| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00275877 ↗ | 275 7 AVENUE MANHATTAN | Alteration | Signed-off | 12/22/2020 | 01/21/2021 | Design EP ENGINEERING LLC Owner CBRE INC Contractor NYC FIRE SPRINKLER CORP Filer METROPOLIS GROUP INC | Removal, installation and replacement of plumbing fixtures as shown on drawings. Modification to existing sprinkler system and related pipi… |
| Name | Projects together | Most recent |
|---|---|---|
| EP ENGINEERING LLC | 1 | 05/04/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| NYC FIRE SPRINKLER CORP | 1 | 05/04/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| CBRE | 1 | 05/04/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00275877 ↗ | 275 7 AVENUE MANHATTAN | Alteration | Signed-off | 12/22/2020 | 01/21/2021 | Design EP ENGINEERING LLC Owner CBRE INC Contractor NYC FIRE SPRINKLER CORP Filer METROPOLIS GROUP INC | Removal, installation and replacement of plumbing fixtures as shown on drawings. Modification to existing sprinkler system and related pipi… |
| Building | Filings | Most Recent |
|---|---|---|
| 275 7 AVENUE ↗ | 1 | 05/04/2021 |