01/13/2024
Cycle 9 facade report signed — SWARMP
10/02/2023
Permit issued — Sidewalk Shed
Q00940718-I1-SH
10/01/2023
Filed — Alteration
Q00940718-I1
08/16/2023
Permit issued — General Construction
Q00908767-I1-GC
07/27/2023
Filed — Alteration
FACADE REPAIR WORK TO COMPLY WITH LL11/1998. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00908767-I1
07/25/2023
Special inspection requirement — Tenant Protection Plan Compliance
Gregory Benazzi
07/25/2023
Special inspection requirement — Energy Code Compliance Inspections
Terence Hudson
07/25/2023
Special inspection requirement — Masonry
Terence Hudson
07/25/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Terence Hudson
07/24/2023
Special inspection requirement — Final
Terence Hudson
06/14/2023
Signed off — Alteration
HEREWITH FILING SUBSEQUENT APPLICATION FOR PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES TO INCLUDE 3 GAS DRYERS, 1 FLOOR DRAINS, 1 TRENCH DRAIN, 5 WASHERS AND 14 SPRINKLER HEADS TO BE TAKEN OFF OF DOMESTIC WATER SERVICE. ALSO TO REMOVE & REPLACE EXISTIN
Q00761867-S1
05/30/2023
Signed off — Alteration
HEREWITH FILING SUBSEQUENT APPLICATION FOR PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES TO INCLUDE 3 GAS DRYERS, 1 FLOOR DRAINS, 1 TRENCH DRAIN, 5 WASHERS AND 14 SPRINKLER HEADS TO BE TAKEN OFF OF DOMESTIC WATER SERVICE. ALSO TO REMOVE & REPLACE EXISTIN
Q00761867-I1
05/26/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/13/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/29/2023
Violation issued (ECB, closed)
Construction
03/07/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2023
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
02/17/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
01/04/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/25/2022
Permit issued — Plumbing
Q00761867-S1-PL
08/29/2022
Filed — Alteration
HEREWITH FILING SUBSEQUENT APPLICATION FOR PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES TO INCLUDE 3 GAS DRYERS, 1 FLOOR DRAINS, 1 TRENCH DRAIN, 5 WASHERS AND 14 SPRINKLER HEADS TO BE TAKEN OFF OF DOMESTIC WATER SERVICE. ALSO TO REMOVE & REPLACE EXISTIN
Q00761867-P1
08/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
OSAM GAYED
08/26/2022
Special inspection requirement — Sprinkler Systems
08/09/2022
Filed — Alteration
HEREWITH FILING SUBSEQUENT APPLICATION FOR PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES TO INCLUDE 3 GAS DRYERS, 1 FLOOR DRAINS, 1 TRENCH DRAIN, 5 WASHERS AND 14 SPRINKLER HEADS TO BE TAKEN OFF OF DOMESTIC WATER SERVICE. ALSO TO REMOVE & REPLACE EXISTIN
Q00761867-S1
08/02/2022
Permit issued — General Construction
Q00761867-I1-GC
07/19/2022
Filed — Alteration
HEREWITH FILING SUBSEQUENT APPLICATION FOR PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES TO INCLUDE 3 GAS DRYERS, 1 FLOOR DRAINS, 1 TRENCH DRAIN, 5 WASHERS AND 14 SPRINKLER HEADS TO BE TAKEN OFF OF DOMESTIC WATER SERVICE. ALSO TO REMOVE & REPLACE EXISTIN
Q00761867-I1
07/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
OSAM GAYED
07/15/2022
Special inspection requirement — Energy Code Compliance Inspections
OSAM GAYED
07/15/2022
Special inspection requirement — Fire-Resistance Rated Construction
OSAM GAYED
07/15/2022
Special inspection requirement — Interior lighting power
OSAM GAYED
07/15/2022
Special inspection requirement — Lighting controls
OSAM GAYED
06/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/30/2022
Violation issued (HPD, closed)
C
03/30/2022
Violation issued (HPD, closed)
B
03/30/2022
Violation issued (HPD, closed)
B
03/30/2022
Violation issued (HPD, closed)
C
11/30/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/03/2021
Violation issued (HPD, closed)
B
08/03/2021
Violation issued (HPD, closed)
B
08/03/2021
Violation issued (HPD, closed)
B
08/03/2021
Violation issued (HPD, closed)
B
08/03/2021
Violation issued (HPD, closed)
B
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDMG GROUP NYC LTD06/26/2026
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING10/02/2023
DOB NOWGeneral ConstructionSigned-offAL-ARSH CONSTRUCTION CORP08/16/2023
DOB NOWPlumbingSigned-offEXPRESS PLBG SWR & WTR MA10/25/2022
DOB NOWGeneral ConstructionSigned-offARON CONSTRUCTION INC08/02/2022
DOB NOWGeneral ConstructionSigned-offA & E CONSTRUCTION OF NY04/23/2021
BISOTISSUEDA & E CONSTRUCTION OF NY11/05/2020
BISOTISSUEDA & E CONSTRUCTION OF NY08/16/2020
BISOTISSUEDLEARDON BOILER WORKS INC11/23/2015
BISFSISSUEDROBERT C VEGA12/07/2004
BISFBISSUEDABILENE, INC10/08/1997
13 projects · most recent 07/24/2025
General Wiring
FiledStatusContractorScope
07/24/2025CompleteLUNA NYC ELECTRIC CORPGeneral Wiring
07/23/2025CompleteLUNA NYC ELECTRIC CORPGeneral Wiring
07/22/2025CompleteLUNA NYC ELECTRIC CORPGeneral Wiring
07/22/2025CompleteLUNA NYC ELECTRIC CORPGeneral Wiring
10/03/2023CompleteRICHARD NEU—
12/31/2022CompleteLUNA NYC ELECTRIC CORPGeneral Wiring
12/07/2021CompleteLUNA NYC ELECTRIC CORPGeneral Wiring
04/12/2021Permit IssuedA J IANNI ELECL CONTS INCGeneral Wiring
12/16/2020Permit IssuedA J IANNI ELECL CONTS INCGeneral Wiring
09/03/2020Permit IssuedVLASHAVA ELEC CONTR'G CORGeneral Wiring
09/01/2020Permit IssuedA J IANNI ELECL CONTS INCGeneral Wiring
06/29/2020Permit IssuedA J IANNI ELECL CONTS INCGeneral Wiring
06/19/2019CompleteA J IANNI ELECL CONTS INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/26/2023Pass-Final General Construction Non-Directive 14PassView ↗
04/13/2023Fail-Final General Construction Non-Directive 14FailView ↗
03/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/22/2023Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
02/17/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
01/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
06/04/2026Tenant Protection Plan ComplianceOSAM GAYEDspecial
06/03/2026Structural Stability – Alterations of existing buildingsBRIAN T. O'CONNORspecial
06/03/2026FinalBRIAN T. O'CONNORprogress
07/25/2023Tenant Protection Plan ComplianceGregory Benazzispecial
07/25/2023Energy Code Compliance InspectionsTerence Hudsonprogress
07/25/2023MasonryTerence Hudsonspecial
07/25/2023Structural Stability – Alterations of existing buildingsTerence Hudsonspecial
07/24/2023FinalTerence Hudsonprogress
08/26/2022Fire-Resistant Penetrations and JointsOSAM GAYEDspecial
08/26/2022Sprinkler Systems—special
07/15/2022Fire-Resistant Penetrations and JointsOSAM GAYEDspecial
07/15/2022Energy Code Compliance InspectionsOSAM GAYEDprogress
07/15/2022Fire-Resistance Rated ConstructionOSAM GAYEDprogress
07/15/2022Interior lighting powerOSAM GAYEDenergy_progress
07/15/2022Lighting controlsOSAM GAYEDenergy_progress
04/16/2021Lighting in dwelling unitsDavid Robakenergy_progress
04/16/2021Energy Code Compliance InspectionsDavid Robakprogress
04/16/2021FinalDavid Robakprogress
04/16/2021Fire-Resistant Penetrations and JointsOSAM GAYEDspecial
▾Documents — 107 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026Q00505418-I1Request digital key ↗
08/26/2026Q00761867-P1Request digital key ↗
08/26/2026Q00761867-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
11/05/2020440642084Open ↗
08/16/2020440616763Open ↗
11/20/2015440269843Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
10/29/2020440642084Open ↗
08/12/2020440616763Open ↗
11/20/2015440269843Open ↗
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature9
09/13/2026Q00505418-I1Open ↗
09/13/2026Q00505418-I1Open ↗
08/29/2026Q01293579-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026Q00505418-I1Open ↗
08/26/2026Q00761867-S1Open ↗
08/26/2026Q00761867-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/13/2026Q00505418-I1Open ↗
08/29/2026Q01293579-P1Open ↗
08/29/2026Q01293579-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/29/2020440642084Open ↗
08/12/2020440616763Open ↗
11/20/2015440269843Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/29/2020440642084Open ↗
08/12/2020440616763Open ↗
11/20/2015440269843Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/29/2020440642084Open ↗
08/12/2020440616763Open ↗
11/20/2015440269843Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/01/2018440269843Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/30/2016440269843Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/20/2015440269843Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
10/29/2020440642084Open ↗
08/12/2020440616763Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026Q00505418-I1Open ↗
08/26/2026Q00761867-I1Open ↗
08/26/2026Q00761867-S1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
10/29/2020440642084Open ↗
08/12/2020440616763Open ↗
11/20/2015440269843Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
09/07/2021440642084Open ↗
07/27/2021440616763Open ↗
11/05/2020440642084Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
09/07/2021440642084Open ↗
07/27/2021440616763Open ↗
03/01/2018440269843Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
10/29/2020440642084Open ↗
08/12/2020440616763Open ↗
11/20/2015440269843Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/01/2018440269843Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00505418-I1Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY10
09/07/2021440642084Open ↗
07/27/2021440616763Open ↗
01/29/2021400770590Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
09/07/2021440642084Open ↗
07/27/2021440616763Open ↗
03/01/2018440269843Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/01/2018440269843Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
09/07/2021440642084Open ↗
07/27/2021440616763Open ↗
10/29/2020440642084Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION4
10/29/2020440642084Open ↗
10/29/2020440642084Open ↗
08/12/2020440616763Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
10/29/2020440642084Open ↗
08/12/2020440616763Open ↗
11/20/2015440269843Open ↗
▸BISBOROUGH INTAKE FORM1
03/01/2018440269843Open ↗