| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q00955389 ↗ | 18-05 215TH STREET QUEENS | Alteration | Permit Issued | 11/09/2023 | 11/16/2023 | Design ROBERT GERMAIN JR. PE Contractor EMG INDUSTRIAL CHIMNEY IN | INSTALL (1) NEW 7/10 GAGE 304 STAINLESS STEEL CHIMNEY LINER IN EXISTING BRICK CHIMNEY. RECONNECT BREACHING. NO CHANGE IN MEANS OF EGRESS U… |
| Q00584298 ↗ | 18-05 215TH STREET QUEENS | Alteration | Signed-off | 09/14/2021 | 12/13/2022 | Design JOSE M. LANDAURO, P.E. Contractor CENTRAL CONSTRUCTION MANAGEMENT | filing for Local Law 11 Facade FISP Repairs as shown on drawings filed herewith. No change in use, egress or occupancy. |
| Q00508899 ↗ | 18-05 215TH STREET QUEENS | Alteration | Signed-off | 04/27/2021 | 10/12/2021 | Design H. T. LYONS Contractor J.M. BOTTO INC | INSTALL A NEW BOILER AND PART OF BOILER EQUIPMENT UPGRADE. TWO EXISTING BOILERS REPLACED UNDER SEPARATE APPLIACTION, |
| Q00237178 ↗ | 18-05 215TH STREET QUEENS | Alteration | Signed-off | 10/09/2019 | 10/06/2021 | Design H. T. LYONS Contractor J.M. BOTTO INC | REPLACE TWO BOILERS. REMOVE ONE HEAT EXCHANGER, REPLACE THREE HEAT EXCHANGERS, AND ADD ONE HEAT EXCHANGER. PIPING AND PUMPS FILED UNDER MEC… |
| Q00234759 ↗ | 18-05 215TH STREET QUEENS | Alteration | Signed-off | 10/02/2019 | 07/26/2021 | Design H. T. LYONS Contractor TRYSTATE MECHANICAL, INC | INSTALL 3 MIRCOTURBINES, REPLACE ABSORBER WITH ENGINE DRIVEN CHILLER WITH ASSOCIATED PUMPS, PIPNG AND CONTROLS. (FILED SEPARATELY- REPLACE 2… |
| Q00236934 ↗ | 18-05 215TH STREET QUEENS | Alteration | Signed-off | 10/02/2019 | 06/04/2020 | Design H. T. LYONS Contractor J.M. BOTTO INC | GAS PIPING TO EXISTING BOILERS, NEW GAS TRAIN PIPING TO BOILERS AND MIRCOTURBINES. NEW MAKEUP WATER PIPING TO BOILERS AND HEATING LOOP. |
| Name | Projects together | Most recent |
|---|---|---|
| H. T. Lyons | 4 | 04/27/2021 |
| Jose M. Landauro, P.E. | 1 | 09/14/2021 |
| Robert Germain Jr. PE | 1 | 11/09/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| J.M. Botto | 3 | 04/27/2021 |
| Central Construction Management | 1 | 09/14/2021 |
| Emg Industrial Chimney | 1 | 11/09/2023 |
| Trystate Mechanical | 1 | 10/02/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| Right Way Services NYC | 1 | 09/14/2021 |
| Sterling Engineering Services | 1 | 04/27/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q00955389 ↗ | 18-05 215TH STREET QUEENS | Alteration | Permit Issued | 11/09/2023 | 11/16/2023 | Design ROBERT GERMAIN JR. PE Contractor EMG INDUSTRIAL CHIMNEY IN | INSTALL (1) NEW 7/10 GAGE 304 STAINLESS STEEL CHIMNEY LINER IN EXISTING BRICK CHIMNEY. RECONNECT BREACHING. NO CHANGE IN MEANS OF EGRESS U… |
| Q00584298 ↗ | 18-05 215TH STREET QUEENS | Alteration | Signed-off | 09/14/2021 | 12/13/2022 | Design JOSE M. LANDAURO, P.E. Contractor CENTRAL CONSTRUCTION MANAGEMENT | filing for Local Law 11 Facade FISP Repairs as shown on drawings filed herewith. No change in use, egress or occupancy. |
| Q00508899 ↗ | 18-05 215TH STREET QUEENS | Alteration | Signed-off | 04/27/2021 | 10/12/2021 | Design H. T. LYONS Contractor J.M. BOTTO INC | INSTALL A NEW BOILER AND PART OF BOILER EQUIPMENT UPGRADE. TWO EXISTING BOILERS REPLACED UNDER SEPARATE APPLIACTION, |
| Q00237178 ↗ | 18-05 215TH STREET QUEENS | Alteration | Signed-off | 10/09/2019 | 10/06/2021 | Design H. T. LYONS Contractor J.M. BOTTO INC | REPLACE TWO BOILERS. REMOVE ONE HEAT EXCHANGER, REPLACE THREE HEAT EXCHANGERS, AND ADD ONE HEAT EXCHANGER. PIPING AND PUMPS FILED UNDER MEC… |
| Q00234759 ↗ | 18-05 215TH STREET QUEENS | Alteration | Signed-off | 10/02/2019 | 07/26/2021 | Design H. T. LYONS Contractor TRYSTATE MECHANICAL, INC | INSTALL 3 MIRCOTURBINES, REPLACE ABSORBER WITH ENGINE DRIVEN CHILLER WITH ASSOCIATED PUMPS, PIPNG AND CONTROLS. (FILED SEPARATELY- REPLACE 2… |
| Q00236934 ↗ | 18-05 215TH STREET QUEENS | Alteration | Signed-off | 10/02/2019 | 06/04/2020 | Design H. T. LYONS Contractor J.M. BOTTO INC | GAS PIPING TO EXISTING BOILERS, NEW GAS TRAIN PIPING TO BOILERS AND MIRCOTURBINES. NEW MAKEUP WATER PIPING TO BOILERS AND HEATING LOOP. |
| Building | Filings | Most Recent |
|---|---|---|
| 18-05 215TH STREET ↗ | 11 | 10/30/2023 |