← Back
Filing Representative Firm
ASHOK ARCHITECTURE DESIGN, PLLC
Expediter
QUEENS · 9
5 buildings
22
Total Filings
9
Projects on File
5
Buildings Worked
0
Projects w/ Open Permits
Expediter
Role
Activity
Projects by first filing month9 projects all-time
0134Nov '19 · 2Apr '20 · 1Jan '21 · 2May '22 · 3Jul '23 · 12020202120222023
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Signed off9100%
By project type
Alteration9
Most active buildings
All buildings →
12-63 REDFERN AVENUEQUEENS · latest 01/12/2024
3 projects
23-61 BORDEN AVENUEQUEENS · latest 05/04/2021
2 projects
12-21 REDFERN AVENUEQUEENS · latest 03/13/2023
2 projects
23-49 BORDEN AVENUEQUEENS · latest 05/04/2021
1 projects
12-11 REDFERN AVENUEQUEENS · latest 06/16/2022
1 projects
Key relationships
Everyone →
Design firms
Contractors
Owners
3 projects
Ashish Patellatest 03/06/2024
9 filings
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
Q00648952 ↗12-63 REDFERN AVENUE
QUEENS
AlterationSigned-off07/07/202301/12/2024
Contractor GREENSIDE CORP
Provide New Mechanical System (Heating System, Ventilation System, Air-conditioning System, Associated Ducts and Piping for Entire Building …
Q00726374 ↗12-63 REDFERN AVENUE
QUEENS
AlterationSigned-off05/02/202206/29/2023Sprinkler Filing
Q00442461 ↗12-21 REDFERN AVENUE
QUEENS
AlterationSigned-off01/22/202103/13/2023
Contractor GREENSIDE CORP
1. Provide New Mechanical System (Heating System, Ventilation System, Air-conditioning System, Associated Ducts and Piping for Entire Buildi…
Q00648946 ↗12-63 REDFERN AVENUE
QUEENS
AlterationSigned-off05/03/202202/20/2023Plumbing Scope of Work Installation of Floor and Roof Drains. New Gas Meter Installation and New Gas Line Connection for Roof Top Air Conden…
Q00501535 ↗12-11 REDFERN AVENUE
QUEENS
AlterationSigned-off05/03/202206/16/2022Sprinkler Filing
Q00421477 ↗12-21 REDFERN AVENUE
QUEENS
AlterationSigned-off01/21/202105/28/2022New Building with Male and Female Toilets on 1ST and 2ND. Residential Sink on Second Floor. Elevator Sump Pump. Roof and Terrace Areas Floor…
Counts cover all 9 projects (9 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Every person filing for this firm, identified by their DOB NOW contact id (one id is one person). A person is listed under the firm they file for most.
PersonFilingsMost recent
Ashish Patel903/06/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
A&D ENGINEERING, PLLC905/08/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ARCO PLBG AND HTG INC709/13/2023
GREENSIDE CORP205/08/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
BBST REALTY LLC310/15/2021
9 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 9Signed off 9
9 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
Q00648952 ↗12-63 REDFERN AVENUE
QUEENS
AlterationSigned-off07/07/202301/12/2024
Contractor GREENSIDE CORP
Provide New Mechanical System (Heating System, Ventilation System, Air-conditioning System, Associated Ducts and Piping for Entire Building …
Q00726374 ↗12-63 REDFERN AVENUE
QUEENS
AlterationSigned-off05/02/202206/29/2023Sprinkler Filing
Q00442461 ↗12-21 REDFERN AVENUE
QUEENS
AlterationSigned-off01/22/202103/13/2023
Contractor GREENSIDE CORP
1. Provide New Mechanical System (Heating System, Ventilation System, Air-conditioning System, Associated Ducts and Piping for Entire Buildi…
Q00648946 ↗12-63 REDFERN AVENUE
QUEENS
AlterationSigned-off05/03/202202/20/2023Plumbing Scope of Work Installation of Floor and Roof Drains. New Gas Meter Installation and New Gas Line Connection for Roof Top Air Conden…
Q00501535 ↗12-11 REDFERN AVENUE
QUEENS
AlterationSigned-off05/03/202206/16/2022Sprinkler Filing
Q00421477 ↗12-21 REDFERN AVENUE
QUEENS
AlterationSigned-off01/21/202105/28/2022New Building with Male and Female Toilets on 1ST and 2ND. Residential Sink on Second Floor. Elevator Sump Pump. Roof and Terrace Areas Floor…
Q00223383 ↗23-61 BORDEN AVENUE
QUEENS
AlterationSigned-off11/04/201905/04/2021Sprinkler Filing
Q00232744 ↗23-61 BORDEN AVENUE
QUEENS
AlterationSigned-off11/04/201905/04/2021Building Restoration Work and the vertical Expansion of Existing one story Manufacturing Building. Second story Addition for Commercial Offi…
Q00323922 ↗23-49 BORDEN AVENUE
QUEENS
AlterationSigned-off04/02/202005/04/20211.Connect 2 New Gas to Existing 3 Gas Service. 2.Install New (1) Gas Meter. 3. Connect Existing Unit Heaters to New Gas Line.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
12-63 REDFERN AVENUE ↗603/06/2024
12-21 REDFERN AVENUE ↗501/26/2023
23-61 BORDEN AVENUE ↗610/14/2021
12-11 REDFERN AVENUE ↗104/09/2021
23-49 BORDEN AVENUE ↗403/17/2021
▾Documents — 145 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch - Plumbing14
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch8
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
▸Seals & Professional Certifications106
▸DOB NOWProgress Inspector Seal & Signature45
09/25/2026Q00726374-I1 · 12-63 REDFERN AVENUEOpen ↗
09/21/2026Q00442461-P2 · 12-21 REDFERN AVENUEOpen ↗
09/21/2026Q00442461-P2 · 12-21 REDFERN AVENUEOpen ↗
Showing 3 of 45 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature36
09/25/2026Q00726374-I1 · 12-63 REDFERN AVENUEOpen ↗
09/25/2026Q00726374-I1 · 12-63 REDFERN AVENUEOpen ↗
09/25/2026Q00726374-I1 · 12-63 REDFERN AVENUEOpen ↗
Showing 3 of 36 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/28/2026Q00323922-P1 · 23-49 BORDEN AVENUEOpen ↗
08/28/2026Q00323922-I1 · 23-49 BORDEN AVENUEOpen ↗
08/28/2026Q00323922-P3 · 23-49 BORDEN AVENUEOpen ↗
Showing 3 of 25 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/28/2026Q00323922-P3 · 23-49 BORDEN AVENUEOpen ↗
08/28/2026Q00323922-I1 · 23-49 BORDEN AVENUEOpen ↗
08/14/2026Q00323922-P2 · 23-49 BORDEN AVENUEOpen ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/27/2026Q00232744-I1 · 23-61 BORDEN AVENUEOpen ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00648952-I1 · 12-63 REDFERN AVENUEOpen ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWDEP Variance V5 Letter2
08/13/2026Q00323922-I1 · 23-49 BORDEN AVENUEOpen ↗
08/28/2026Q00323922-I1 · 23-49 BORDEN AVENUEOpen ↗
▸Other Documents3
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)3
08/13/2026Q00421477-I1 · 12-21 REDFERN AVENUEOpen ↗
08/13/2026Q00501535-I1 · 12-11 REDFERN AVENUEOpen ↗
Showing 2 of 3 on file for this type