| Owner | Filings | Most Recent |
|---|---|---|
| ORIENT OVERSEAS ASSOCIATES | 884 | 09/15/2026 |
| TEMCO SERVICE INDUSTRIES | 3 | 03/22/2026 |
| OWNER OF 88 PINE ST | 3 | 03/22/2026 |
| PINE PROPERTIES LLC | 1 | 03/22/2026 |
| NEW YORK REALTY | 1 | 03/22/2026 |
| MANAGEMENT BUILDING | 1 | 03/22/2026 |
| OOA | 3 | 03/21/2026 |
| ORIENT OVERSEAS ASSOCIATION | 2 | 03/21/2026 |
| ORIENT OVERSEAS ASSOCS | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| TSF ENGINEERING, PC | 77 | 06/03/2026 |
| ERIK OHRMAN ARCHITECT | 14 | 06/02/2026 |
| PEI COBB FREED & PARTNERS ARCHITETC | 2 | 08/21/2025 |
| PCS ENGINEERING | 3 | 07/28/2025 |
| JAROS BAUM & BOLLES | 2 | 06/24/2025 |
| LERA CONSULTING STRUCTURAL ENGINEER | 1 | 06/23/2025 |
| ARRA ARCHITECTURE | 12 | 08/25/2023 |
| MG ENGINEERING D.P.C. | 6 | 07/19/2022 |
| GENSLER | 2 | 03/25/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| METROPOLIS GROUP INC | 122 | 03/21/2026 |
| MUNICIPAL EXPEDITING | 76 | 03/21/2026 |
| OUTSOURCE CONSULTANTS, INC. | 16 | 03/21/2026 |
| RIGGING CONSULTANTS | 6 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| J. LYONS CONTRACTING INC | General Contractor | 87 | 07/08/2026 |
| PLBG P & H INC | Plumbing | 23 | 07/08/2026 |
| LYONS & DONAHUE CONT INC | General Contractor | 17 | 07/08/2026 |
| DEPENDABLE MECHANICAL COR | Fire Protection | 9 | 09/15/2026 |
| BRUCHE MECHANICAL NY LLC | Fire Protection | 6 | 07/08/2026 |
| A + SPRINKLER CORP | Fire Protection | 4 | 07/08/2026 |
| A&H EXPRESS PLBG&HTG CORP | Plumbing | 4 | 07/08/2026 |
| ISAKSEN, CHRISITAN | Electrical | 3 | 03/21/2026 |
| SCHIMENTI CONSTRUCTION CO | General Contractor | 3 | 07/08/2026 |
| DK CONSTRUCTION ONE, CORP | General Contractor | 3 | 04/09/2026 |
| GRILLO, ANTHONY | Electrical | 3 | 03/21/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 3 | 07/08/2026 |
| METFLOW FIRE CONTROL LLC | Fire Protection | 1 | 07/08/2026 |
| LAWRENCE, ALLISTER | Electrical | 1 | 03/21/2026 |
| AARON PLBG AND MECH SYST | Plumbing | 1 | 07/08/2026 |
| WATTERS, JR., J | Electrical | 1 | 03/21/2026 |
| ROBERT B. SAMUELS, INC. | Electrical | 1 | 03/22/2026 |
| A & F FIRE PROTECTION CO | Fire Protection | 1 | 07/08/2026 |
| FRANCIS RICHARDS | Electrical | 1 | 03/21/2026 |
| RALPH OCCHIPINTI | Electrical | 1 | 03/21/2026 |
| NAUM VAYNERMAN | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| B2 ENGINEERING D.P.C. | 5433 | 21 | 06/03/2026 |
| PCS ENGINEERING | 3745 | 3 | 07/28/2025 |
| CROSSCHECK INSPECTION SER | 544 | 2 | 06/24/2025 |
| JL SPECIAL INSPECTIONS LL | 9500 | 4 | 06/24/2025 |
| CONSULTING AND TESTING SE | 6152 | 50 | 05/14/2025 |
| OUTSOURCE SPECIAL INSPECT | 2827 | 8 | 07/19/2022 |
| PSI AGENCY INC. | 254 | 23 | 05/05/2022 |
| W. ALLEN ENGINEERING PLLC | 664 | 4 | 06/16/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | DEPENDABLE MECHANICAL COR | 09/14/2026 |
| DOB NOW | Plumbing | Permit Issued | DEPENDABLE MECHANICAL COR | 07/15/2026 |
| DOB NOW | General Construction | Permit Issued | J. LYONS CONTRACTING INC | 06/10/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | J. LYONS CONTRACTING INC | 06/10/2026 |
| DOB NOW | Plumbing | Signed-off | PLBG P & H INC | 06/08/2026 |
| DOB NOW | Plumbing | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 06/05/2026 |
| DOB NOW | Sprinklers | Permit Issued | PLBG P & H INC | 05/11/2026 |
| DOB NOW | General Construction | Permit Issued | J. LYONS CONTRACTING INC | 04/29/2026 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 04/07/2026 |
| DOB NOW | Plumbing | Signed-off | DEPENDABLE MECHANICAL COR | 04/07/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | J. LYONS CONTRACTING INC | 04/03/2026 |
| DOB NOW | General Construction | Permit Issued | J. LYONS CONTRACTING INC | 04/02/2026 |
| DOB NOW | Sprinklers | Permit Issued | DEPENDABLE MECHANICAL COR | 03/12/2026 |
| DOB NOW | Plumbing | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 03/12/2026 |
| DOB NOW | Mechanical Systems | Signed-off | J. LYONS CONTRACTING INC | 03/11/2026 |
| DOB NOW | General Construction | Permit Issued | J. LYONS CONTRACTING INC | 03/09/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | J. LYONS CONTRACTING INC | 03/06/2026 |
| DOB NOW | General Construction | Signed-off | J. LYONS CONTRACTING INC | 03/05/2026 |
| DOB NOW | Sprinklers | Permit Issued | DEPENDABLE MECHANICAL COR | 02/04/2026 |
| DOB NOW | Plumbing | Signed-off | PLBG P & H INC | 01/07/2026 |
| DOB NOW | General Construction | Permit Issued | J. LYONS CONTRACTING INC | 01/06/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | J. LYONS CONTRACTING INC | 12/03/2025 |
| DOB NOW | Plumbing | Permit Issued | DEPENDABLE MECHANICAL COR | 10/09/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | DK CONSTRUCTION ONE, CORP | 10/06/2025 |
| DOB NOW | Structural | Permit Issued | DK CONSTRUCTION ONE, CORP | 10/06/2025 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 10/03/2025 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 10/03/2025 |
| DOB NOW | General Construction | Permit Issued | DK CONSTRUCTION ONE, CORP | 10/01/2025 |
| DOB NOW | Sprinklers | Signed-off | PLBG P & H INC | 09/24/2025 |
| DOB NOW | General Construction | Permit Issued | J. LYONS CONTRACTING INC | 09/23/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | J. LYONS CONTRACTING INC | 09/23/2025 |
| DOB NOW | Sprinklers | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 09/18/2025 |
| DOB NOW | Sprinklers | Permit Issued | DEPENDABLE MECHANICAL COR | 09/18/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | M & L SIGNS, INC | 07/21/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | M & L SIGNS, INC | 07/03/2025 |
| DOB NOW | Sprinklers | Signed-off | PLBG P & H INC | 06/18/2025 |
| DOB NOW | Mechanical Systems | Signed-off | J. LYONS CONTRACTING INC | 04/28/2025 |
| DOB NOW | General Construction | Signed-off | J. LYONS CONTRACTING INC | 04/23/2025 |
| DOB NOW | Plumbing | Signed-off | PLBG P & H INC | 03/28/2025 |
| DOB NOW | General Construction | Signed-off | J. LYONS CONTRACTING INC | 03/27/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/25/2026 | Permit Issued | J. LYONS CONTRACTING INC | Heating and Air Conditioning Systems | Heat / Cool Florida Heat Pump CL-018 19,100 BTU · Wshp ×1 |
| 06/24/2025 | Permit Issued | DK CONSTRUCTION ONE, CORP | Heating Systems | Heating Jaga CLIMA CANAL H13 19,018 BTU · Fan Coil Indoor ×1 |
| 12/04/2023 | Permit Issued | J. LYONS CONTRACTING INC | Air Conditioning Systems | Cooling Climatemaster TS-036 1,200 CFM · Wshp ×4 |
| 08/25/2023 | Permit Issued | J. LYONS CONTRACTING INC | Air Conditioning Systems | Cooling Lg ARNU483M3A4 48,100 BTU · Vrf Indoor ×3 ARNU243SKS4 25,200 BTU · Vrf Indoor ×1 ARWM192DAS5 192,000 BTU · Vrf Outdoor ×1 |
| 08/06/2021 | Permit Issued | LYONS & DONAHUE CONT INC | Air Conditioning Systems | Cooling Climatemaster 50PCH070NCCFECF2 6 tons · Wshp ×1 |
| 04/01/2021 | Permit Issued | LYONS & DONAHUE CONT INC | Air Conditioning Systems, Ventilation Systems | Ventilation Greenheck SQ-100-VG 400 CFM · Exhaust Fan ×2 |
| 06/16/2020 | Permit Issued | LYONS & DONAHUE CONT INC | Associated Ducts and Piping | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/03/2026 | — | — | 9 heads |
| 03/25/2026 | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 67 heads |
| 03/02/2026 | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 38 heads |
| 12/02/2025 | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 34 heads |
| 09/19/2025 | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 111 heads |
| 06/24/2025 | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 26 heads |
| 08/25/2023 | — | — | 205 heads |
| 05/31/2023 | — | — | — |
| 09/23/2022 | — | — | 43 heads |
| 09/08/2022 | — | — | — |
| 08/02/2022 | — | — | 183 heads |
| 03/30/2022 | Permit Issued | A + SPRINKLER CORP | 195 heads |
| 03/01/2022 | — | — | 51 heads |
| 12/30/2021 | Permit Issued | METFLOW FIRE CONTROL LLC | 169 heads |
| 03/24/2020 | Permit Issued | AGGRESSIVE FIRE PROT LLC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/03/2026 | Signed-off | PLBG P & H INC | Water/Sanitary |
| 03/25/2026 | Permit Issued | DEPENDABLE MECH CORP | Water/Sanitary |
| 03/02/2026 | Permit Issued | DEPENDABLE MECH CORP | Water/Sanitary |
| 12/02/2025 | Signed-off | PLBG P & H INC | Water/Sanitary |
| 09/19/2025 | Signed-off | PLBG P & H INC | Water/Sanitary |
| 06/24/2025 | Permit Issued | DEPENDABLE MECH CORP | Storm |
| 08/25/2023 | Signed-off | PLBG P & H INC | Water/Sanitary |
| 05/31/2023 | Signed-off | PLBG P & H INC | Water/Sanitary |
| 07/20/2022 | Signed-off | PLBG INC | Water/Sanitary |
| 05/05/2022 | Signed-off | PLBG INC | Water/Sanitary |
| 03/30/2022 | Signed-off | PLBG INC | Water/Sanitary |
| 03/02/2022 | Signed-off | PLBG INC | Water/Sanitary |
| 04/01/2021 | Permit Issued | PLBG INC | Water/Sanitary |
| 06/30/2020 | Signed-off | PLBG INC | Water/Sanitary |
| 06/16/2020 | Signed-off | PLBG INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/24/2026 | Permit Issued | ROBERT B SAMUELS, INC | General Wiring |
| 03/30/2026 | Permit Issued | 2AK LIGHT ELECTRIC CORP | General Wiring |
| 03/25/2026 | Permit Issued | ROBERT B SAMUELS, INC | General Wiring |
| 02/02/2026 | Permit Issued | ROBERT B SAMUELS, INC | General Wiring |
| 10/07/2025 | Permit Issued | ROBERT B SAMUELS, INC | General Wiring |
| 10/03/2025 | Complete | ROBERT B SAMUELS, INC | General Wiring |
| 10/03/2025 | Complete | ROBERT B SAMUELS, INC | General Wiring |
| 09/18/2025 | Complete | ROBERT B SAMUELS, INC | General Wiring |
| 08/25/2025 | Complete | H. & L. ELECTRIC INC | General Wiring |
| 07/28/2025 | Permit Issued | H. & L. ELECTRIC INC | General Wiring |
| 07/28/2025 | Complete | H. & L. ELECTRIC INC | General Wiring |
| 04/18/2025 | Complete | ROBERT B SAMUELS, INC | General Wiring |
| 10/29/2024 | Complete | H. & L. ELECTRIC INC | General Wiring |
| 10/29/2024 | Complete | H. & L. ELECTRIC INC | General Wiring |
| 10/09/2024 | Complete | ROBERT B SAMUELS, INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/24/2025 | Permit Issued | DK CONSTRUCTION ONE, CORP | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/28/2025 | Permit Issued | M & L SIGNS, INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/02/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/25/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/17/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/28/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/26/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/26/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/07/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/09/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/02/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/28/2025 | Pass-Final SD - Up to 9 Requested Floors | Pass | View ↗ |
| 06/26/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/20/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/16/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/10/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/03/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/20/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/14/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/19/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/25/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/12/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/26/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/03/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/25/2026 | HVAC-R and service water piping design and insulation | Brian Bercarich | energy_progress |
| 05/25/2026 | Maintenance information | Brian Bercarich | energy_progress |
| 05/25/2026 | HVAC-R and service water heating equipment | Brian Bercarich | energy_progress |
| 05/25/2026 | HVAC-R and service water heating system controls | Brian Bercarich | energy_progress |
| 05/12/2026 | Mechanical Systems | Brian Bercarich | special |
| 05/12/2026 | HVAC-R and service water piping design and insulation | Brian Bercarich | energy_progress |
| 05/12/2026 | Maintenance information | Brian Bercarich | energy_progress |
| 05/12/2026 | Energy Code Compliance Inspections | Brian Bercarich | progress |
| 05/12/2026 | Sprinkler Systems | Brian Bercarich | special |
| 05/12/2026 | Final | Brian Bercarich | progress |
| 05/12/2026 | Fire-Resistant Penetrations and Joints | Brian Bercarich | special |
| 05/12/2026 | Post-installed Anchors | Brian Bercarich | special |
| 05/12/2026 | Final | Erik Ohrman | progress |
| 05/12/2026 | Fire-Resistant Penetrations and Joints | Brian Bercarich | special |
| 04/15/2026 | Fire-Resistant Penetrations and Joints | Brian Bercarich | special |
| 04/15/2026 | HVAC-R and service water piping design and insulation | Brian Bercarich | energy_progress |
| 04/15/2026 | HVAC-R and service water heating system controls | Brian Bercarich | energy_progress |
| 04/15/2026 | HVAC-R and service water heating equipment | Brian Bercarich | energy_progress |
| 04/15/2026 | Maintenance information | Brian Bercarich | energy_progress |
| 04/15/2026 | Fire-Resistant Penetrations and Joints | Brian Bercarich | special |
| 04/15/2026 | HVAC-R and service water piping design and insulation | Brian Bercarich | energy_progress |
| 04/15/2026 | Post-installed Anchors | Brian Bercarich | special |
| 04/15/2026 | Maintenance information | Brian Bercarich | energy_progress |
| 04/14/2026 | Sprinkler Systems | Brian Bercarich | special |
| 04/14/2026 | Final | Nicholas Tucci | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Modo Energy | Office | Floor 4 | Project M01401004 Project M01400992 |
| Kaiser Saurborn & Mair | Office | Floor 14 | Project M01345329 |
| Reinhardt Savic Foley | Office | Floor 5 | Project M01361990 |
| Marshall Dennehey | Office | Floor 28 | Project M01314868 |
| Highsnobiety | Office | Floor 17 | Project M01277273 |
| Wuersch & Gering | Office | Floor 20 | Project M01200237 |
| Carnegie Mellon University | Office | Floor 12 | Project M00907472 Project M00907476 Project M00907484 |
| Garwin Gerstein & Fisher | Office | Floor 28 | Project M00857953 Project M00857988 Project M00858011 |
| AppCard | Office | Floor 11 | Project M00795549 |
| Furman KORNFELD& Brennan | Office | Floor 32 | Project M00691516 |
| Coughlin Midlige & Garland | Office | Floor 28 | Project M00661202 Project M00665449 |
| AmWINS | Office | Floor 6 | Project M00630467 Project M00630577 Project M00630587 Project M00630344 |
| Edicom | Office | Floor 17 | Project M00360993 |
| Trollback+Company | Office | Floor 18 | Project M00351802 |
| Jia Law Group | Office | Floor 18 | Project M00318051 |