| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01438024 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Permit Issued | 09/04/2026 | 09/25/2026 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | Structural modifications taking place on the 2nd & 3rd floor as per plans filed herewith. No change in use, egress or occupancy |
| M01438122 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Permit Issued | 09/04/2026 | 09/25/2026 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | Structural modifications taking place on the 23-25 Construction/ 24-26 Marketing floors as per plans filed herewith. No change in use, egres… |
| M01386215 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Permit Issued | 05/19/2026 | 05/21/2026 | Design GC ENG & ASSOCIATES, PC Owner KATO KAGAKU CO LTC Contractor UNITY CONSTRUCTION GROUP | Construction work on the 41st floor construction (42nd floor marketing) as indicated on drawings. |
| M01399174 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Filed — no permit on record | 05/20/2026 | — | Design JAROS BAUM & BOLLES Owner KATO KAGAKU CO LTC | — |
| M01366046 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Permit Issued | 04/21/2026 | 05/01/2026 | Design GC ENG & ASSOCIATES, PC Owner KATO KAGAKU CO LTC Contractor UNITY CONSTRUCTION GROUP | Construction work on the 24th floor construction (25th floor marketing) core bathrooms as indicated on drawings. |
| M01366305 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Permit Issued | 04/21/2026 | 04/28/2026 | Design GC ENG & ASSOCIATES, PC Owner KATO KAGAKU CO LTC Contractor UNITY CONSTRUCTION GROUP | Construction work on the 31st floor construction (32nd floor marketing) core bathrooms as indicated on drawings. |
| Name | Projects together | Most recent |
|---|---|---|
| MG Engineering | 32 | 09/14/2026 |
| GC Engineering & Associates | 12 | 05/19/2026 |
| Cosentini Associates | 3 | 05/19/2020 |
| Bahary Architecture | 2 | 12/14/2023 |
| Mdeas Architects | 2 | 09/14/2026 |
| Severud Associates | 2 | 09/14/2026 |
| Fmo Engineering | 1 | 11/06/2023 |
| Jaros Baum & Bolles | 1 | 05/20/2026 |
| Loffredo Brooks Architects | 1 | 05/20/2026 |
| Tread A&D | 1 | 10/05/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| Tri-Star Construction | 12 | 12/24/2025 |
| Unity Construction Group | 10 | 05/19/2026 |
| Par Plumbing Co | 5 | 10/05/2022 |
| Abco Peerless Sprinkler | 4 | 10/26/2023 |
| S.B.A. Plumbing | 4 | 10/10/2025 |
| Par Fire Protection | 3 | 09/14/2026 |
| Aggressive Fire Protection | 2 | 03/13/2023 |
| City/Suburban Plumbing | 2 | 10/06/2025 |
| Full Capacity Fire | 2 | 10/06/2025 |
| Preferred Mechanical | 2 | 09/14/2026 |
| Renotech Interiors | 2 | 12/14/2023 |
| Structure Tone | 2 | 09/14/2026 |
| Unispace of Boston | 2 | 08/03/2023 |
| Hudson Black | 1 | 04/27/2020 |
| M&T Plumbing and Heating Co | 1 | 04/27/2020 |
| Tristate Plumbing Services | 1 | 11/02/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| Kato Kagaku Co LTC | 52 | 09/14/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Archetype Consultants | 34 | 05/19/2026 |
| Metropolis Group | 3 | 08/03/2023 |
| Rizzo Group | 2 | 09/14/2026 |
| A1 Expediting Service | 1 | 05/20/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01438024 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Permit Issued | 09/04/2026 | 09/25/2026 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | Structural modifications taking place on the 2nd & 3rd floor as per plans filed herewith. No change in use, egress or occupancy |
| M01438122 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Permit Issued | 09/04/2026 | 09/25/2026 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor STRUCTURE TONE, LLC Filer RIZZO GROUP | Structural modifications taking place on the 23-25 Construction/ 24-26 Marketing floors as per plans filed herewith. No change in use, egres… |
| M01386215 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Permit Issued | 05/19/2026 | 05/21/2026 | Design GC ENG & ASSOCIATES, PC Owner KATO KAGAKU CO LTC Contractor UNITY CONSTRUCTION GROUP | Construction work on the 41st floor construction (42nd floor marketing) as indicated on drawings. |
| M01399174 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Filed — no permit on record | 05/20/2026 | — | Design JAROS BAUM & BOLLES Owner KATO KAGAKU CO LTC | — |
| M01366046 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Permit Issued | 04/21/2026 | 05/01/2026 | Design GC ENG & ASSOCIATES, PC Owner KATO KAGAKU CO LTC Contractor UNITY CONSTRUCTION GROUP | Construction work on the 24th floor construction (25th floor marketing) core bathrooms as indicated on drawings. |
| M01366305 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Permit Issued | 04/21/2026 | 04/28/2026 | Design GC ENG & ASSOCIATES, PC Owner KATO KAGAKU CO LTC Contractor UNITY CONSTRUCTION GROUP | Construction work on the 31st floor construction (32nd floor marketing) core bathrooms as indicated on drawings. |
| M01329338 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 01/15/2026 | 02/02/2026 | Design GC ENG & ASSOCIATES, PC Owner KATO KAGAKU CO LTC Contractor UNITY CONSTRUCTION GROUP | Interior demolition of non load bearing partitions on the 3rd floor, 23rd floor construction (24th floor marketing) and 24th floor construc… |
| M01277175 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 10/10/2025 | 10/24/2025 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor S.B.A. PLUMBING CORP | Plumbing work on the 30th floor (31st floor marketing) as indicated on drawings. |
| M01277183 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 10/10/2025 | 10/24/2025 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor S.B.A. PLUMBING CORP | Sprinkler work on the 30th floor construction (31st floor marketing) as indicated on drawings. |
| M01277153 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 10/10/2025 | 10/23/2025 | Design GC ENG & ASSOCIATES, PC Owner KATO KAGAKU CO LTC Contractor TRI-STAR CONSTRUCTION COR | Architectural work on the 30th floor construction (31st floor marketing/tenant) as indicated on drawings. |
| M01277165 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 10/10/2025 | 10/23/2025 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor TRI-STAR CONSTRUCTION COR | Mechanical work on the 30th floor construction (31st floor marketing/tenant) as indicated on drawings. |
| M01276066 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 10/06/2025 | 10/08/2025 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor CITY/SUBURBAN PLBG CORP | Plumbing work on the 35th floor construction (36th floor marketing/tenant) as indicated on drawings. |
| M01276060 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 10/06/2025 | 10/07/2025 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor TRI-STAR CONSTRUCTION COR | Mechanical work on the 35th floor construction (36th floor marketing/tenant) as indicated on drawings. |
| M01276070 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Permit Issued | 10/06/2025 | 10/07/2025 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor FULL CAPACITY FIRE CORP | Sprinkler work on the 35th floor construction (36th floor marketing/tenant) as indicated on drawings. |
| M01270207 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 09/05/2025 | 09/24/2025 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor FULL CAPACITY FIRE CORP | Sprinkler work on the 6th and 7th floors as indicated on drawings. |
| M01270193 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 09/09/2025 | 09/18/2025 | Design GC ENG & ASSOCIATES, PC Owner KATO KAGAKU CO LTC Contractor TRI-STAR CONSTRUCTION COR | Construction work on the 6th and 7th floors as indicated on drawings. |
| M01227896 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 07/03/2025 | 07/17/2025 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor S.B.A. PLUMBING CORP | Plumbing work on the 31st floor (NW suite) as indicated on drawings. |
| M01227899 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 07/03/2025 | 07/15/2025 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor S.B.A. PLUMBING CORP | Sprinkler work on the 31st floor (NW suite) as indicated on drawings. |
| M01227883 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 07/03/2025 | 07/08/2025 | Design GC ENG & ASSOCIATES, PC Owner KATO KAGAKU CO LTC Contractor TRI-STAR CONSTRUCTION COR | Construction work on the 31st floor (NW suite) as indicated on drawings. |
| M01111886 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 10/03/2024 | 11/04/2024 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor CITY/SUBURBAN PLBG CORP | Plumbing work on the 33rd floor as indicated on drawings. |
| M01111867 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 10/03/2024 | 10/18/2024 | Design GC ENG & ASSOCIATES, PC Owner KATO KAGAKU CO LTC Contractor TRI-STAR CONSTRUCTION COR | Architectural work on the 33rd floor as indicated on drawings. EN drawings for lighting are submitted under M01111874-I1 |
| M01111874 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 10/03/2024 | 10/18/2024 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor TRI-STAR CONSTRUCTION COR | Mechanical work on the 33rd floor as indicated on drawings. |
| M00943596 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 10/26/2023 | 11/15/2023 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor ABCO-PEERLESS SPRKLR CORP | Sprinkler work on the 29th floor as inidcated on drawings |
| M00943577 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 11/03/2023 | 11/13/2023 | Design GC ENG & ASSOCIATES, PC Owner KATO KAGAKU CO LTC Contractor TRI-STAR CONSTRUCTION COR | Architectural work on the 29th floor as indicated on drawings |
| M00943582 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 10/26/2023 | 11/02/2023 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor TRI-STAR CONSTRUCTION COR | Mechanical work on the 29th floor as indicated on drawings |
| M00943591 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Filed — no permit on record | 10/26/2023 | — | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC | — |
| M00880264 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 06/22/2023 | 07/13/2023 | Design BAHARY ARCHITECTURE PC Owner KATO KAGAKU CO LTC Contractor RENOTECH INTERIORS INC | GENERAL CONSTRUCTION-ARCHITECTURAL WORK ON THE 39TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00812791 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 03/13/2023 | 04/18/2023 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor AGGRESSIVE FIRE PROT LLC | Sprinkler work ; temporary sprinkler loop on the 31st floor as indicated on drawings |
| M00809529 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 03/20/2023 | 04/06/2023 | Design GC ENG & ASSOCIATES, PC Owner KATO KAGAKU CO LTC Contractor UNITY CONSTRUCTION GROUP | Interior demolition and architectural work on the 31st floor as indicated on drawings. EN drawings for lighting are submitted under M0081275… |
| M00812758 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 03/13/2023 | 04/06/2023 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor UNITY CONSTRUCTION GROUP | Mechanical work on the 31st floor (tenant/common elevator lobby/corridor) as indicated on drawings |
| M00787560 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 10/05/2022 | 12/07/2022 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor PAR PLUMBING CO., INC Filer METROPOLIS GROUP INC | Modification to the plumbing and sprinkler system on the 36th FL, for the QIC office. No change of use, egress or occupancy. |
| M08028280 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 11/08/2022 | 11/18/2022 | Design BAHARY ARCHITECTURE PC Owner KATO KAGAKU CO LTC Contractor RENOTECH INTERIORS INC | GENERAL CONSTRUCTION- ARCHITECTURAL WORK ON THE 39TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00787545 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 10/13/2022 | 10/26/2022 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor UNISPACE OF BOSTON LLC Filer METROPOLIS GROUP INC | Modification of the mechanical system on the 36th FL office space QIC. No change of use, egress or occupancy. |
| M00787480 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 10/05/2022 | 10/12/2022 | Design TREAD A&D LLC Owner KATO KAGAKU CO LTC Contractor UNISPACE OF BOSTON LLC Filer METROPOLIS GROUP INC | Interior renovation of office space on the 36th FL. No change of use, egress or occupancy. |
| M00626569 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 11/15/2021 | 06/24/2022 | Design GC ENG & ASSOCIATES, PC Owner KATO KAGAKU CO LTC Contractor UNITY CONSTRUCTION GROUP | Architectural work on the 1st floor (lobby repairs) as indicated on drawings. |
| M00646883 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 12/30/2021 | 06/24/2022 | Design FMO ENGINEERING PC Owner KATO KAGAKU CO LTC Contractor UNITY CONSTRUCTION GROUP | Structural changes on the 1st floor (catwalk) as indicated on drawings |
| M00593773 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 10/01/2021 | 11/05/2021 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor PAR PLUMBING CO., INC | Plumbing work on the 42nd floor (Toban) as indicated on drawings |
| M00569914 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 09/14/2021 | 11/03/2021 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor PAR PLUMBING CO., INC | Plumbing work on the 29th floor as indicated on drawings. |
| M00594131 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 10/01/2021 | 10/07/2021 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor ABCO-PEERLESS SPRKLR CORP | Sprinkler work on t he 42nd floor (Toban) as indicated on drawings. |
| M00593421 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 10/01/2021 | 10/06/2021 | Design GC ENG & ASSOCIATES, PC Owner KATO KAGAKU CO LTC Contractor TRI-STAR CONSTRUCTION COR | Construction work on the 42nd floor (Toban) as indicated on drawings. |
| M00593764 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 10/01/2021 | 10/04/2021 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor TRI-STAR CONSTRUCTION COR | Mechanical work on the 42nd floor (Toban) as indicated on drawings |
| M00569918 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 09/14/2021 | 09/29/2021 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor ABCO-PEERLESS SPRKLR CORP | Sprinkler work on the 29th floor as indicated on drawings. |
| M00227879 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Permit Issued | 12/13/2019 | 03/19/2021 | Design COSENTINI ASSOCIATES Owner KATO KAGAKU CO LTC Contractor M&T PLBG AND HTG CO., INC | Plumbing work as shown on plans. |
| M00404592 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 11/02/2020 | 11/10/2020 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor TRISTATE PLBG SVCS CORP | Plumbing work on the 30th floor as indicated on drawings |
| M00404578 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 11/02/2020 | 11/05/2020 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor UNITY CONSTRUCTION GROUP | Mechanical work on the 30th floor as indicated on drawings. |
| M00287712 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 01/28/2020 | 07/23/2020 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor PAR PLUMBING CO., INC | removal of plumbing fixtures and capping of piping on the 30th floor |
| M00287705 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 01/28/2020 | 04/06/2020 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor TRI-STAR CONSTRUCTION COR | removal of mechanical ductwork on the 30th floor as indicated on drawings. |
| M00227868 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Permit Issued | 12/13/2019 | 03/03/2020 | Design COSENTINI ASSOCIATES Owner KATO KAGAKU CO LTC Contractor HUDSON BLACK INC | Mechanical work as shown on plans. |
| M00227887 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Permit Issued | 12/30/2019 | 02/04/2020 | Design COSENTINI ASSOCIATES Owner KATO KAGAKU CO LTC Contractor AGGRESSIVE FIRE PROT LLC | Removal of existing sprinkler heads and installation of temporary loop. |
| M00264617 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 12/04/2019 | 01/07/2020 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor UNITY CONSTRUCTION GROUP | Mechanical work on the 44th floor (Echo Street Capital) as indicated on drawings. |
| M00264626 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 12/04/2019 | 01/06/2020 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor PAR PLUMBING CO., INC | Plumbing work on the 44th floor (Echo Street Capital) as indicated on drawings. |
| M00264635 ↗ | 12 EAST 49TH STREET MANHATTAN | Alteration | Signed-off | 12/04/2019 | 01/06/2020 | Design MG ENGINEERING D.P.C. Owner KATO KAGAKU CO LTC Contractor LAWRENCE J. LEVINE | Sprinkler work on the 44th floor (Echo Street Capital) as indicated on drawings |
| Building | Filings | Most Recent |
|---|---|---|
| 12 EAST 49TH STREET ↗ | 52 | 09/14/2026 |