← Back
Entity
AmWINS
Tenant
MANHATTAN · 4
1 building
4
Total Filings
4
Projects on File
1
Buildings Worked
0
Projects w/ Open Permits
Tenant
Primary Trade
Activity
Not enough dated projects to chart.
Portfolio status
Browse projects →
Signed off4100%
By project type
Alteration4
Most active buildings
All buildings →
88 PINE STREETMANHATTAN · latest 01/05/2022
4 projects
Key relationships
Everyone →
Design firms
1 projects
Filing representatives
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00630344 ↗88 PINE STREET
MANHATTAN
AlterationSigned-off11/16/202101/05/2022Herewith filing modifications to existing sprinkler system at 6th Floor in conjunction with interior renovations. No change in use, egress o…
M00630467 ↗88 PINE STREET
MANHATTAN
AlterationSigned-off11/17/202112/29/2021
Design GENSLER
HEREWITH FILING INTERIOR RENOVATIONS TO 6TH FLOOR OFFICES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY PROPOSED UNDER THIS APPLICATIO…
M00630577 ↗88 PINE STREET
MANHATTAN
AlterationSigned-off11/17/202112/29/2021Herewith filing Plumbing Work in conjunction with Interior Renovations at the 6th Floor (Office Space). No change in use, egress or occupanc…
M00630587 ↗88 PINE STREET
MANHATTAN
AlterationSigned-off11/17/202112/26/2021Herewith filing modification to the Mechanical System in conjunction with 6th Floor Office Renovations. No change in use, egress or occupanc…
Counts cover all 4 projects (4 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
MG ENGINEERING D.P.C.307/19/2022
GENSLER103/25/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
SCHIMENTI CONSTRUCTION CO207/19/2022
A & F FIRE PROTECTION CO111/16/2021
AARON PLBG AND MECH SYST103/25/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ORIENT OVERSEAS ASSOCIATES407/19/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
OUTSOURCE CONSULTANTS, INC.407/19/2022
4 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 4Signed off 4
4 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00630344 ↗88 PINE STREET
MANHATTAN
AlterationSigned-off11/16/202101/05/2022Herewith filing modifications to existing sprinkler system at 6th Floor in conjunction with interior renovations. No change in use, egress o…
M00630467 ↗88 PINE STREET
MANHATTAN
AlterationSigned-off11/17/202112/29/2021
Design GENSLER
HEREWITH FILING INTERIOR RENOVATIONS TO 6TH FLOOR OFFICES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY PROPOSED UNDER THIS APPLICATIO…
M00630577 ↗88 PINE STREET
MANHATTAN
AlterationSigned-off11/17/202112/29/2021Herewith filing Plumbing Work in conjunction with Interior Renovations at the 6th Floor (Office Space). No change in use, egress or occupanc…
M00630587 ↗88 PINE STREET
MANHATTAN
AlterationSigned-off11/17/202112/26/2021Herewith filing modification to the Mechanical System in conjunction with 6th Floor Office Renovations. No change in use, egress or occupanc…
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
88 PINE STREET ↗407/19/2022
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/03/2026M00630344-I1 · 88 PINE STREETRequest digital key ↗
09/03/2026M00630577-I1 · 88 PINE STREETRequest digital key ↗
09/03/2026M00630577-P1 · 88 PINE STREETRequest digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications51
▸DOB NOWProgress Inspector Seal & Signature29
09/02/2026M00630467-P1 · 88 PINE STREETOpen ↗
09/01/2026M00630587-P5 · 88 PINE STREETOpen ↗
09/01/2026M00630587-P5 · 88 PINE STREETOpen ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/02/2026M00630467-P1 · 88 PINE STREETOpen ↗
09/02/2026M00630467-P1 · 88 PINE STREETOpen ↗
09/02/2026M00630467-P1 · 88 PINE STREETOpen ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026M00630344-I1 · 88 PINE STREETOpen ↗
09/03/2026M00630577-P1 · 88 PINE STREETOpen ↗
09/03/2026M00630577-I1 · 88 PINE STREETOpen ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/03/2026M00630344-I1 · 88 PINE STREETOpen ↗
09/03/2026M00630577-I1 · 88 PINE STREETOpen ↗
09/03/2026M00630577-P1 · 88 PINE STREETOpen ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type