| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00890047 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/17/2023 | 09/22/2025 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor DEPENDABLE MECHANICAL COR Filer RIZZO GROUP | Install (103) new sprinkler heads and associated piping on the 18th Flr (CO)/23rd Flr (Mktg) and install (117) new sprinkler heads and pipin… |
| M00890038 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/13/2023 | 08/24/2023 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor P.S.I. MECHANICAL Filer RIZZO GROUP | Install new fixtures: (1) sink, (1) FD, (1) DW, (1) Chiller, (1) IM, (1) HWH on the 18th Flr (CO)/23rd Flr (Mktg) and (2) sink, (1) FD, (2) … |
| M00889988 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/18/2023 | 07/20/2023 | Owner CBRE, INC. Contractor OCGP LLC Filer RIZZO GROUP | Structural Modifications: Install new stair opening and new stair design between the 18-19th Floors (CO)/ 23-24th Flrs (Mktg) as per plans (… |
| M00890016 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/13/2023 | 07/19/2023 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor OCGP LLC Filer RIZZO GROUP | Modifications to the existing HVAC System: Redistribution of ductwork, relocate existing unit to new IT room, Install new unit, condensate p… |
| M00889898 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/17/2023 | 07/18/2023 | Owner CBRE, INC. Contractor OCGP LLC Filer RIZZO GROUP | Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 18-19th Flrs (CO… |
| M00657735 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 02/01/2022 | 02/18/2022 | Owner CBRE, INC. Contractor OCGP LLC Filer RIZZO GROUP | Minor interior alterations. Installation of new partitions, doors, suspended ceilings, flooring and finishes on the 30th Floor (CO)/ 35th Fl… |
| Name | Projects together | Most recent |
|---|---|---|
| B2 ENGINEERING PC | 3 | 10/23/2025 |
| Spectorgroup Architecture LLP | 2 | 07/17/2023 |
| ACTIVE DESIGN GROUP ENGINEERING | 1 | 07/18/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| OCGP LLC | 4 | 10/23/2025 |
| DEPENDABLE MECHANICAL COR | 1 | 07/17/2023 |
| P.S.I. MECHANICAL | 1 | 07/13/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| CBRE | 6 | 10/23/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| RIZZO GROUP | 6 | 10/23/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00890047 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/17/2023 | 09/22/2025 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor DEPENDABLE MECHANICAL COR Filer RIZZO GROUP | Install (103) new sprinkler heads and associated piping on the 18th Flr (CO)/23rd Flr (Mktg) and install (117) new sprinkler heads and pipin… |
| M00890038 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/13/2023 | 08/24/2023 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor P.S.I. MECHANICAL Filer RIZZO GROUP | Install new fixtures: (1) sink, (1) FD, (1) DW, (1) Chiller, (1) IM, (1) HWH on the 18th Flr (CO)/23rd Flr (Mktg) and (2) sink, (1) FD, (2) … |
| M00889988 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/18/2023 | 07/20/2023 | Owner CBRE, INC. Contractor OCGP LLC Filer RIZZO GROUP | Structural Modifications: Install new stair opening and new stair design between the 18-19th Floors (CO)/ 23-24th Flrs (Mktg) as per plans (… |
| M00890016 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/13/2023 | 07/19/2023 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor OCGP LLC Filer RIZZO GROUP | Modifications to the existing HVAC System: Redistribution of ductwork, relocate existing unit to new IT room, Install new unit, condensate p… |
| M00889898 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/17/2023 | 07/18/2023 | Owner CBRE, INC. Contractor OCGP LLC Filer RIZZO GROUP | Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 18-19th Flrs (CO… |
| M00657735 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 02/01/2022 | 02/18/2022 | Owner CBRE, INC. Contractor OCGP LLC Filer RIZZO GROUP | Minor interior alterations. Installation of new partitions, doors, suspended ceilings, flooring and finishes on the 30th Floor (CO)/ 35th Fl… |
| Building | Filings | Most Recent |
|---|---|---|
| 575 5 AVENUE ↗ | 6 | 10/23/2025 |