Barry's Williamsburg
Tenant
BROOKLYN · 5
1 building
5
Total Filings
5
Projects on File
1
Buildings Worked
0
Projects w/ Open Permits
Tenant
Primary Trade
Activity
Not enough dated projects to chart.
Portfolio status
Browse projects →
Signed off5100%
By project type
Alteration5
Most active buildings
All buildings →
185 NORTH 8TH STREETBROOKLYN · latest 06/10/2025
5 projects
Key relationships
Everyone →
Design firms
Filing representatives
Contractors
Owners
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B01143147 ↗185 NORTH 8TH STREET
BROOKLYN
AlterationSigned-off11/25/202406/10/2025STRUCTURAL WORK ON THE FIRST FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01143177 ↗185 NORTH 8TH STREET
BROOKLYN
AlterationSigned-off11/25/202401/07/2025MODIFICATION OF SPRINKLER SYSTEM ON THE FIRST FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01143088 ↗185 NORTH 8TH STREET
BROOKLYN
AlterationSigned-off11/25/202412/13/2024
Design DXU LLC
INTERIOR RENOVATION WORK ON THE FIRST FLOOR AS PER PLANS FILED. NO CHANGE TO USE EGRESS OR OCCUPANCY. (BARRY'S BOOTCAMP) HEALTH & FITNESS ES…
B01143102 ↗185 NORTH 8TH STREET
BROOKLYN
AlterationSigned-off11/25/202412/13/2024INSTALLATION OF HVAC EQUIPMENT ON THE FIRST FLOOR AND ROOF AS PER PLANS FILED. NO CHANGE TO USE EGRESS OR OCCUPANCY.
B01143123 ↗185 NORTH 8TH STREET
BROOKLYN
AlterationSigned-off11/25/202412/13/2024INSTALLATION OF PLUMBING FIXTURES ON THE FIRST FLOOR AND CELLAR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Counts cover all 5 projects (5 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Case Engineering211/11/2025
Custodio Consulting107/16/2025
Dxu111/25/2024
Madsen Consulting Engineering111/25/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Imperium Construction SE*311/11/2025
A + Sprinkler107/16/2025
A Plus Plumbing107/09/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Hampshire Properties411/11/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Custodio Consulting307/16/2025
Design Studio111/11/2025
5 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 5Signed off 5
5 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B01143147 ↗185 NORTH 8TH STREET
BROOKLYN
AlterationSigned-off11/25/202406/10/2025STRUCTURAL WORK ON THE FIRST FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01143177 ↗185 NORTH 8TH STREET
BROOKLYN
AlterationSigned-off11/25/202401/07/2025MODIFICATION OF SPRINKLER SYSTEM ON THE FIRST FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01143088 ↗185 NORTH 8TH STREET
BROOKLYN
AlterationSigned-off11/25/202412/13/2024
Design DXU LLC
INTERIOR RENOVATION WORK ON THE FIRST FLOOR AS PER PLANS FILED. NO CHANGE TO USE EGRESS OR OCCUPANCY. (BARRY'S BOOTCAMP) HEALTH & FITNESS ES…
B01143102 ↗185 NORTH 8TH STREET
BROOKLYN
AlterationSigned-off11/25/202412/13/2024INSTALLATION OF HVAC EQUIPMENT ON THE FIRST FLOOR AND ROOF AS PER PLANS FILED. NO CHANGE TO USE EGRESS OR OCCUPANCY.
B01143123 ↗185 NORTH 8TH STREET
BROOKLYN
AlterationSigned-off11/25/202412/13/2024INSTALLATION OF PLUMBING FIXTURES ON THE FIRST FLOOR AND CELLAR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
185 NORTH 8TH STREET ↗511/11/2025
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWSpecial Inspector Seal & Signature13
09/28/2026B01143177-I1 · 185 NORTH 8TH STREETOpen ↗
09/28/2026B01143177-I1 · 185 NORTH 8TH STREETOpen ↗
09/01/2026B01143088-I1 · 185 NORTH 8TH STREETOpen ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026B01143102-I1 · 185 NORTH 8TH STREETOpen ↗
08/23/2026B01143102-P1 · 185 NORTH 8TH STREETOpen ↗
08/23/2026B01143088-I1 · 185 NORTH 8TH STREETOpen ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B01143088-I1 · 185 NORTH 8TH STREETOpen ↗
09/01/2026B01143088-I1 · 185 NORTH 8TH STREETOpen ↗
08/31/2026B01143147-I1 · 185 NORTH 8TH STREETOpen ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWHPD-1: Anti-Harassment Area Checklist8
08/13/2026B01143177-P1 · 185 NORTH 8TH STREETOpen ↗
08/13/2026B01143088-I1 · 185 NORTH 8TH STREETOpen ↗
08/13/2026B01143102-I1 · 185 NORTH 8TH STREETOpen ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B01143102-I1 · 185 NORTH 8TH STREETOpen ↗