| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00827720 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 03/08/2023 | 03/13/2023 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor CMA PLUMBING & HEATING IN Filer RIZZO GROUP | Modifications to the existing Sprinkler System: Installation of (109) new sprinkler heads and associated sprinkler piping on the 29th Floor … |
| M00827707 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 03/08/2023 | 03/09/2023 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor A.W. & S. CONSTRUCTION CO Filer RIZZO GROUP | Modifications to the existing HVAC System: Relocation and Installation of new ductwork, VAVs and controls on the 29th Floor (CO)/ 34th Floor… |
| M00827718 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 03/08/2023 | 03/09/2023 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor P.S.I. MECHANICAL Filer RIZZO GROUP | Installation of new plumbing fixtures: (1) funnel drain, (2) pantry sinks, (1) dishwasher, (2) HWH's, (1) refrigerator w/ Icemaker and assoc… |
| Name | Projects together | Most recent |
|---|---|---|
| B2 ENGINEERING PC | 3 | 03/08/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| A.W. & S. CONSTRUCTION CO | 1 | 03/08/2023 |
| CMA PLUMBING & HEATING IN | 1 | 03/08/2023 |
| P.S.I. MECHANICAL | 1 | 03/08/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| CBRE | 3 | 03/08/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| RIZZO GROUP | 3 | 03/08/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00827720 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 03/08/2023 | 03/13/2023 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor CMA PLUMBING & HEATING IN Filer RIZZO GROUP | Modifications to the existing Sprinkler System: Installation of (109) new sprinkler heads and associated sprinkler piping on the 29th Floor … |
| M00827707 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 03/08/2023 | 03/09/2023 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor A.W. & S. CONSTRUCTION CO Filer RIZZO GROUP | Modifications to the existing HVAC System: Relocation and Installation of new ductwork, VAVs and controls on the 29th Floor (CO)/ 34th Floor… |
| M00827718 ↗ | 575 5 AVENUE MANHATTAN | Alteration | Signed-off | 03/08/2023 | 03/09/2023 | Design B2 ENGINEERING PC Owner CBRE, INC. Contractor P.S.I. MECHANICAL Filer RIZZO GROUP | Installation of new plumbing fixtures: (1) funnel drain, (2) pantry sinks, (1) dishwasher, (2) HWH's, (1) refrigerator w/ Icemaker and assoc… |
| Building | Filings | Most Recent |
|---|---|---|
| 575 5 AVENUE ↗ | 3 | 03/08/2023 |