| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01334807 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 01/14/2026 | 07/15/2026 | Design ANB Engineering PC Contractor AIRTRONICS AIR COND CORP Filer I & L CONSULTING, INC. | INSTALL HVAC SYSTEM AS PER PLANS SUBMITTED HEREWITH. |
| M01335034 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 01/14/2026 | 06/22/2026 | Design ANB Engineering PC Contractor VILLAGE P & H NY INC Filer I & L CONSULTING, INC. | Modification to existing sprinkler system as per plans submitted herewith. |
| M01306064 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 11/05/2025 | 12/02/2025 | Design FRANK DENNER ARCHITECT Contractor SHARI DECOR LLC Filer I & L CONSULTING, INC. | Interior renovation to existing office space on on part of the 5th floor. Remove and construct non bearing partition. the hung ceiling, and … |
| M01290305 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 10/08/2025 | 10/09/2025 | Design IW ARCHITECTURE, PLLC Contractor MAUCERI SIGN CO., INC Filer MAUCERI SIGN CO. | ERECT A NON-ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01290312 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 10/08/2025 | 10/09/2025 | Design IW ARCHITECTURE, PLLC Contractor MAUCERI SIGN CO., INC Filer MAUCERI SIGN CO. | ERECT A NON-ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01289578 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Signed-off | 09/19/2025 | 10/07/2025 | Design GREGORY RALPH, ARCHITECT Contractor 18-15 REALTY LLC Filer GREGORY RALPH, ARCHITECT | Plumbing work for alterations for tenant fit-out of office space at this location. No change in use, egress, or occupancy under this applic… |
| Name | Projects together | Most recent |
|---|---|---|
| MG Engineering | 8 | 05/02/2025 |
| Gensler | 3 | 05/02/2025 |
| ANB Engineering | 2 | 01/14/2026 |
| IW Architecture | 2 | 10/08/2025 |
| Prospect Engineering | 2 | 02/22/2021 |
| Andrew Zaki | 1 | 03/23/2026 |
| Frank Denner Architect | 1 | 11/05/2025 |
| Gilsanz Murray Steficek | 1 | 01/22/2025 |
| Gregory Ralph, Architect | 1 | 03/23/2026 |
| M-Engineering New York | 1 | 11/12/2019 |
| Salvator A. Caradonna JR | 1 | 10/15/2019 |
| Socotec | 1 | 11/17/2023 |
| Thornton Tomasetti | 1 | 05/12/2020 |
| Vesselin Kovatchev Architect | 1 | 06/17/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| Blade Contracting | 3 | 01/22/2025 |
| Savcon Construction | 3 | 05/02/2025 |
| Mauceri Sign Systems | 2 | 10/08/2025 |
| Skinner Plumbing & Heating | 2 | 11/22/2021 |
| Tower Fire Protection | 2 | 01/28/2021 |
| Unitech Design | 2 | 02/22/2021 |
| Airtronics Air Cond | 1 | 01/14/2026 |
| American Build PLB & HT | 1 | 06/17/2020 |
| Five Boro Associates | 1 | 01/22/2025 |
| M & S Building Services I | 1 | 06/14/2021 |
| M & S Mechanical Services | 1 | 10/18/2022 |
| Michelle Kuo | 1 | 03/23/2026 |
| National Maintenance | 1 | 10/15/2019 |
| Paramount Services | 1 | 01/14/2026 |
| Shari Decor | 1 | 11/05/2025 |
| Solution Mechanical Contng | 1 | 01/22/2025 |
| Wasoff Plumbing & Utility | 1 | 03/23/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Framework Consultants | 3 | 01/22/2025 |
| I & L Consulting | 3 | 01/14/2026 |
| Rizzo Group | 3 | 05/02/2025 |
| Beam Living | 2 | 01/22/2025 |
| BMB Building Consulting | 2 | 02/22/2021 |
| Mauceri Sign | 2 | 10/08/2025 |
| Adam Maiser | 1 | 11/22/2021 |
| Gregory Ralph, Architect | 1 | 03/23/2026 |
| Socotec | 1 | 11/17/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01334807 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 01/14/2026 | 07/15/2026 | Design ANB Engineering PC Contractor AIRTRONICS AIR COND CORP Filer I & L CONSULTING, INC. | INSTALL HVAC SYSTEM AS PER PLANS SUBMITTED HEREWITH. |
| M01335034 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 01/14/2026 | 06/22/2026 | Design ANB Engineering PC Contractor VILLAGE P & H NY INC Filer I & L CONSULTING, INC. | Modification to existing sprinkler system as per plans submitted herewith. |
| M01306064 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 11/05/2025 | 12/02/2025 | Design FRANK DENNER ARCHITECT Contractor SHARI DECOR LLC Filer I & L CONSULTING, INC. | Interior renovation to existing office space on on part of the 5th floor. Remove and construct non bearing partition. the hung ceiling, and … |
| M01290305 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 10/08/2025 | 10/09/2025 | Design IW ARCHITECTURE, PLLC Contractor MAUCERI SIGN CO., INC Filer MAUCERI SIGN CO. | ERECT A NON-ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01290312 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 10/08/2025 | 10/09/2025 | Design IW ARCHITECTURE, PLLC Contractor MAUCERI SIGN CO., INC Filer MAUCERI SIGN CO. | ERECT A NON-ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01289578 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Signed-off | 09/19/2025 | 10/07/2025 | Design GREGORY RALPH, ARCHITECT Contractor 18-15 REALTY LLC Filer GREGORY RALPH, ARCHITECT | Plumbing work for alterations for tenant fit-out of office space at this location. No change in use, egress, or occupancy under this applic… |
| M01138605 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 05/02/2025 | 07/30/2025 | Design MG ENGINEERING D.P.C. Contractor SAVCON CONSTRUCTION LLC Filer RIZZO GROUP | Filing for General construction modifications to include an interior demo to the 7th floor as per plans filed herewith. No change in use, eg… |
| M00999877 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 02/14/2024 | 01/09/2025 | Design GENSLER Contractor SAVCON CONSTRUCTION LLC Filer RIZZO GROUP | Filing for Mechanical modifications pre-built to the 8th floor as per plans filed herewith. No change in use, egress, or occupancy. |
| M00950459 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 11/09/2023 | 12/06/2024 | Design MG ENGINEERING D.P.C. Contractor SAVCON CONSTRUCTION LLC Filer RIZZO GROUP | Sprinkler modifications to include white box scope to the 8 & 9th Floor as per plans filed herewith. No change in use egress or occupancy. |
| M00895419 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 06/27/2023 | 10/28/2024 | Design GILSANZ MURRAY STEFICEK LLP Contractor BLADE CONTRACTING INC | FOUNDATION WALL REPAIRS PER PLANS FILED. NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION |
| M00926373 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Signed-off | 11/17/2023 | 06/10/2024 | Design SOCOTEC, INC. Contractor BLADE CONTRACTING INC Filer SOCOTEC, Inc | Guardrail installation at roof. No change in egress, use or occupancy. |
| M00414558 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 01/28/2021 | 04/22/2024 | Design MG ENGINEERING D.P.C. Contractor TPC THIRD PARTY CONSULT L | UPDATE EXISTING SPRINKLER SYSTEM TO ADD 58 NEW WET SPRINKLER HEADS AT VARIOUS FLOORS AND ASSOCIATED PIPING TO COMPLY WITH CODE AS PER PLANS;… |
| M00586902 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Signed-off | 11/22/2021 | 11/23/2021 | Design MG ENGINEERING D.P.C. Contractor SKINNER PLMNG & HTG CORP Filer ADAM MAISER | Modification of existing sprinkler system at the Sub-Cellar level. Sprinkler work. There is to be no change of use, occupancy, or egress. |
| M00345909 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Signed-off | 05/12/2020 | 11/19/2021 | Design THORNTON TOMASETTI Contractor BLADE CONTRACTING INC | STRUCTURAL MODIFICATIONS TO THE ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00482628 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Signed-off | 06/14/2021 | 07/15/2021 | Design MG ENGINEERING D.P.C. Contractor M & S BUILDING SERVICES I | plumbing work associated with the replacement of a steam station |
| M00482529 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Signed-off | 06/14/2021 | 07/14/2021 | Design MG ENGINEERING D.P.C. Contractor M & S MECHANICAL SERVICES | mechanical work associated with the replacement of the steam station |
| M00471227 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Signed-off | 02/22/2021 | 02/22/2021 | Design PROSPECT ENGINEERING P.C Contractor UNITECH DESIGN INC | PROPOSE TO INSTALL NON-ILLUMINATED ACCESSORY BUSINESS SIGN. WORDING: UOB BUILDING/ 592 FIFTH AVENUE |
| M00319989 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Signed-off | 03/03/2020 | 03/06/2020 | Design VESSELIN KOVATCHEV ARCHITECT Contractor AMERICAN BUILD PLB&HT INC | Install plumbing works in conjunction with Alt II# 123569316. |
| M00195156 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Signed-off | 10/15/2019 | 10/18/2019 | Design SALVATOR A. CARADONNA JR. Contractor NATIONAL MAINTENANCE, INC | ERECT NON-ILLUMINATED ACCESSORY BUSINESS SIGN FOR LULULEMON ON 5TH AVENUE ELEVATION. NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 … |
| M00207490 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Signed-off | 09/13/2019 | 10/02/2019 | Design MG ENGINEERING D.P.C. Contractor TPC THIRD PARTY CONSULT L | PROPOSED SPRINKLER SYSTEM UPGRADE TO INCLUDE THE REMOVAL OF EXISTING SPRINKLER PIPING; ALARM CHECK VALVES; SPRINKLER METER ASSEMBLIES TO BE … |
| M00204244 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Signed-off | 08/07/2019 | 09/12/2019 | Design M-ENGINEERING NEW YORK, LLC Contractor SKINNER PLMNG & HTG CORP Filer ADAM MAISER | Sprinkler work filed in conjunction with renovation of existing commercial space. No change to use, occupancy, or egress. |
| M00165248 ↗ | 592 5TH AVENUE MANHATTAN | Alteration | Signed-off | 06/13/2019 | 06/13/2019 | Design PROSPECT ENGINEERING P.C Contractor UNITECH DESIGN INC | (4) to install non illuminated accessory business sign |
| Building | Filings | Most Recent |
|---|---|---|
| 592 5TH AVENUE ↗ | 41 | 01/28/2026 |